# EASTERN SHORE NATURAL GAS CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 120181012M
- **title:** EASTERN SHORE NATURAL GAS CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-05-14
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.605(b)(1), 192.605(b)(6), 192.605(b)(7), 192.7(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120181012m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120181012m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120181012m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120181012M
**body:**

Notice of Amendment involving EASTERN SHORE NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulations as 192.605(b)(1),  192.605(b)(6),  192.605(b)(7),  192.7(a). The case was opened on 2018-05-14 and is reported as closed as of 2018-07-31. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120181012M_Closure Letter_07312018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120181012M/120181012M_Closure%20Letter_07312018.pdf

120181012M_Closure Letter_07312018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120181012M/120181012M_Closure%20Letter_07312018_text.pdf

120181012M_Notice of Amendment_05142018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120181012M/120181012M_Notice%20of%20Amendment_05142018.pdf

120181012M_Notice of Amendment_05142018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120181012M/120181012M_Notice%20of%20Amendment_05142018_text.pdf

120181012M_Operator Response to Notice_06122018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120181012M/120181012M_Operator%20Response%20to%20Notice_06122018.pdf

120181012M_Closure Letter_07312018_text.pdf

OVERNIGHT EXPRESS DELIVERY
July 31, 2018
Mr. Steven Thompson
Senior Vice President
Eastern Shore Natural Gas Company
500 Energy Lane, Suite 200
Dover, DE 19901
CPF 1-2018-1012M
Dear Mr. Thompson:
Between May 15, 2017 and June 22, 2017, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Eastern Shore Natural Gas Company’s
procedures for its pipeline facilities in Delaware, Maryland, and Pennsylvania. As a result of the
inspection, Eastern Shore Natural Gas Company was issued a Notice of Amendment (NOA) on
May 14, 2018, which proposed amendment of your procedures.
Eastern Shore Natural Gas Company submitted its amended procedures on June 12, 2018. My staff
reviewed the amended procedures, and it appears that the inadequacies outlined in this NOA have
been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120181012M_Notice of Amendment_05142018_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
May 14, 2018
Mr. Steven Thompson
Senior Vice President
Eastern Shore Natural Gas Company
1110 Forrest Avenue, Suite 201
Dover, DE 19904
CPF 1-2018-1012M
Dear Mr. Thompson:
From May 15, 2017 to June 22, 2017, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected
Eastern Shore Natural Gas Company’s (ESNG) procedures for its pipeline system in Delaware,
Maryland and Pennsylvania.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
ESNG’s plans or procedures, as described below:
1. § 192.605 Procedural manual for operations, maintenance, and emergencies.
…
(b) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following, if applicable, to provide safety
during maintenance and operations.
…
(7) Starting, operating and shutting down gas compressor units.
ESNG’s procedural manual for operations, maintenance and emergencies was inadequate.
Specifically, ESNG’s procedures for the inspection and testing of compressor station emergency
shutdown system (ESD) were inadequate.



CPF 1-2018-1012M
During the inspection, the PHMSA inspector reviewed records for annual performance testing at
Delaware City and Bridgeville stations. The records produced for examination did not show all of
the elements of a successful ESD system performance test. They demonstrated that ESNG
conducted individual device tests over multiple days with the control panel in test mode. The
records noted that the control loop for the panel key SESD (System Emergency Shut Down) was
activated. There was no indication in the records provided that any one trigger device was used to
conduct a full system ESD performance test, in which the fire gates were observed to be fully
closed and the station piping blown down. Subsequently, ESNG’s procedures for ESD testing were
requested.
The effective procedure provided for the time frame of records reviewed during the inspection was
ESNG’s O&M Manual, Compressor Station Operating and Maintenance Procedures, Sections
530-532. These procedures were inadequate in that they did not provide any detailed steps required
to perform a full system ESD performance test.
ESNG also provided a draft of a new procedure, Emergency Shut-Down (ESD) Test Procedure,
dated November 10, 2017, which addresses the stand-alone ESD system performance testing. The
draft incorporated the detailed elements of a test, but did not adopt the specific code language
regarding the frequency of the testing, that is, “…at intervals not exceeding 15 months, but at least
once each calendar year…”
2. § 192.605 Procedural manual for operations, maintenance, and emergencies.
…
(b) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following, if applicable, to provide safety
during maintenance and operations.
(1) Operating, maintaining, and repairing the pipeline in accordance with each of the
requirements of this subpart and subpart M of this part.
ESNG’s procedural manual for operations, maintenance and emergencies was inadequate.
Specifically, ESNG’s procedure for inspection and testing of relief devices failed to include
adequate guidance regarding test frequency and devices subject to testing in accordance with
§ 192.731.
Section 192.731 states:
“Compressor stations: Inspection and testing of relief devices.
(a) Except for rupture discs, each pressure relieving device in a compressor station must be
inspected and tested in accordance with §§192.739 and 192.743, and must be operated periodically
to determine that it opens at the correct set pressure.”
During the inspection, the PHMSA inspector requested ESNG’s procedure for the inspection and
testing of compressor station unit override switches. On July 18, 2017, ESNG provided
2 manufacturer’s calibration procedures for Rosemount and Bristol-Babcock pressure transducers.
120181012M_Notice of Amendment_05142018_text Page 2 of 5



CPF 1-2018-1012M
ESNG did not provide any Operations and Maintenance manual (O&M) procedures associated
with the inspection and testing at that time.
These manufacturer’s procedures for inspection and testing of the compressor station pressure
transducers for the unit override switches were inadequate, in that they did not specify the
frequency of the tests, or provide provisions for testing to verify the correct set pressure for the
unit override switches that are subject to the test.
In a response to a follow-up email from the PHMSA inspector, ESNG provided a draft of a new
procedure, Pressure Transmitter Performance Test Procedure, dated November 10, 2017, which
addressed the pressure transmitter performance testing. The draft incorporated some of the detailed
elements of a test, but did not present sufficient detailed steps to describe both calibration and
performance testing of the device. In addition, the new procedure specified a performance test
interval, “annually”, but did not adopt the specific code language regarding the frequency of the
testing, that is, “…at intervals not exceeding 15 months, but at least once each calendar year…”
ESNG also provided a draft of a new procedure, SCADA Override Test Procedure, dated
November 10, 2017, which addressed suction pressure settings and discharge pressure and
temperature settings. In regard to the interval for testing pressure relief devices, the revised
procedure specified an annual test interval, but did not adopt the specific code language regarding
the frequency of the testing, that is, “…at intervals not exceeding 15 months, but at least once each
calendar year…”
3. § 192.605 Procedural manual for operations, maintenance, and emergencies.
…
(b) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following, if applicable, to provide safety
during maintenance and operations.
(6) Maintaining compressor stations, including provisions for isolating units or
sections of pipe and for purging before returning to service.
ESNG’s procedures for maintaining compressor stations were inadequate. Specifically, ESNG’s
procedures for performance testing of the gas detection and alarm systems failed to verify that the
system functions to register a visual and audible alarm when the gas concentration reaches 25% of
the lower explosive limit.
During the inspection, the PHMSA inspector requested the procedure as part of the review of the
records for this compliance item. ESNG provided a procedure for the inspection and testing of the
fire system, including the gas detection devices. The procedure did not provide adequate detail for
the testing of fixed gas detectors and alarms.
In response to a follow-up email from the PHMSA inspector, ESNG provided a draft of a new
procedure, Fire Panel Inspection Procedure, dated November 10, 2017, which addressed the fire
panel system performance testing, including the fixed gas detectors. The draft incorporated the
detailed elements of a test, but did not adopt specific language to verify the functionality of the
devices at gas concentrations exceeding 25% LEL.
120181012M_Notice of Amendment_05142018_text Page 3 of 5



CPF 1-2018-1012M
4. § 192.7 What documents are incorporated by reference partly or wholly in this part?
(a) This part prescribes standards, or portions thereof, incorporated by reference into
this part with the approval of the Director of the Federal Register in 5 U.S.C. 552(a)
and 1 CFR part 51. The materials listed in this section have the full force of law. To
enforce any edition other than that specified in this section, PHMSA must publish a
notice of change in the Federal Register.
ESNG failed to have a provision in its Integrity Management Plan that specifically addresses non-
mandatory language (should/shall) from the standards, and that adopts the language as mandatory
for purposes of implementing the regulation.
During the inspection, the PHMSA inspector reviewed ESNG’s Integrity Management Plan (IM
Plan). There was not a specific section in ESNG’s IM Plan that incorporates the appropriate
editions of ASME B31.8S or NACE SP0502 by reference.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 60 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Eastern Shore Natural Gas Company maintain documentation
of the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
PHMSA Eastern Region, 820 Bear Tavern Road, Suite 103, West Trenton, NJ 08628. Please refer
to CPF 1-2018-1012M on each document you submit, and whenever possible provide a signed
PDF copy in electronic format. Smaller files may be emailed to robert.burrough@dot.gov. Larger
files should be sent on a CD accompanied by the original paper copy to the Eastern Region Office.
120181012M_Notice of Amendment_05142018_text Page 4 of 5



CPF 1-2018-1012M
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
120181012M_Notice of Amendment_05142018_text Page 5 of 5
- **truncated:** false
- **body characters:** 13623