{"operation":"document","citation":"CPF 120155006M","title":"BP USFO/LOGISTICS — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-05-01","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120155006m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120155006m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120155006m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120155006M","body":"Notice of Amendment involving BP USFO/LOGISTICS. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2015-05-01 and is reported as closed as of 2015-06-11. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120155006M_Closure Letter_06112015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_Closure%20Letter_06112015.pdf\n\n120155006M_Closure Letter_06112015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_Closure%20Letter_06112015_text.pdf\n\n120155006M_NOA_05012015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_NOA_05012015.pdf\n\n120155006M_NOA_05012015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_NOA_05012015_text.pdf\n\n120155006M_Operator Response to Notice_06032015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_Operator%20Response%20to%20Notice_06032015.pdf\n\n120155006M_Closure Letter_06112015_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nEXPRESS OVERNIGHT DELIVERY\nJune 11, 2015\nSteve Pankhurst\nBusiness Unit Leader\nBP USFO/Logistics\n150 W. Warrenville Rd\nNaperville, IL 60563\nCPF 1-2015-5006M\nDear Mr. Pankhurst:\nDuring the week of October 27, 2014, a representative from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of BP USFO/Logistics’ (BP) procedures in\nCarteret, NJ. As a result of the inspection, BP was issued a Notice of Amendment on May 1,\n2015, which proposed amendment of your procedures.\nBP submitted its amended procedures on June 3, 2015. My staff reviewed the amended\nprocedures, and it appears that the inadequacies outlined in this Notice of Amendment have been\ncorrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2234}