# BUCKEYE DEVELOPMENT & LOGISTICS, LLC — Warning Letter

- **operation:** document
- **citation:** CPF 120175014W
- **title:** BUCKEYE DEVELOPMENT & LOGISTICS, LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-04-13
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.452(b)(5).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120175014w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120175014w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120175014w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120175014W
**body:**

Warning Letter involving BUCKEYE DEVELOPMENT & LOGISTICS, LLC. PHMSA's enforcement data identifies the cited regulation as 195.452(b)(5). The case was opened on 2017-04-13 and is reported as closed as of 2017-04-13. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120175014W_Warning Letter_04132017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120175014W/120175014W_Warning%20Letter_04132017.pdf

120175014W_Warning Letter_04132017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120175014W/120175014W_Warning%20Letter_04132017_text.pdf

120175014W_Warning Letter_04132017_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
April 13, 2017
T. Scott Collier, Vice President
Performance Assurance and Asset Integrity
Buckeye Partners, L.P.
Five TEK Park
9999 Hamilton Boulevard
Breinigsville, PA 18031
CPF 1-2017-5014W
Dear Mr. Collier:
On August 18, 2016, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code met with Buckeye
Development & Logistics, LLC (Buckeye) personnel to discuss its integrity management (IM)
notification submission dated March 18, 2016 regarding its interstate liquid 10-inch pipeline from
El Paso, Texas to Juarez, Mexico, known as PMI-10, (IM notification #565) in Breinigsville,
Pennsylvania.
As a result of the meeting, it is alleged that Buckeye has committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The item inspected and the
probable violation is:
1. §195.452 Pipeline integrity management in high consequence areas.
(a) …
(b) What program and practices must operators use to manage pipeline integrity?
Each operator of a pipeline covered by this section must: …
(5) Implement and follow the program.
Buckeye failed to follow its Integrity Management Manual, Section 10 – Continual Evaluation,
Updated: 4/2013 and 8/11/2016 (Procedure) (Section 10) in accordance with §195.452(b)(5).
Specifically, Buckeye did not reassess its pipeline PMI-10 (pipeline)within the established five-
year interval not to exceed 68 months as described in Section 10 as required in §195.452(f)(5).



CPF 1-2017-5014W
According to Buckeye’s IM notification #565, Buckeye assessed pipeline PMI-10 on
July 20, 2010, and the continual reassessment was planned on a five-year interval to be completed
before July 20, 2015. The IM notification #565 also stated:
Deformation in-line inspection (ILI) tool were successfully run on
July 16, 2015 and on January 21, 2016. The deformation ILI tools identified
bore restrictions that a metal loss tool would not be to pass. These
restrictions have prevented a metal loss ILI tool being run to complete the
assessment, and the reassessment interval will exceed 68 months on
March 20, 2016 (emphasis added) … The dent feature is in the process of
being excavated and evaluated for repair or removal and is expected to be
complete by March 31, 2016 (emphasis added).
On April 20, 2016, Buckeye sent an e-mail to the PHMSA Information Resources Manager
providing the following statement: “The 4/8/2016 ILI completes the integrity assessment of the
pipeline.”
On August 18, 2016, a PHMSA representative met with Buckeye personnel. At the meeting
Buckeye provided the following timeline of events that occurred prior to August 18, 2016:
1. Buckeye had identified the following threats to the integrity of pipeline:
a. Corrosion (external-internal)
b. Third party damage
c. Manufacturing
2. On July 16, 2015, Buckeye reassessed the pipeline by using a geometry pig and
Magnetic Flux Leakage (MFL) tool. Buckeye explained that this pig run identified a
restriction. Buckeye assumed that magnets broke off from the ILI tool from the
previous assessment in 2010 and were stuck in the pipeline.
3. On January 21, 2016:
a. Buckeye ran a magnet extractor tool to remove the magnets from the pipeline.
b. Buckeye ran a geometry pig in the pipeline and found an immediate feature
classified as a top dent more than 6% which was located in a high consequence
area.1
On January 22, 2016, Buckeye reduced the pressure in the pipeline and filed a safety-
related condition report (SRCR) since they reduced the pressure.
2
4. 1 High consequence area means (1) A commercially navigable waterway, which means a waterway where a substantial likelihood
of commercial navigation exists; (2) A high population area, which means an urbanized area, as defined and delineated by the
Census Bureau, that contains 50,000 or more people and has a population density of at least 1,000 people per square mile; (3) An
other populated area, which means a place, as defined and delineated by the Census Bureau, that contains a concentrated population,
such as an incorporated or unincorporated city, town, village, or other designated residential or commercial area; (4) An unusually
sensitive area, as defined in §195.6. See 49 C.F.R. §195.450.
2 Buckeye filed a SRCR pursuant to 49 C.F.R. 195.56 regarding a condition which caused a pressure reduction (SRCR 20160012)
(available at
https://www.phmsa.dot.gov/portal/site/PHMSA/menuitem.6f23687cf7b00b0f22e4c6962d9c8789/?vgnextoid=4bde326d1104b21
0VgnVCM1000001ecb7898RCRD&vgnextchannel=3430fb649a2dc110VgnVCM1000009ed07898RCRD).
120175014W_Warning Letter_04132017_text Page 2 of 4



CPF 1-2017-5014W
5. On March 31, 2016, Buckeye cutout the section of pipeline and found a magnet
attached to the internal surface of the pipeline. Buckeye installed a replacement pipe
and completed the repair.
6. 7. On April 6, 2016, Buckeye ran a Geometry Pig.
On April 8, 2016, Buckeye ran the GEO+MFL tool. Buckeye received a final report
for the April 7-8, 2016 reassessment of the pipeline.
On August 25, 2016, the PHMSA representative sent an e-mail to Buckeye requesting records and
procedures from its integrity management program (IMP).
On October 05, 2016, Buckeye provided a timeline showing the events leading up to completing
the pipeline reassessment. Also, Buckeye provided Subsection 10.2.1 Periodic Continual
Evaluations which states, “[t]his evaluation is used to determine if an integrity assessment is
required prior to the end of the five-year maximum reassessment interval and if the assessment
method remains appropriate to detect threats to the integrity of the segment.” Subsection 10.2.1
Periodic Continual Evaluations also states that “an evaluation using the form in Appendix I-2 shall
be completed within 18 months after completing an integrity assessment.” Buckeye provided a
completed Appendix I-2 for its 2013 continual evaluation in which it established a five calendar
year maximum reassessment for the pipeline from El Paso, Texas to Juarez, Mexico. In addition,
Buckeye provided its baseline and continual assessment plan showing a five-year interval
reassessment starting from July 2010 and Subsection 10.10.1 Assessment Intervals which allows
extending the five-year interval by 8 months if unforeseen events occur.
Buckeye did not complete the reassessment of the pipeline in accordance with their Procedure.
1. Per their Procedure, Buckeye applied the 8-month allowance which extended the due date
for the reassessment to March 19, 2016.
2. 3. Buckeye completed the reassessment on April 8, 2016.
This exceeded due date by 21 days.
Therefore, Buckeye failed to follow its Procedure.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $205,638
per violation per day the violation persists up to a maximum of $2,056,380 for a related series of
violations. For violation occurring between January 4, 2012 to August 1, 2016, the maximum
penalty may not exceed $200,000 per violation per day, with a maximum penalty not to exceed
$2,000,000 for a related series of violations. For violations occurring prior to January 4, 2012, the
maximum penalty may not exceed $100,000 per violation per day, with a maximum penalty not to
exceed $1,000,000 for a related series of violations. We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct the
item identified in this letter. Failure to do so will result in Buckeye being subject to additional
enforcement action.
No reply to this letter is required. If you choose to reply, please address your correspondence on
this matter to: Robert Burrough, Acting Director, PHMSA Eastern Region, 820 Bear Tavern Road,
Suite 103, West Trenton, NJ 08628. Please refer to CPF 1-2017-5014W in your correspondence.
120175014W_Warning Letter_04132017_text Page 3 of 4



CPF 1-2017-5014W
Be advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must
provide a second copy of the document with the portions you believe qualify for confidential
treatment redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Robert Burrough
Acting Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
120175014W_Warning Letter_04132017_text Page 4 of 4
- **truncated:** false
- **body characters:** 9419