{"operation":"document","citation":"CPF 120143005M","title":"TOTAL PEAKING SERVICES — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2014-12-16","effective_on":null,"summary":"CLOSED notice of amendment citing 193.2509(b)(3), 193.2605(b).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120143005m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120143005m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120143005m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120143005M","body":"Notice of Amendment involving TOTAL PEAKING SERVICES. PHMSA's enforcement data identifies the cited regulations as 193.2509(b)(3),  193.2605(b). The case was opened on 2014-12-16 and is reported as closed as of 2015-03-09. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120143005M_ NOA_12162014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_%20NOA_12162014_text.pdf\n\n120143005M_Closure Letter_ 03092015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_Closure%20Letter_%2003092015_text.pdf\n\n120143005M_Closure Letter_03092015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_Closure%20Letter_03092015.pdf\n\n120143005M_NOA_12162014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_NOA_12162014.pdf\n\n120143005M_Operator_Response_Notice_01142015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_Operator_Response_Notice_01142015.pdf\n\n120143005M_Closure Letter_ 03092015_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nEXPRESS OVERNIGHT DELIVERY\nMarch 09, 2015\nMr. Robert Allessio\nSenior Vice President\nUnited Resources, Inc.\n157 Church Street\nNew Haven, CT 06510\nCPF 1-2014-3005M\nDear Mr. Allessio:\nBetween April 7-10, 2014, inspectors from the Connecticut Department of Energy and Environmental\nProtection (DEEP), acting as agents for the Pipeline and Hazardous Materials Safety Administration\n(PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected Total Peaking Services (TPS)\nprocedures for the Total Peaking Services LNG plant (TPS) in Milford, CT.\nAs a result of the inspection, TPS was issued a Notice of Amendment on December 16, 2014, which\nproposed amendment of your procedures.\nTPS submitted its amended procedures on January 26, 2015, and again on February 27, 2015.\nMy staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you for your\ncooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration\nCc: Mr. Karl Baker, CT DEEP\n\n120143005M_Closure Letter_03092015.pdf\n\n0\nU.S. Department\nOf Transportation\nPipeline and\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\n609-989.2171\nEXPRESS OVERNIGHT DELIVERY\nMarch 09, 2015\nMr. Robert Allessio\nSenior Vice President\nUnited Resources, Inc.\n157 Church Street\nNew Haven, CT 06510\nCPF 1-2014-3005M\nDear Mr. Allessio:\nBetween April 7-10, 2014, inspectors from the Connecticut Department of Energy and Environmental\nProtection (DEEP), acting as agents for the Pipeline and Hazardous Materials Safety Administration\n(PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected Total Peaking Services (TPS)\nprocedures for the Total Peaking Services LNG plant (TPS) in Milford, CT.\nAs a result of the inspection, TPS was issued a Notice of Amendment on December 16, 2014, which\nproposed amendment of your procedures.\nTPS submitted its amended procedures on January 26, 2015, and again on February 27, 2015.\nMy staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you for your\ncooperation.\nSincerely,\n~~~t\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration\nCc: Mr. Karl Baker, CT DEEP","truncated":false,"body_characters":3790}