# PORTLAND PIPE LINE CORPORATION — Notice of Amendment

- **operation:** document
- **citation:** CPF 120165005M
- **title:** PORTLAND PIPE LINE CORPORATION — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2016-07-11
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120165005m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120165005m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120165005m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120165005M
**body:**

Notice of Amendment involving PORTLAND PIPE LINE CORPORATION. PHMSA's enforcement data identifies the cited regulation as 195.402(c)(3). The case was opened on 2016-07-11 and is reported as closed as of 2016-08-25. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120165005M_Closure Letter_08252016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120165005M/120165005M_Closure%20Letter_08252016.pdf

120165005M_Closure Letter_08252016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120165005M/120165005M_Closure%20Letter_08252016_text.pdf

120165005M_Notice of Amendment_07112016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120165005M/120165005M_Notice%20of%20Amendment_07112016.pdf

120165005M_Notice of Amendment_07112016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120165005M/120165005M_Notice%20of%20Amendment_07112016_text.pdf

120165005M_Operator Response to Notice and Request for Hearing_08112016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120165005M/120165005M_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing_08112016.pdf

120165005M_Notice of Amendment_07112016_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
July 11, 2016
Thomas Hardison, Vice President
Portland Pipe Line Corporation
30 Hill Street
South Portland, ME 04106
CPF 1-2016-5005M
Dear Mr. Hardison:
From July 14 through July 16, 2015, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected
Portland Pipe Line Corporation’s (Portland) pipeline facility in South Portland, Maine.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Portland’s plans or procedures, as described below:
1. § 195.402(c)(3)
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
Portland’s procedures for operating, maintaining and repairing the pipeline system in accordance
with each of the requirements of this subpart and subpart H of this part are inadequate for
overpressure safety devices. Specifically, the procedures fail to provide sufficient guidance on
how to conduct and document relief valve inspections as per §195.428(a).
During the inspection, the PHMSA inspector reviewed pressure control inspection and testing
procedures – Portland O&M Section 6 - Maintenance; revised 06/15, and the pressure control
inspection and testing records for 2014.
Portland’s procedure, Section 6 - Maintenance, did not provide sufficient guidance on conducting
and documenting a relief valve inspection.



1-2016-5005M
In order to ensure that a relief valve will relieve at the specified set pressure when needed, data is
needed on the condition of the valve prior to the inspection (“as found”), as well as on the condition
of the valve after the inspection is completed (“as left”). Information typically documented
includes:
1. The relief pressure of the valve in the “as found” condition
2. The relief pressure of the valve in the “as left” condition
3. The “set point”
Portland’s procedure did not include any requirements for capturing either the “as found” or “as
left” pressure of a relief device. In addition, the procedure lacked details such as:
1. The criteria for determining acceptable “as-found” / “as left” relief pressures
2. The actions that must be taken if the relief valve “as-found” pressure does not meet the
criteria
3. 4. The definition of the term “set point”
The documentation required and where it must be recorded, for example:
a. The information that must be captured in the Protective Device Testing record
b. Where the “as-found” and “as-left” pressures are recorded
5. How to ensure that the MOP will not be exceeded during testing of the relief device
2. § 195.402(c)(3)
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
Portland’s procedures for operating, maintaining and repairing the pipeline system in accordance
with each of the requirements of this subpart and subpart H of this part are inadequate for
determining MOP. Specifically, Portland’s procedure lacks details on how the maximum
operating pressure (MOP) is determined in accordance with §195.406(a).
During the inspection, the PHMSA inspector reviewed Portland Pipeline’s O&M, Section 4.2.7.1
“Maximum Pipe Joint MAOP” dated 2-2015. The procedure lacks details such as:
1. The criteria used to establish the MOP
2. 3. 4. How the internal design pressure of the pipe is determined, in accordance with §195.106
How the surge pressure requirements are met, per §195.406
The documentation and retention requirements for MOP records
Portland Pipe Line was unable to provide any relevant procedures in their O&M which
demonstrated how the Operator established its MOP.
120165005M_NOA_07112016 Page 2 of 4



1-2016-5005M
3. § 195.402(c)(3)
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
Portland’s procedures for operating, maintaining, and repairing the pipeline system in accordance
with each of the requirements of this subpart and subpart H of this part are inadequate in that they
do not properly address the maintenance of mainline valves as per §195.420. Specifically,
Portland’s procedures do not contain a process for ensuring deficiencies found during mainline
valve inspections are remediated.
During the inspection, the PHMSA inspector reviewed Portland O&M Section 6 – Maintenance,
6.7.3 “Block Valves.” The procedure lacked adequate guidance such as:
1. The process for ensuring that results of the inspection are documented, e.g. who is
responsible for documentation entry / approval
2. The process for ensuring that deficiencies found during inspections are remediated, for
example:
a. 3. What is the criteria for determining the timeframe for remediation
b. Who is responsible for approving the proposed remediation work and the
timeframe
How the work is documented, e.g. forms / work orders
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b). If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this
Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49
C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your amended
procedures to my office within 60 days of receipt of this Notice. This period may be extended by
written request for good cause. Once the inadequacies identified herein have been addressed in
your amended procedures, this enforcement action will be closed.
120165005M_NOA_07112016 Page 3 of 4



1-2016-5005M
It is requested (not mandated) that Portland maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Byron Coy, PE, Director, PHMSA Eastern Region, 820 Bear
Tavern Road, Suite 103, W. Trenton, NJ 08628, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 1-2016-5005M
and, for each document you submit, please provide a (signed) copy in electronic format whenever
possible. Smaller files may be emailed to Byron.Coy@dot.gov. Larger files should be sent on a
CD accompanied by the original (signed) paper copy to the Eastern Region Office.
Sincerely,
Byron Coy, P.E.
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
120165005M_NOA_07112016 Page 4 of 4

120165005M_Closure Letter_08252016_text.pdf

OVERNIGHT EXPRESS DELIVERY
August 25, 2016
Thomas Hardison, Vice President
Portland Pipe Line Corporation
30 Hill Street
South Portland, ME 04106
CPF 1-2016-5005M
Dear Mr. Hardison:
From July 14 through July 16, 2015, a representative from the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted
an on-site pipeline safety inspection of Portland Pipe Line Corporation’s (Portland) pipeline
facility in South Portland, Maine. As a result of the inspection, Portland was issued a Notice of
Amendment on July 11, 2016, which proposed amendment of its procedures.
Portland submitted its amended procedures on August 11, 2016. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary, and this case is now closed. Thank
you for your cooperation.
Sincerely,
Byron Coy, P.E.
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 10595