# SUNOCO PIPELINE L.P. — Warning Letter

- **operation:** document
- **citation:** CPF 120185026W
- **title:** SUNOCO PIPELINE L.P. — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-08-22
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.420(c), 195.589(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120185026w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120185026w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120185026w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120185026W
**body:**

Warning Letter involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulations as 195.420(c),  195.589(c). The case was opened on 2018-08-22 and is reported as closed as of 2018-08-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120185026W_Warning Letter_08222018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120185026W/120185026W_Warning%20Letter_08222018.pdf

120185026W_Warning Letter_08222018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120185026W/120185026W_Warning%20Letter_08222018_text.pdf

120185026W_Warning Letter_08222018_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
August 22, 2018
Mr. Greg McIlwain
Senior Vice President of Operations
Sunoco Pipeline L.P.
1300 Main Street
Houston, TX 77002
CPF 1-2018-5026W
Dear Mr. McIlwain:
From April 3, 2017 to August 11, 2017, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Sunoco Pipeline L.P.’s (Sunoco) Mariner East 1 pipeline system in Pennsylvania.
As a result of the inspection, it is alleged that Sunoco has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violation(s) are:
1. § 195.420 Valve Maintenance.
(c) Each operator shall provide protection for each valve from unauthorized
operation and from vandalism.
Sunoco failed to provide protection for each valve from vandalism. Specifically, the temporary
fencing at 2 valve sites along its Mariner East 1 (ME1) pipeline did not provide adequate protection
from vandalism.
During the field inspection of the ME1 pipeline segment from Houston to Delmont, PA, the
PHMSA inspector observed valves located at the following locations that were not adequately
protected from vandalism:
1. Youghiogheny River South Mainline Valve Station near West Newton, PA.



CPF 1-2018-5026W
Each valve at this site was within enclosed and locked temporary fencing due to construction.
However, several of the temporary fencing panels at the Youghiogheny River South mainline
Valve Station were held together by single application of thin wire or string, which can easily
allow access by unauthorized individuals.
2. Pike Mainline Valve Station near Houston, PA.
Each valve at this site was within enclosed and locked temporary fencing due to construction.
However, the temporary fencing was constructed with a large open gap (roughly 2 feet wide x 3.5
feet tall) at ground level. Hay bundles were placed inside the fencing at the open gap. This gap can
easily allow access by unauthorized individuals.
Thus, Sunoco failed to provide protection for each valve from vandalism as required by
§ 195.420(c).
2. § 195.589 What corrosion control information do I have to maintain?
(c) You must maintain a record of each analysis, check, demonstration, examination,
inspection, investigation, review, survey, and test required by this subpart in
sufficient detail to demonstrate the adequacy of corrosion control measures or that
corrosion requiring control measures does not exist. You must retain these records
for at least 5 years except that records related to Secs. 195.569, 195.573(a) and (b),
and 195.579(b)(3) and (c) must be retained for as long as the pipeline remains in
service.
Sunoco failed to maintain, for at least 5 years, a record of each inspection required by Subpart H
of 49 CFR Part 195 in sufficient detail to demonstrate the adequacy of corrosion control measures.
Specifically, Sunoco could not provide sufficiently detailed records documenting the pipe coating
inspections on buried pipe and fittings just prior to lowering into the ditch at the Mariner East 1
Plainfield Station, pursuant to § 195.561(a).
Section 195.561(a) states:
“You must inspect all external pipe coating required by Sec. 195.557 just prior to lowering the
pipe into the ditch or submerging the pipe.”
During the inspection, the PHMSA inspector reviewed Coating Daily Reports for the Mariner
East 1 pipe & fittings. A report for three 90-degree pipe fittings, dated 2/23/25, indicated by the
coating inspector (in red font): “WILL NEED TO BE HOLIDAY TESTED”
The PHMSA inspector required evidence that these fittings were holiday tested as called for by
the coating inspector’s report notes.
In a letter from Sunoco to PHMSA, dated June 29, 2017, Sunoco stated in part:
Holiday testing is typically done when the pipeline parts are installed in the ground… The
Inspection Daily Reports dated 7/15/2015 and 7/16/2015 document that holiday testing was
performed for these spools during final installation. …The inspection daily reports provided for
July 15, 2015 and July 16, 2015 document the subject spools were holiday tested just prior to
lowering in for construction.
120185026W_Warning Letter_08222018_text
Page 2 of 3



CPF 1-2018-5026W
PHMSA reviewed the 7/15/2015 and 7/16/2015 reports and found that they do not contain
sufficient detail to satisfy § 195.589 requirements, pursuant to § 195.561(a).
The two inspection reports do not indicate that a coating inspection was performed. The inspector’s
report notes state that a “subcontractor was on site to perform jeeping”, but Sunoco could not
provide records showing further details, which could include information such as confirmation
that jeeping was completed, what holiday testing equipment was used, what voltage settings were
used, equipment calibration information, outcome of the testing, etc.
Therefore, Sunoco’s records do not reflect, in sufficient detail, that an inspection of the coating
was performed just prior to lowering the pipe into the ditch pursuant to § 195.561(a).
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$209,002 per violation per day the violation persists, up to a maximum of $2,090,022 for a related
series of violations. For violations occurring prior to November 2, 2015, the maximum penalty
may not exceed $200,000 per violation per day, with a maximum penalty not to exceed $2,000,000
for a related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the item(s) identified in this letter.
Failure to do so will result in Sunoco being subject to additional enforcement action.
Please be advised that all material you submit in response to this enforcement action is subject to
being made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for confidential
treatment redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. 552(b).
No reply to this letter is required. If you choose to reply, please submit all correspondence in this
matter to Robert Burrough, Director, PHMSA Eastern Region, 820 Bear Tavern Road, Suite 103,
West Trenton, NJ 08628. Please refer to CPF 1-2018-5026W on each document you submit, and
whenever possible provide a signed PDF copy in electronic format. Smaller files may be emailed
to robert.burrough@dot.gov. Larger files should be sent on a CD accompanied by the original
paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration