# BP USFO/LOGISTICS — Notice of Amendment

- **operation:** document
- **citation:** CPF 120155006M
- **title:** BP USFO/LOGISTICS — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-05-01
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120155006m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120155006m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120155006m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120155006M
**body:**

Notice of Amendment involving BP USFO/LOGISTICS. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2015-05-01 and is reported as closed as of 2015-06-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120155006M_Closure Letter_06112015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_Closure%20Letter_06112015.pdf

120155006M_Closure Letter_06112015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_Closure%20Letter_06112015_text.pdf

120155006M_NOA_05012015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_NOA_05012015.pdf

120155006M_NOA_05012015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_NOA_05012015_text.pdf

120155006M_Operator Response to Notice_06032015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155006M/120155006M_Operator%20Response%20to%20Notice_06032015.pdf

120155006M_Closure Letter_06112015_text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
EXPRESS OVERNIGHT DELIVERY
June 11, 2015
Steve Pankhurst
Business Unit Leader
BP USFO/Logistics
150 W. Warrenville Rd
Naperville, IL 60563
CPF 1-2015-5006M
Dear Mr. Pankhurst:
During the week of October 27, 2014, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of BP USFO/Logistics’ (BP) procedures in
Carteret, NJ. As a result of the inspection, BP was issued a Notice of Amendment on May 1,
2015, which proposed amendment of your procedures.
BP submitted its amended procedures on June 3, 2015. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false