# TOTAL PEAKING SERVICES — Notice of Amendment

- **operation:** document
- **citation:** CPF 120143005M
- **title:** TOTAL PEAKING SERVICES — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-12-16
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 193.2509(b)(3), 193.2605(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120143005m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120143005m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120143005m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120143005M
**body:**

Notice of Amendment involving TOTAL PEAKING SERVICES. PHMSA's enforcement data identifies the cited regulations as 193.2509(b)(3),  193.2605(b). The case was opened on 2014-12-16 and is reported as closed as of 2015-03-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120143005M_ NOA_12162014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_%20NOA_12162014_text.pdf

120143005M_Closure Letter_ 03092015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_Closure%20Letter_%2003092015_text.pdf

120143005M_Closure Letter_03092015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_Closure%20Letter_03092015.pdf

120143005M_NOA_12162014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_NOA_12162014.pdf

120143005M_Operator_Response_Notice_01142015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120143005M/120143005M_Operator_Response_Notice_01142015.pdf

120143005M_Closure Letter_ 03092015_text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
EXPRESS OVERNIGHT DELIVERY
March 09, 2015
Mr. Robert Allessio
Senior Vice President
United Resources, Inc.
157 Church Street
New Haven, CT 06510
CPF 1-2014-3005M
Dear Mr. Allessio:
Between April 7-10, 2014, inspectors from the Connecticut Department of Energy and Environmental
Protection (DEEP), acting as agents for the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected Total Peaking Services (TPS)
procedures for the Total Peaking Services LNG plant (TPS) in Milford, CT.
As a result of the inspection, TPS was issued a Notice of Amendment on December 16, 2014, which
proposed amendment of your procedures.
TPS submitted its amended procedures on January 26, 2015, and again on February 27, 2015.
My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for your
cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Cc: Mr. Karl Baker, CT DEEP

120143005M_Closure Letter_03092015.pdf

0
U.S. Department
Of Transportation
Pipeline and
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
609-989.2171
EXPRESS OVERNIGHT DELIVERY
March 09, 2015
Mr. Robert Allessio
Senior Vice President
United Resources, Inc.
157 Church Street
New Haven, CT 06510
CPF 1-2014-3005M
Dear Mr. Allessio:
Between April 7-10, 2014, inspectors from the Connecticut Department of Energy and Environmental
Protection (DEEP), acting as agents for the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected Total Peaking Services (TPS)
procedures for the Total Peaking Services LNG plant (TPS) in Milford, CT.
As a result of the inspection, TPS was issued a Notice of Amendment on December 16, 2014, which
proposed amendment of your procedures.
TPS submitted its amended procedures on January 26, 2015, and again on February 27, 2015.
My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for your
cooperation.
Sincerely,
~~~t
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Cc: Mr. Karl Baker, CT DEEP
- **truncated:** false