{"operation":"document","citation":"CPF 120135012M","title":"SUNOCO PIPELINE L.P. — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-07-16","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a), 195.402(c)(13), 195.402(c)(3), 195.402(c)(5), 195.402(e)(6), 195.402(e)(8), 195.403(a)(2), 195.403(a)(3), 195.428(a), 195.579(b)(2).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135012m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135012m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135012m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120135012M","body":"Notice of Amendment involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(13),  195.402(c)(3),  195.402(c)(5),  195.402(e)(6),  195.402(e)(8),  195.403(a)(2),  195.403(a)(3),  195.428(a),  195.579(b)(2). The case was opened on 2013-07-16 and is reported as closed as of 2014-04-24. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120135012M_Closure Letter_04242014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_Closure%20Letter_04242014.pdf\n\n120135012M_Closure Letter_04242014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_Closure%20Letter_04242014_text.pdf\n\n120135012M_NOA_07162013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_NOA_07162013.pdf\n\n120135012M_NOA_07162013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_NOA_07162013_text.pdf\n\n120135012M_Operator Response and Request for Time Extension_08222013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_Operator%20Response%20and%20Request%20for%20Time%20Extension_08222013.pdf\n\n120135012M_Closure Letter_04242014_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nOVERNIGHT EXPRESS MAIL\nApril 24, 2014\nMr. David Chalson, Vice President, Operations\nSunoco Pipeline, L.P.\n4041 Market Street\nAston, PA 19014\nCPF 1-2013-5012M\nDear Mr. Chalson:\nDuring the week of August 13, 2012, representatives from the Pipeline and Hazardous Materials\nSafety Administration and the New York Department of Public Service, pursuant to chapter 601\nof 49 United States Code, conducted an on-site pipeline safety inspection of Sunoco Pipeline’s\n(Sunoco) procedures in Philadelphia, Pennsylvania. As a result of the inspection, Sunoco was\nissued a Notice of Amendment on July 16, 2013, which proposed amendment of your\nprocedures.\nSunoco submitted its amended procedures on April 9, 2014. My staff has reviewed the amended\nprocedures, and it appears that the inadequacies outlined in the Notice of Amendment have been\ncorrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2491}