# BUCKEYE PARTNERS, LP — Notice of Amendment

- **operation:** document
- **citation:** CPF 120135027M
- **title:** BUCKEYE PARTNERS, LP — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-11-25
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120135027m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120135027m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120135027m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120135027M
**body:**

Notice of Amendment involving BUCKEYE PARTNERS, LP. PHMSA's enforcement data identifies the cited regulation as 195.402(c)(3). The case was opened on 2013-11-25 and is reported as closed as of 2014-01-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120135027M_Closure Letter_01302014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135027M/120135027M_Closure%20Letter_01302014.pdf

120135027M_Closure Letter_01302014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135027M/120135027M_Closure%20Letter_01302014_text.pdf

120135027M_NOA_11252013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135027M/120135027M_NOA_11252013.pdf

120135027M_NOA_11252013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135027M/120135027M_NOA_11252013_text.pdf

120135027M_Operator Response_12202013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135027M/120135027M_Operator%20Response_12202013.pdf

120135027M_Closure Letter_01302014_text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
OVERNIGHT EXPRESS MAIL
January 30, 2014
Thomas Scott Collier
VP, Performance Assurance & Asset Integrity
Buckeye Partners, L.P.
Five TEK Park
9999 Hamilton Boulevard
Breinigsville, PA 18031
CPF 1-2013-5027M
Dear Mr. Collier:
On August 16, 2013, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to chapter 601 of 49 United
States Code, investigated an accident that occurred during the filling process of Breakout Tank
91 at Buckeye Partners, L.P.’s (Buckeye) Linden Station in Linden, NJ. As a result of the
investigation, Buckeye was issued a Notice of Amendment on November 25, 2013, which
proposed amendment of your procedures.
Buckeye submitted its amended procedures on January 23, 2014. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2355
