- **summary:** CLOSED warning letter citing 195.202.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120185030w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120185030w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120185030w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120185030W
**body:**

Warning Letter involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulation as 195.202. The case was opened on 2018-11-06 and is reported as closed as of 2018-11-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120185030W_Warning Letter_11062018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120185030W/120185030W_Warning%20Letter_11062018.pdf

120185030W_Warning Letter_11062018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120185030W/120185030W_Warning%20Letter_11062018_text.pdf

120185030W_Warning Letter_11062018_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
November 6, 2018
Mr. Greg McIlwain
Senior Vice President, Operations
Sunoco Pipeline L.P.
1300 Main Street
Houston, TX 77002
CPF 1-2018-5030W
Dear Mr. McIlwain:
From June 30, 2017 to April 5, 2018, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Sunoco Pipeline L.P.’s (Sunoco) Delaware River HDD Bore project in Aston, PA.
As a result of the inspection, it is alleged that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violation(s) are:
1. § 195.202 Compliance with specifications or standards.
Each pipeline system must be constructed in accordance with comprehensive written
specifications or standards that are consistent with the requirements of this part.
Sunoco’s pipeline system was not constructed in accordance with Sunoco’s Construction Scope of
Work for SXL 12-INCH and MIPC 8-INCH DELAWARE RIVER, Issue Date: SEPTEMBER
2016 (Scope of Work). Specifically, some of the dry film thickness measurements from Sunoco’s
Coating Thickness Reports were less than 50 mils thick so they failed to follow the requirements
of the Scope of Work.
During the inspection, a PHMSA inspector observed that some of the dry film thickness
measurements from Sunoco’s Coating Thickness Reports were less than 50 mils. Section 3.8.2
Girth Welds of the Scope of Work stated in part, “Powercrete R95 with total minimum thickness
of 50 mils shall be applied to the drill pipe.”



CPF 1-2018-5030W
Since Sunoco utilized its Scope of Work as construction specifications, and since some of the dry
film thickness measurement did not meet the minimum thickness specified in the Scope of Work,
Sunoco failed to comply with its written specifications.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$209,002 per violation per day the violation persists, up to a maximum of $2,090,022 for a related
series of violations. For violations occurring prior to November 2, 2015, the maximum penalty
may not exceed $200,000 per violation per day, with a maximum penalty not to exceed $2,000,000
for a related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the item(s) identified in this letter.
Failure to do so will result in Sunoco Pipeline L.P. being subject to additional enforcement action.
Please be advised that all material you submit in response to this enforcement action is subject to
being made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for confidential
treatment redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. 552(b).
No reply to this letter is required. If you choose to reply, please submit all correspondence in this
matter to Robert Burrough, Director, PHMSA Eastern Region, 840 Bear Tavern Road, Suite 300,
West Trenton, NJ 08628. Please refer to CPF 1-2018-5030W on each document you submit, and
whenever possible provide a signed PDF copy in electronic format. Smaller files may be emailed
to robert.burrough@dot.gov. Larger files should be sent on a CD accompanied by the original
paper copy to the Eastern Region Office.
Please note, the address for the PHMSA Eastern Region, Office of Pipeline Safety, has changed:
PHMSA, Eastern Region, Office of Pipeline Safety
840 Bear Tavern Road, Suite 300
West Trenton, NJ 08628
Please make a note of this new information in your records. If you have any questions, please
contact us at 609-771-7800.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
120185030W_Warning Letter_11062018_text Page 2 of 2