# TEXAS EASTERN TRANSMISSION, LP (SPECTRA ENERGY PARTNERS, LP) — Warning Letter

- **operation:** document
- **citation:** CPF 120171004W
- **title:** TEXAS EASTERN TRANSMISSION, LP (SPECTRA ENERGY PARTNERS, LP) — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-02-06
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.303.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120171004w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120171004w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120171004w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120171004W
**body:**

Warning Letter involving TEXAS EASTERN TRANSMISSION, LP (SPECTRA ENERGY PARTNERS, LP). PHMSA's enforcement data identifies the cited regulation as 192.303. The case was opened on 2017-02-06 and is reported as closed as of 2017-02-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120171004W_Operator Response to Notice_03032017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171004W/120171004W_Operator%20Response%20to%20Notice_03032017.pdf

120171004W_Warning Letter_02062017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171004W/120171004W_Warning%20Letter_02062017.pdf

120171004W_Warning Letter_02062017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171004W/120171004W_Warning%20Letter_02062017_text.pdf

120171004W_Warning Letter_02062017_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
February 6, 2017
J. Andrew Drake
Vice President, Operations & EHS
Texas Eastern Transmission, LP (Spectra Energy Partners, LP)
5400 Westheimer Court
Houston, TX 77056
CPF 1-2017-1004W
Dear Mr. Drake:
On August 16, 2015, a representative of the Pipeline and Hazardous Materials Safety Administration
(PHMSA) pursuant to Chapter 601 of 49 United States Code, inspected your Bailey East Mine Panel 1L
Project in Greene County, Pennsylvania.
As a result of the inspection, it is alleged that you have committed a probable violation of the Pipeline
Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the probable violation
is:
1. §192.303 Compliance with specifications or standards.
Each transmission line or main must be constructed in accordance with comprehensive written
specifications or standards that are consistent with this part.
Texas Eastern Transmission LP (Spectra Energy Partners, LP) failed to construct transmission pipelines on
the Holbrook Discharge Bailey East Mine Panel L1 Project in Greene County, Pennsylvania in accordance
with §192.303. Specifically, Texas Eastern failed to follow its construction specification number CS-PL
1.7, Section I of II revised 12/12/2012, paragraph 13E5.4. The procedure states in part: “When using the
high voltage type holiday detectors (13C12.1), holiday inspection along the ROW shall be 3000V for single
layer FBE…”
During the inspection, a PHMSA inspector observed holiday detection (jeeping) on the L30 segment of the
Holbrook Discharge Bailey East Mine Panel L1 Project. Jeeping was being conducted along the ROW on
single layer FBE. Construction personnel confirmed the voltage setting on the Spy model 780 high voltage
holiday detector that was being utilized. The voltage setting displayed was 2350V.
Thus, Texas Eastern failed to follow its written specification by using 2350V for jeeping single layer FBE
on the ROW instead of the required 3000V.



1-2017-1004W
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $205,638 per
violation per day the violation persists up to a maximum of $2,056,380 for a related series of violations.
For violation occurring between January 4, 2012 to August 1, 2016, the maximum penalty may not exceed
$200,000 per violation per day, with a maximum penalty not to exceed $2,000,000 for a related series of
violations. For violations occurring prior to January 4, 2012, the maximum penalty may not exceed
$100,000 per violation per day, with a maximum penalty not to exceed $1,000,000 for a related series of
violations. We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this time. We
advise you to correct the item identified in this letter. Failure to do so will result in Texas Eastern
Transmission LP (Spectra Energy Corporation) being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to CPF 1-
2017-1004W. Be advised that all material you submit in response to this enforcement action is subject to
being made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide
a second copy of the document with the portions you believe qualify for confidential treatment redacted
and an explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. 552(b).
Sincerely,
Robert Burrough
Acting Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
120171004W_Warning Letter_02062017_text Page 2 of 2
- **truncated:** false
- **body characters:** 4697