# SUNOCO PIPELINE L.P. — Notice of Amendment

- **operation:** document
- **citation:** CPF 120175024M
- **title:** SUNOCO PIPELINE L.P. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-09-01
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120175024m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120175024m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120175024m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120175024M
**body:**

Notice of Amendment involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulation as 195.402(c)(3). The case was opened on 2017-09-01 and is reported as closed as of 2017-11-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120175024M_Closure letter_11202017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120175024M/120175024M_Closure%20letter_11202017.pdf

120175024M_Closure letter_11202017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120175024M/120175024M_Closure%20letter_11202017_text.pdf

120175024M_Notice of Amendment_09012017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120175024M/120175024M_Notice%20of%20Amendment_09012017.pdf

120175024M_Notice of Amendment_09012017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120175024M/120175024M_Notice%20of%20Amendment_09012017_text.pdf

120175024M_Operator Response To Notice_10052017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120175024M/120175024M_Operator%20Response%20To%20Notice_10052017.pdf

120175024M_Closure letter_11202017_text.pdf

OVERNIGHT EXPRESS DELIVERY
November 20, 2017
Ryan Coffey
Executive Vice President of Operations
Sunoco Pipeline L. P.
800 East Sonterra Boulevard
San Antonio, TX 78258
CPF 1-2017-5024M
Dear Mr. Coffey:
Between April 11, 2016 and November 18, 2016, representatives from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Sunoco Pipeline’s procedures at Company
facilities in Delaware, Michigan, New Jersey, New York, Ohio, and Pennsylvania. As a result of
the inspection, Sunoco Pipeline, L. P. was issued a Notice of Amendment on September 1, 2017,
which proposed amendment of your procedures.
Sunoco Pipeline, L. P. submitted its amended procedures on October 5, 2017. My staff reviewed
the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Acting Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120175024M_Notice of Amendment_09012017_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
September 1, 2017
Ryan Coffey
Executive Vice President of Operations
Sunoco Pipeline
800 East Sonterra Boulevard
San Antonio, TX 78258
CPF 1-2017-5024M
Dear Mr. Coffey:
Between April 11, 2016 and November 18, 2016; representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected Sunoco Pipeline L.P.’s (Sunoco) procedures and records for operations, maintenance,
and integrity management as part of an integrated inspection of Sunoco assets in Delaware,
Michigan, New York, New Jersey, Ohio, and Pennsylvania.
Based on the inspection, PHMSA has identified the apparent inadequacies found within Sunoco’s
plans or procedures, as described below:
1. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
Sunoco’s procedures for operating, maintaining, and repairing the pipeline system in accordance
with each of the requirements of this subpart and subpart H of 49 C.F.R. Part 195 were inadequate.
Specifically, Sunoco’s procedure was inadequate for the inspection of main line valves as per
§ 195.420(b).



CPF 1-2017-5024M
During the inspection, the PHMSA representative reviewed Sunoco’s DOT 195 Maintenance
Manual, SECTION 195.420. Valve Maintenance (Procedure). The Procedure states in part in the
“Notes or Remarks” section:
2. Any Main Line Valve that could not be operated during the inspection and is marked as number
5, ‘Not Operated Due To Operations Scheduling’, under the operating condition shall be partially
operated as soon as operating conditions permit and the date of partial operation documented in
the remarks area of the Valve Inspection Report where the number 5 was reported.
This Procedure fails to provide details such as:
1. 2. A process for determination of when “operating conditions permit”
Roles and Responsibility for rescheduling the inspection “as soon as operating conditions
permit” in accordance with the requirements of § 195.420(b)
2. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
Sunoco’s procedures for operating, maintaining, and repairing the pipeline system in accordance
with each of the requirements of this subpart and subpart H of 49 C.F.R. Part 195 were
inadequate. Specifically, Sunoco’s procedure was inadequate for the inspection of in-service steel
aboveground breakout tanks pursuant to § 195.432(c).
Section 195.432(c) states:
Each operator must inspect the physical integrity of in-service steel aboveground breakout tanks
built to API Std 2510 (incorporated by reference, see §195.3) according to section 6 of API Std 510
(incorporated by reference, see § 195.3).
During the inspection, the PHMSA representative reviewed Sunoco’s procedure Section 195.432.
Inspection of In-Service Breakout Tanks, Last Revised 3-27-15. The procedure addresses the
inspection of aboveground steel low pressure or atmospheric pressure storage tanks pursuant to
API Standard 653, but does not provide guidance for the inspection of in-service steel aboveground
breakout tanks built to API Standard 2510. The PHMSA inspection included 1 breakout tank, Lima
Tank 7, that was built to ASME Section VIII standard for pressure vessels and thus the tank would
be subject to inspection in accordance with § 195.432(c).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
120175024M_Notice of Amendment_09012017_text Page 2 of 3



CPF 1-2017-5024M
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Sunoco Pipeline maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Acting Director, PHMSA Eastern
Region, 820 Bear Tavern Road, Suite 103, West Trenton, NJ 08628. Please reference
CPF 1- 2017-5024M on each document you submit, and whenever possible provide a signed PDF
copy in electronic format. Smaller files may be emailed to robert.burrough@dot.gov. Larger files
should be sent on a CD accompanied by the original paper copy to the Eastern Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Acting Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
120175024M_Notice of Amendment_09012017_text Page 3 of 3
- **truncated:** false
- **body characters:** 9290