{"operation":"document","citation":"CPF 120143001M","title":"COLUMBIA GAS TRANSMISSION, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2014-02-27","effective_on":null,"summary":"CLOSED notice of amendment citing 193.2509(b)(3), 193.2513(b)(6), 193.2605(b)(1), 193.2903(g).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120143001m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120143001m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120143001m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120143001M","body":"Notice of Amendment involving COLUMBIA GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulations as 193.2509(b)(3),  193.2513(b)(6),  193.2605(b)(1),  193.2903(g). The case was opened on 2014-02-27 and is reported as closed as of 2014-05-19. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120143001M_Closure Letter_05192014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143001M/120143001M_Closure%20Letter_05192014.pdf\n\n120143001M_Closure Letter_05192014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143001M/120143001M_Closure%20Letter_05192014_text.pdf\n\n120143001M_NOA_02272014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143001M/120143001M_NOA_02272014.pdf\n\n120143001M_NOA_02272014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143001M/120143001M_NOA_02272014_text.pdf\n\n120143001M_Operator Response_04252014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143001M/120143001M_Operator%20Response_04252014.pdf\n\n120143001M_Closure Letter_05192014_text.pdf\n\nU.S. Department of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nEXPRESS OVERNIGHT DELIVERY\nMay 19, 2014\nShawn Patterson\nPresident, Engineering & Project Development\nColumbia Gas Transmission, L.L.C.\n1700 MacCorkle Avenue, SE\nCharleston, WV 25314\nCPF 1-2014-3001M\nDear Mr. Patterson:\nDuring the week of November 13, 2012, a representative from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of Columbia Gas Transmission’s (Columbia)\nprocedures at the LNG Facility in Chesapeake, Virginia. As a result of the inspection, Columbia\nwas issued a Notice of Amendment on February 27, 2014 which proposed amendment of your\nprocedures.\nColumbia submitted its amended procedures on April 25, 2014. My staff has reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2386}