# SUNOCO PIPELINE L.P. — Notice of Amendment

- **operation:** document
- **citation:** CPF 120135012M
- **title:** SUNOCO PIPELINE L.P. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-07-16
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(13), 195.402(c)(3), 195.402(c)(5), 195.402(e)(6), 195.402(e)(8), 195.403(a)(2), 195.403(a)(3), 195.428(a), 195.579(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120135012m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120135012m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120135012m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120135012M
**body:**

Notice of Amendment involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(13),  195.402(c)(3),  195.402(c)(5),  195.402(e)(6),  195.402(e)(8),  195.403(a)(2),  195.403(a)(3),  195.428(a),  195.579(b)(2). The case was opened on 2013-07-16 and is reported as closed as of 2014-04-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120135012M_Closure Letter_04242014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_Closure%20Letter_04242014.pdf

120135012M_Closure Letter_04242014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_Closure%20Letter_04242014_text.pdf

120135012M_NOA_07162013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_NOA_07162013.pdf

120135012M_NOA_07162013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_NOA_07162013_text.pdf

120135012M_Operator Response and Request for Time Extension_08222013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135012M/120135012M_Operator%20Response%20and%20Request%20for%20Time%20Extension_08222013.pdf

120135012M_Closure Letter_04242014_text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
OVERNIGHT EXPRESS MAIL
April 24, 2014
Mr. David Chalson, Vice President, Operations
Sunoco Pipeline, L.P.
4041 Market Street
Aston, PA 19014
CPF 1-2013-5012M
Dear Mr. Chalson:
During the week of August 13, 2012, representatives from the Pipeline and Hazardous Materials
Safety Administration and the New York Department of Public Service, pursuant to chapter 601
of 49 United States Code, conducted an on-site pipeline safety inspection of Sunoco Pipeline’s
(Sunoco) procedures in Philadelphia, Pennsylvania. As a result of the inspection, Sunoco was
issued a Notice of Amendment on July 16, 2013, which proposed amendment of your
procedures.
Sunoco submitted its amended procedures on April 9, 2014. My staff has reviewed the amended
procedures, and it appears that the inadequacies outlined in the Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Byron Coy
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2491
