# RICHMOND, CITY OF — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 120150008
- **title:** RICHMOND, CITY OF — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-03-17
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.465(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120150008.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120150008.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120150008
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120150008
**body:**

Notice of Probable Violation involving RICHMOND, CITY OF. PHMSA's enforcement data identifies the cited regulation as 192.465(a). The case was opened on 2015-03-17 and is reported as closed as of 2017-11-21. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120150008_Closure Letter_11212017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120150008/120150008_Closure%20Letter_11212017.pdf

120150008_Closure Letter_11212017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120150008/120150008_Closure%20Letter_11212017_text.pdf

120150008_Final Order_11132015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120150008/120150008_Final%20Order_11132015.pdf

120150008_Final Order_11132015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120150008/120150008_Final%20Order_11132015_text.pdf

120150008_NOPV PCO_03172015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120150008/120150008_NOPV%20PCO_03172015.pdf

120150008_NOPV PCO_03172015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120150008/120150008_NOPV%20PCO_03172015_text.pdf

120150008_Operator_Response_to_Notice_and_Request_for_Time_05152015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120150008/120150008_Operator_Response_to_Notice_and_Request_for_Time_05152015.pdf

120150008_Final Order_11132015_text.pdf

November 13, 2015
Mr. Robert Steidel
Director
City of Richmond Department of Public Utilities
730 East Broad Street
Richmond, VA 23219
Re: CPF No. 1-2015-0008
Dear Mr. Steidel:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken by the City of Richmond to comply with the
pipeline safety regulations. When the terms of the compliance order have been completed, as
determined by the Director, Eastern Region, Office of Pipeline Safety, this enforcement action
will be closed. Service of the Final Order by certified mail is deemed effective upon the date of
mailing, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Byron Coy, PE, Director, Eastern Region, OPS
Mr. Alfred Scott, Deputy Director, City of Richmond
Mr. Sang J. Yi, Engineer III, City of Richmond
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
City of Richmond, ) CPF No. 1-2015-0008
)
Respondent. )
____________________________________)
FINAL ORDER
From June 3 through 6, 2013, pursuant to 49 U.S.C. § 60117, an inspector of the Virginia State
Corporation Commission (VA-SCC), acting as an agent for the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), conducted an on-
site pipeline safety inspection of the facilities and records of the City of Richmond, Department
of Public Utilities (City of Richmond or Respondent) in Richmond, Virginia. The City of
Richmond is a municipally owned gas system that operates 1,865 miles of main pipelines and
91,487 miles of service pipelines in the Richmond, Virginia metropolitan region.1
As a result of the inspection, the Director, Eastern Region, OPS (Director), issued to Respondent,
by letter dated March 17, 2015, a Notice of Probable Violation and Proposed Compliance Order
(Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that the City of
Richmond had violated 49 C.F.R. § 192.465 and proposed ordering Respondent to take certain
measures to correct this violation.
The City of Richmond responded to the Notice by letter dated April 8, 2015 (Response).
Respondent did not contest the alleged violation but requested an extension to prepare an
appropriate response to the Notice. On April 27, 2015, PHMSA Eastern Region granted the
extension, allowing the City of Richmond to respond by May 18, 2015.
On May 15, 2015, Respondent again responded to the Notice (Second Response). In its Second
Response, the City of Richmond did not contest the allegation of violation as stated in the
Notice, but requested additional time to complete the tasks in the proposed compliance order.
Respondent did not request a hearing and therefore has waived its right to one.
1 Pipeline Safety Violation Report (Violation Report), (March 17, 2015) (on file with PHMSA), at 1.



CPF No. 1-2015-0008
Page 2
FINDING OF VIOLATION
In its Response the City of Richmond did not contest the allegation that it violated 49 C.F.R. Part
192.465, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.465(a), which states:
§ 192.465 External corrosion control: Monitoring.
(a) Each pipeline that is under cathodic protection must be tested at
least once each calendar year, but with intervals not exceeding 15 months,
to determine whether the cathodic protection meets the requirements of §
192.463. However, if tests at those intervals are impractical for separately
protected short sections of mains or transmission lines, not in excess of
100 feet (30 meters), or separately protected service lines, these pipelines
may be surveyed on a sampling basis. At least 10 percent of these
protected structures, distributed over the entire system must be surveyed
each calendar year, with a different 10 percent checked each subsequent
year, so that the entire system is tested in each 10-year period.
The Notice alleged that Respondent violated 49 C.F.R. § 192.465(a) by not testing two pipelines
under cathodic protection once each calendar year, but with intervals not exceeding 15 months.
Specifically, the City of Richmond’s corrosion control monitoring procedures call for sampling
separately protected short sections of pipe at a 10% sampling basis.
2 From June 3 through 6
2013, when inspecting Respondent’s list of short sections of pipe to be inspected at a 10%
sampling basis, the VA-SCC inspector identified two isolated short sections of pipe that were not
on the list – Bethlehem Road and 2217 Nortonia Road, and had subsequently never been
monitored for cathodic protection. This finding was documented in a July 2, 2013 VA-SCC
Notice of Inspection. Further, the City of Richmond acknowledged the 2217 Nortonia Road
section was not on the list, and could not supply records showing the Bethlehem Road section
had ever been monitored on a 10% sampling basis.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 192.465(a) by not testing the
Bethlehem Road and 2217 Nortonia Road short sections at least once each calendar year, but
with intervals not exceeding 15 months.
This violation is a repeat violation of CPF 1-2013-0003 Item 1, and CPF 1-2011-0001 Item 3.
The Notice proposed a compliance order with respect to Item 1 in the Notice for violating 49
C.F.R. § 192.465(a). In its Second Response, the City of Richmond stated it was developing and
COMPLIANCE ORDER
2 See Notice at 2 (The City of Richmond’s “procedure titled ‘Corrosion Control Monitoring’ revised 10/15/2012
paragraph IV.C.1 requires corrosion monitoring of separately protected short sections of pipe, and isolated services
using a 10% sampling basis.”).



CPF No. 1-2015-0008
Page 3
implementing a plan to update its list of short sections of pipe to be inspected at a 10% sampling
basis, so as to account for all isolated short sections of pipe – including the sections at Bethlehem
Road and 2217 Nortonia Road. Further, Respondent requested additional time to complete the
items specified in the proposed compliance order for Item 1. Upon review of the City of
Richmond’s request, I have modified the compliance order so that Respondent will have
additional time to complete the items delineated therein.
Pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is
therefore ordered to take the following actions to ensure compliance with the pipeline safety
regulations applicable to its operations:
With respect to the violation of § 192.465(a) (Item 1), Respondent must –
1) Plan and conduct a field survey to assure all isolated segments are accounted for in
Respondent’s cathodic protection program. After accounting for all isolated segments,
the City must also then complete any identified cathodic protection remediation;
2) Assure all isolated segments are accounted for in Respondent’s cathodic protection
program within 330 days after receipt of the Final Order;
3) Complete any needed cathodic protection remediation work within one and a half (1.5)
years after receipt of the Final Order;
4) It is requested (not mandated) that the City of Richmond maintain documentation of the
safety improvement costs associated with fulfilling this Compliance Order and submit the
total to Byron Coy, PE, Director, Eastern Region, Pipeline and Hazardous Materials
Safety Administration. It is requested that these costs be reported in two categories: 1)
total cost associated with preparation/revision of plans, procedures, studies and analyses,
and 2) total cost associated with replacements, additions, and other changes to pipeline
infrastructure.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
Failure to comply with this Order may result in administrative assessment of civil penalties not
to exceed $200,000 for each violation for each day the violation continues or in referral to the
Attorney General for appropriate relief in a district court of the United States.
Under 49 C.F.R. § 190.243, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of this Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.243. Unless the Associate Administrator, upon request, grants a



CPF No. 1-2015-0008
Page 4
stay, the terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

120150008_Closure Letter_11212017_text.pdf

OVERNIGHT EXPRESS DELIVERY
November 21, 2017
Mr. Robert Steidel
Director, City of Richmond
Department of Public Utilities
730 East Broad Street
Richmond, VA 23219
CPF 1-2015-0008
Dear Mr. Steidel:
On November 13, 2015, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to the City of Richmond a Final Order in the above-referenced case. This Order included a
Compliance Order requirement to take corrective actions on your pipeline. Based on our review
of the documentation you provided, it has been determined that you have complied with the terms
of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Acting Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration