{"operation":"document","citation":"CPF 120155003M","title":"COLONIAL PIPELINE CO — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-02-25","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120155003m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120155003m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120155003m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120155003M","body":"Notice of Amendment involving COLONIAL PIPELINE CO. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2015-02-25 and is reported as closed as of 2015-04-21. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120155003M_Closure Letter_04212015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155003M/120155003M_Closure%20Letter_04212015.pdf\n\n120155003M_Closure Letter_04212015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155003M/120155003M_Closure%20Letter_04212015_text.pdf\n\n120155003M_NOA_02252015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155003M/120155003M_NOA_02252015.pdf\n\n120155003M_NOA_02252015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155003M/120155003M_NOA_02252015_text.pdf\n\n120155003M_Closure Letter_04212015_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nOVERNIGHT EXPRESS DELIVERY\nApril 21, 2015\nMr. Tim Felt\nPresident and Chief Executive Officer\nColonial Pipeline Company\n1185 Sanctuary Parkway, Suite 100\nAlpharetta, GA 30009\nCPF 1-2015-5003M\nDear Mr. Felt:\nFrom October 27 through 31, 2014, a representative from the Pipeline and Hazardous Materials\nSafety Administration, Office of Pipeline Safety, pursuant to Chapter 601 of 49 United States\nCode conducted an on-site pipeline safety inspection of Colonial Pipeline Company’s (CPC)\nprocedures in Linden, New Jersey. As a result of the inspection, CPC was issued a Notice of\nAmendment on February 25, 2015, which proposed amendment of its procedures.\nCPC submitted its amended procedures on March 26, 2015. My staff reviewed the amended\nprocedures, and it appears that the inadequacies outlined in this Notice of Amendment have been\ncorrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2133}