{"operation":"document","citation":"CPF 120136003M","title":"ADELPHIA GATEWAY, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-11-29","effective_on":null,"summary":"CLOSED notice of amendment citing 195.446(c)(2).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120136003m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120136003m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120136003m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120136003M","body":"Notice of Amendment involving ADELPHIA GATEWAY, LLC. PHMSA's enforcement data identifies the cited regulation as 195.446(c)(2). The case was opened on 2013-11-29 and is reported as closed as of 2014-01-23. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120136003M_Closure Letter_01232014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120136003M/120136003M_Closure%20Letter_01232014.pdf\n\n120136003M_Closure Letter_01232014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120136003M/120136003M_Closure%20Letter_01232014_text.pdf\n\n120136003M_NOA_11292013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120136003M/120136003M_NOA_11292013.pdf\n\n120136003M_NOA_11292013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120136003M/120136003M_NOA_11292013_text.pdf\n\n120136003M_Operator Response_12262013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120136003M/120136003M_Operator%20Response_12262013.pdf\n\n120136003M_Closure Letter_01232014_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nOVERNIGHT EXPRESS DELIVERY\nJanuary 23, 2014\nDennis Murphy\nVice President\nPPL Interstate Energy Company\n2 North Ninth Street\nAllentown, PA 18101\nCPF 1-2013-6003M\nDear Mr. Murphy:\nFrom June 17, 2013 to June 21, 2013, a representative of the Pipeline and Hazardous Materials\nSafety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected\nPPL Interstate Energy Company (PPLIEC) procedures for Control Room Management in\nPottstown, Pennsylvania. As a result of the inspection, PPLIEC was issued a Notice of\nAmendment on November 29, 2013, which proposed amendment of your procedures.\nPPLIEC submitted its amended procedures on December 26, 2013. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2247}