# NUSTAR TERMINALS OPERATIONS PARTNERSHIP L. P. — Warning Letter

- **operation:** document
- **citation:** CPF 120155012W
- **title:** NUSTAR TERMINALS OPERATIONS PARTNERSHIP L. P. — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-07-24
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.402(a), 195.420(b), 195.589(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120155012w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120155012w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120155012w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120155012W
**body:**

Warning Letter involving NUSTAR TERMINALS OPERATIONS PARTNERSHIP L. P.. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.420(b),  195.589(c). The case was opened on 2015-07-24 and is reported as closed as of 2015-07-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120155012W_Warning Letter_07242015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155012W/120155012W_Warning%20Letter_07242015.pdf

120155012W_Warning Letter_07242015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120155012W/120155012W_Warning%20Letter_07242015_text.pdf

120155012W_Warning Letter_07242015_text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
July 24, 2015
Mr. John Roller
VP, Terminal Operations
NuStar Terminals Operations Partnership L.P.
19003 IH-10 West
San Antonio, TX 78257
CPF 1-2015-5012W
Dear Mr. Roller:
On November 18-20, 2014 a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected NuStar
Terminals Operations Partnership L.P. pipeline facility at Andrews Air Force Base in Clinton,
Maryland.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violation(s) are:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual of
written procedures for conducting normal operations and maintenance activities and
handling abnormal operations and emergencies. This manual shall be reviewed at
intervals not exceeding 15 months, but at least once each calendar year, and appropriate
changes made as necessary to insure that the manual is effective. This manual shall be
prepared before initial operations of a pipeline system commence, and appropriate parts
shall be kept at locations where operations and maintenance activities are conducted.
Nustar failed to conduct a review of its manual of written procedures for conducting normal
operations and maintenance activities and handling abnormal operations and emergencies at
intervals not exceeding 15 months, but at least once each calendar year.



1-2015-5012W
During the inspection, the PHMSA inspector reviewed NuStar’s Operations and Maintenance
Manual, Section 701 Reviews, effective 5/1/08. Paragraph 3.1, Annual Procedural Manual
Review for Operations, Maintenance and Emergencies, requires that the annual manual review
be documented on Form 6301, Record for Manual Review. NuStar completed Form 6301 in
2013 and 2014, however, the interval between the reviews exceeded 15 months.
The records show that NuStar conducted a review for its Operations and Maintenance Manual on
3/8/2013 and 8/6/2014. The number of days between the reviews was 516, which exceeds the
required interval of 15 months by approximately 65 days.
2. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual of
written procedures for conducting normal operations and maintenance activities and
handling abnormal operations and emergencies. This manual shall be reviewed at
intervals not exceeding 15 months, but at least once each calendar year, and appropriate
changes made as necessary to insure that the manual is effective. This manual shall be
prepared before initial operations of a pipeline system commence, and appropriate parts
shall be kept at locations where operations and maintenance activities are conducted.
NuStar did not follow its written procedure for conducting normal operations and maintenance
activities and handling abnormal operations. During the inspection, the PHMSA inspector
reviewed NuStar’s Operation and Maintenance Manual, 315 Valve Maintenance, Section 3.3
Mainline Valve Inspection, dated 3/22/09. The document states in part that “Field personnel will
prepare Form 6101, Valve Inspection Report.”
During the inspection, the PHMSA inspector reviewed valve inspection report records, Form
6101, from January, 2011 through July, 2013. The records show 16 instances where a remedial
work order was required, but no work order was created, and 4 instances where the “Yes” / “No”
boxes on the form for the remedial work order were left blank. As stated by NuStar during the
inspection on 11/20/2014 and via email on 01/30/2015, NuStar terminal personnel inadvertently
checked the “remedial work order” boxes on the main line valve inspection forms. Therefore,
NuStar did not maintain accurate mainline valve records as required by its procedure.
3. § 195.420 Valve maintenance.
(b) Each operator shall, at intervals not exceeding 7 1/2 months, but at least twice each
calendar year, inspect each mainline valve to determine that it is functioning properly.
NuStar failed to inspect its mainline valves at the Andrews Air Force Base Terminal location, at
intervals not exceeding 7 ½ months, but at least twice each calendar year to determine that they
were functioning properly.
120155012W_Warning Letter_07242015 Page 2 of 4



1-2015-5012W
During the inspection, the PHMSA inspector reviewed valve inspection report records from
January, 2011 through July, 2013. The records show that NuStar inspected each mainline valve
on the following dates:
a. 1/3/2011
b. 7/14/2011
c. 12/15/2011
d. 7/13/2012
e. 2/1/2013
f. 7/30/2013
NuStar failed to inspect its mainline valves twice in 2012. During the inspection on 11/20/2014,
NuStar stated that it did not conduct inspections at the appropriate intervals due to scheduling
issues.
4. § 195.589 What corrosion control information do I have to maintain?
(c) You must maintain a record of each analysis, check, demonstration, examination,
inspection, investigation, review, survey, and test required by this subpart in sufficient
detail to demonstrate the adequacy of corrosion control measures or that corrosion
requiring control measures does not exist. You must retain these records for at least 5
years, except that records related to Secs. 195.569, 195.573(a) and (b), and 195.579(b)(3)
and (c) must be retained for as long as the pipeline remains in service.
Nustar failed to maintain records of an annual cathodic protection survey to demonstrate the
adequacy of corrosion control measures or that corrosion requiring control measures does not
exist.
During the inspection, the PHMSA inspector reviewed Corrosion Field Survey Data and Tables
records from 2012 through 2014. The records for 2012 and 2013 at the Andrews Air Force Base
test station #22 – Suitland Parkway at Washington Gas location show “on” and “off” potential
measurements were taken on the casing, however, there is no record of potential measurements
taken on the line pipe.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $200,000
per violation per day the violation persists up to a maximum of $2,000,000 for a related series of
violations. For violations occurring prior to January 4, 2012, the maximum penalty may not
exceed $100,000 per violation per day, with a maximum penalty not to exceed $1,000,000 for a
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the item(s) identified in this letter.
Failure to do so will result in NuStar Terminal Operations Partnership L.P. being subject to
additional enforcement action.
120155012W_Warning Letter_07242015 Page 3 of 4



1-2015-5012W
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 1-2015-5012W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Byron Coy, P.E.
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
120155012W_Warning Letter_07242015 Page 4 of 4
- **truncated:** false
- **body characters:** 8719