{"operation":"document","citation":"CPF 120135016M","title":"SUNOCO PIPELINE L.P. — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-07-29","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135016m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135016m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135016m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120135016M","body":"Notice of Amendment involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2013-07-29 and is reported as closed as of 2014-02-18. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120135016M_Closure Letter_02182014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135016M/120135016M_Closure%20Letter_02182014.pdf\n\n120135016M_Closure Letter_02182014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135016M/120135016M_Closure%20Letter_02182014_text.pdf\n\n120135016M_NOA_07292013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135016M/120135016M_NOA_07292013.pdf\n\n120135016M_NOA_07292013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135016M/120135016M_NOA_07292013_text.pdf\n\n120135016M_Operator_Response_and_Request_for_Time_Extension_08212013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135016M/120135016M_Operator_Response_and_Request_for_Time_Extension_08212013.pdf\n\n120135016M_Closure Letter_02182014_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nOVERNIGHT EXPRESS DELIVERY\nFebruary 18, 2014\nDavid Chalson\nVice President, Operations\nSunoco Pipeline L.P.\n4041 Market Street\nAston, PA 19014\nCPF 1-2013-5016M\nDear Mr. Chalson:\nFrom September 4 - 7, 2012, a representative from the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49\nUnited States Code, conducted an on-site pipeline safety inspection of Sunoco Pipeline L.P.’s\n(Sunoco) procedures in Trenton, New Jersey. As a result of this inspection, Sunoco was issued a\nNotice of Amendment on July 29, 2013, which proposed amendment of your procedures.\nSunoco submitted its amended procedures on January 13, 2014. My staff reviewed the amended\nprocedures, and it appears that the inadequacies outlined in this Notice of Amendment have been\ncorrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2328}