# DANVILLE, CITY OF — Notice of Amendment

- **operation:** document
- **citation:** CPF 120190008M
- **title:** DANVILLE, CITY OF — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-07-02
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 199.101(a)(1), 199.202.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120190008m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120190008m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120190008m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120190008M
**body:**

Notice of Amendment involving DANVILLE, CITY OF. PHMSA's enforcement data identifies the cited regulations as 199.101(a)(1),  199.202. The case was opened on 2019-07-02 and is reported as closed as of 2020-03-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120190008M_Closure Letter_03102020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190008M/120190008M_Closure%20Letter_03102020.pdf

120190008M_Closure Letter_03102020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190008M/120190008M_Closure%20Letter_03102020_text.pdf

120190008M_Notice of Amendment_07022019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190008M/120190008M_Notice%20of%20Amendment_07022019.pdf

120190008M_Notice of Amendment_07022019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190008M/120190008M_Notice%20of%20Amendment_07022019_text.pdf

120190008M_Operator Response to Notice_08012019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190008M/120190008M_Operator%20Response%20to%20Notice_08012019.pdf

120190008M_Notice of Amendment_07022019_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
July 2, 2019
Kelly P. Kinnett, P.E.
Water and Gas Director
City of Danville
1040 Monument Street
Danville, VA 24540
CPF 1-2019-0008M
Dear Mr. Kinnett:
On November 29 and 30, 2017, inspectors from the Virginia State Corporation Comission (VA
SCC) acting as Agent for the Pipeline and Hazardous Materials Safety Administration (PHMSA)
pursuant to Chapter 601 of 49 United States Code inspected the City of Danville’s (City)
procedures.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within the
City’s plans or procedures, as described below:
1. § 199.101 Anti-drug plan.
(a) Each operator shall maintain and follow a written anti-drug plan that conforms
to the requirements of this part and the DOT Procedures. The plan must contain
—
(1) Methods and procedures for compliance with all the requirements of this
part, including the employee assistance program;
The City’s anti-drug plan was inadequate in that it did not conform to the requirements of 49
C.F.R. Part 199 and 49 C.F.R. Part 40 (DOT Procedures).



CPF 1-2019-0008M
During the inspection, the VA SCC inspector reviewed the City’s Drug and Alcohol Control and
Testing Policy, effective July 1, 2012, (Testing Policy) and noted the Testing Policy did not
include:
 provisions to ensure that DOT drug tests are completely separate from non-DOT drug
tests in all respects, as required by § 40.13(a).
 provisions to ensure that the City does not knowingly use as an employee any person who
fails a drug test required by Part 199 and the medical review officer (MRO) makes a
determination under DOT Procedures (§ 40.25), or refuses to take a drug test required by
Part 199, as required by § 199.103(a).
 provisions to ensure the urine specimen collectors used by the City meet the applicable
qualifications, as required by § 40.33.
 provisions to ensure the drug testing laboratory does not test DOT specimens for any
other drugs: only marijuana metabolites, cocaine metabolites, amphetamines, opiate
metabolites, and phencyclidine, as required by § 40.85.
 provisions to ensure the City stops using the services of the service agent no later than 90
days after the Department has published a public interest exclusion (PIE), as required by
§ 40.409(b).
 the correct definition of an accident, as defined in § 199.3. The definition in the City’s
Drug and Alcohol Testing Policy was missing the following language “Unintentional
estimated gas loss of three million cubic feet or more.” as specified in § 191.3(1)(iii).
 provisions to ensure post-accident drug testing was performed on covered employees
whose performance of a covered function either contributed to the accident or cannot be
completely discounted as a contributing factor to the accident, as required by
§ 199.105(b).
 provisions on minimum annual percentage rate for random drug testing, as required by
§ 199.105(c).
 provisions for the use of only drug testing laboratories certified by the Department of
Health and Human Services, as required by § 199.107(a) and § 40.81(a).
 provisions to ensure the City’s MRO has the applicable qualification requirements,
required per § 199.109(b) and § 40.121.
 provisions to ensure the laboratory reports laboratory results directly, and only, to the
MRO at his or her place of business, required per § 199.109(d) and § 40.97(b).
 provisions to ensure the test results are transmitted to the MRO in a timely manner,
preferably the same day that the review by the certified scientist is complete, as required
per § 199.109(d) and § 40.97(d).
 provisions to ensure that the City is responsible for ensuring contractors carrying out the
drug testing, education, and training required by Part 199 (for employees who are
contractors or are employed by a contractor), as required by § 199.115(a).
Therefore, the City’s anti-drug plan was inadequate because it did not conform to the
requirements of Parts 199 and 40.
120190008M_Notice of Amendment_07022019_text Page 2
of 4



CPF 1-2019-0008M
2. § 199.202 Alcohol misuse plan.
Each operator must maintain and follow a written alcohol misuse plan that
conforms to the requirements of this part and DOT Procedures concerning alcohol
testing programs. The plan shall contain methods and procedures for compliance
with all the requirements of this subpart, including required testing, recordkeeping,
reporting, education and training elements.
The City’s alcohol misuse plan was inadequate in that it did not conform to the requirements of
Part 199 and 49 C.F.R. Part 40 (DOT Procedures) concerning alcohol testing programs.
During the inspection, the VA SCC inspector reviewed the City’s Drug and Alcohol Control and
Testing Policy, effective July 1, 2012, (Testing Policy) and noted the Testing Policy did not
include:
 provisions to ensure that DOT alcohol tests are completely separate from non-DOT
alcohol tests in all respects, as required by § 40.13.
 provisions to ensure that breath alcohol technicians (BAT) and screening test technicians
(STT) meet each of the requirements of § 40.213.
 the correct definition of an accident, as defined in § 199.3. The definition in the City’s
Testing Policy was missing the following language, “Unintentional estimated gas loss of
three million cubic feet or more,” as specified in § 191.3(1)(iii).
 provisions for, as soon as practicable following an accident, administering to each
surviving covered employee alcohol tests for the presence of alcohol if that employee’s
performance of a covered function either contributed to the accident or cannot be
completely discounted as a contributing factor to the accident, as required per
§ 199.225(a).
 provisions to require a covered employee to submit to an alcohol test when the operator
has reasonable suspicion to believe that the employee has violated the prohibitions of
Subpart C of Part 199, as required by § 199.225(b)(1).
 provisions for not permitting any covered employee to perform covered functions if the
employee has engaged in conduct prohibited by §§ 199.215 through 199.223 or an
alcohol misuse rule of another DOT agency, as required by § 199.233.
 provisions specifying that the City is responsible for ensuring that a contactor carrying
out the alcohol testing, training and education requirements of Subpart C of Part 199 and
Part 40 (for employees who are contractors or employed by a contractor) comply with
those requirements, as required by § 199.245(b).
Therefore, the City’s alcohol misuse plan was inadequate because it did not conform to the
requirements of Parts 199 and 40 concerning alcohol testing programs.
120190008M_Notice of Amendment_07022019_text Page 3
of 4



CPF 1-2019-0008M
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
[number of days] days of receipt of this Notice. This period may be extended by written request
for good cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.
It is requested (not mandated) that the City maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Robert Burrough, Director, PHMSA Eastern Region, 840 Bear
Tavern Road, Suite 300, West Trenton, NJ 08628. Please refer to CPF 1-2019-0008M on each
document you submit, and whenever possible provide a signed PDF copy in electronic format.
Smaller files may be emailed to robert.burrough@dot.gov. Larger files should be sent on USB
flash drive accompanied by the original paper copy to the Eastern Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosures: Response Options for Pipeline Operators in Compliance Proceedings
120190008M_Notice of Amendment_07022019_text Page 4
of 4

120190008M_Closure Letter_03102020_text.pdf

OVERNIGHT EXPRESS DELIVERY
March 10, 2020
Kelly P. Kinnett, P.E.
Water and Gas Director
City of Danville
1040 Monument Street
Danville, VA 24540
CPF 1-2019-0008M
Dear Mr. Kinnett:
On November 29 and 30, 2017, inspectors from the Virginia State Corporation Comission (VA-
SCC), acting as Agent for the Pipeline and Hazardous Materials Safety Administration (PHMSA),
pursuant to Chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection
of the City of Danville’s procedures in Danville, VA. As a result of the inspection, the City of
Danville was issued a Notice of Amendment on July 2, 2019, which proposed amendment of your
procedures.
The City of Danville submitted its amended procedures on February 25, 2020. My staff reviewed
the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration