# CITIZENS GAS UTIL DIST — Notice of Amendment

- **operation:** document
- **citation:** CPF 120190012M
- **title:** CITIZENS GAS UTIL DIST — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-08-12
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.12(e).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120190012m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120190012m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120190012m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120190012M
**body:**

Notice of Amendment involving CITIZENS GAS UTIL DIST. PHMSA's enforcement data identifies the cited regulation as 192.12(e). The case was opened on 2019-08-12 and is reported as closed as of 2020-03-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120190012M_Closure Letter_03062020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190012M/120190012M_Closure%20Letter_03062020.pdf

120190012M_Closure Letter_03062020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190012M/120190012M_Closure%20Letter_03062020_text.pdf

120190012M_Notice of Amendment_08122019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190012M/120190012M_Notice%20of%20Amendment_08122019.pdf

120190012M_Notice of Amendment_08122019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120190012M/120190012M_Notice%20of%20Amendment_08122019_text.pdf

120190012M_Closure Letter_03062020_text.pdf

OVERNIGHT EXPRESS DELIVERY
March 6, 2020
Mr. Greg Bell
General Manager
Citizens Gas Utility District
12519 Scott Hwy, PO Box 320
Helenwood TN, 37755
CPF 1-2019-0012M
Dear Mr. Bell:
From December 11 through 13, 2018, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
inspected Citizens Gas Utility District (CGUD) Indian Creek Underground Gas Storage Facility
in Morgan County, TN. As a result of the inspection, CGUD was issued a Notice of Amendment
on August 12, 2019, which proposed amendment of your procedures.
CGUD submitted its amended procedures on or about January 31, 2020. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120190012M_Notice of Amendment_08122019_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
August 12, 2019
Mr. Greg Bell
General Manager
Citizens Gas Utility District
12519 Scott Hwy, PO Box 320
Helenwood TN, 37755
CPF 1-2019-0012M
Dear Mr. Bell:
From December 11 through 13, 2018, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Citizens Gas Utility District’s (CGUD) Indian Creek Underground Natural Gas Storage
Field in Morgan County, TN.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
CGUD’s plans or procedures, as described below:
1. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.



CPF 1-2019-0012M
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD’s had not established procedures that used
the risk assessment process to determine the frequency requirements for integrity demonstration,
verification, and monitoring tasks or activities as required in API RP 1171, Section 9.2.2.
API RP 1171, Section 9.2.2 states, in part:
Risk assessments shall be used as a basis for developing the integrity demonstration,
verification, and monitoring tasks and evaluating their frequency requirements.
At the time of inspection, CGUD’s procedures failed to address this requirement of API RP 1171,
Section 9.2.2.
2. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD did not detail how, and how frequently, it
would request well integrity evaluation data from third-party well owners/operators as required in
API RP 1171, Section 9.3.1.
API RP 1171, Section 9.3.1 states, in part:
The operator shall evaluate the mechanical integrity of each active well, including each
third-party well, that penetrates the storage reservoir and buffer zone or areas influenced
by storage operations.
The operator shall request well integrity evaluation data from third-party well
owner/operators following the frequency established using conclusions from the risk
assessment.
At the time of the inspection, CGUD’s procedures failed to address these specific requirements of
API RP 1171, Section 9.3.1.
120190012M_Notice of Amendment_08122019_text Page 2 of 7



CPF 1-2019-0012M
3. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD did not have a process to integrate the well
integrity evaluations into the risk management program as required in API RP 1171, Section 9.3.1.
API RP 1171, Section 9.3.1 states, in part:
Active well mechanical integrity evaluations shall include initial and subsequent
evaluations as determined using the risk assessment and the information derived from the
initial evaluation.
At the time of the inspection, CGUD’s procedures failed to address this requirement of API RP
1171, Section 9.3.1.
4. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD had not established procedures to monitor
for the presence of annular gas between the surface casing and production casing and did not define
a threshold or limit for that annular pressure and/or gas flow as required in API RP 1171, Section
9.3.2.
API RP 1171, Section 9.3.2 states, in part:
The operator shall monitor for presence of annular gas by measuring and recording annular
pressure and/or annular gas flow.
The operator shall evaluate each annular gas occurrence that exceeds operator- or
regulatory-defined threshold levels determined from well integrity evaluation and from risk
assessment.
120190012M_Notice of Amendment_08122019_text Page 3 of 7



CPF 1-2019-0012M
At the time of the inspection, CGUD’s procedures failed to address these requirements of API RP
1171, Section 9.3.2.
5. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD's procedures did not describe how to
annually test the operation of the master valve and wellhead pipeline isolation valve for proper
function and ability to isolate the well, and did not have a valve maintenance program for
maintaining, repairing, and replacing isolation valves as required in API RP 1171, Section 9.3.2.
API RP 1171, Section 9.3.2 states, in part:
The operator shall test the operation of the master valve and wellhead pipeline isolation
valve at least annually for proper function and ability to isolate the well.
The valves shall be maintained, repaired, or replaced in accordance with the operator’s
valve maintenance program for isolation valves.
At the time of the inspection, CGUD’s procedures failed to address these requirements of API RP
1171, Section 9.3.2.
6. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD's procedures in UGS-01, Section 6.2 did
not specify the types of integrity-related inspections, tests, patrols and analyses that are to be
documented as required in API RP 1171, Section 9.8.1.
120190012M_Notice of Amendment_08122019_text Page 4 of 7



CPF 1-2019-0012M
API RP 1171, Section 9.8.1 states, in part:
Inspections, tests, patrols, or analyses shall be documented according to the operator’s
procedures.
At the time of the inspection, CGUD’s procedures failed to address this requirement of API RP
1171, Section 9.8.1.
7. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD's procedures in UGS-03, Section 5.1.2 did
not specify that well information be provided on the well signs as required in API RP 1171, Section
10.4.1.
API RP 1171, Section 10.4.1 states, in part:
Permanent weatherproof signage shall be installed at each well site for identification
purposes.
At the time of the inspection, CGUD’s procedure UGS-03 failed to address this requirement of
API RP 1171, Section 10.4.1.
8. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD’s Emergency Response Plan did not include
provisions to address equipment failure and 3rd party damage as required in API RP 1171, Section
10.6.1.
API RP 1171, Section 10.6.1 states, in part:
120190012M_Notice of Amendment_08122019_text Page 5 of 7



CPF 1-2019-0012M
For site security and safety, the operator shall develop and implement a structured
emergency preparedness/response plan in order to address accidental releases, equipment
failures, natural disasters, and third-party emergencies.
9. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD did not have a formal Blowout Contingency
Plan in place as required by API RP 1171, Section 10.6.3.
API RP 1171, Section 10.6.3 states, in part:
The operator shall have a blowout contingency plan in place.
At the time of the inspection, CGUD did not have a Blowout Contingency Plan in place.
10. §192.12 Underground natural gas storage facilities.
(e) Operators of underground gas storage facilities must establish and follow written
procedures for operations, maintenance, and emergencies implementing the
requirements of API RP 1170 and API RP 1171, as required under this section,
including the effective dates as applicable, and incorporate such procedures into their
written procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
CGUD’s procedures for operations, maintenance, and emergencies implementing the requirements
of API RP 1171 were inadequate. Specifically, CGUD did not have adequate procedures in place
to determine that personnel were familiar with emergency plans and procedures, and did not define
a frequency for reviewing and updating the Blowout Contingency Plan as required in API RP
1171, Section 11.4.2.
API RP 1171, Section 11.4.2 states, in part:
The operator shall establish a program to determine operator familiarity with emergency
plans and procedures and periodic testing of the effectiveness of the plan in accordance
with 10.6.
At the time of the inspection, CGUD’s procedures failed to address these requirements of API RP
1171, Section 11.4.2.
120190012M_Notice of Amendment_08122019_text Page 6 of 7



CPF 1-2019-0012M
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 60 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Citizens Gas Utility District maintain documentation of the
safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
PHMSA Eastern Region, 840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. Please refer
to CPF 1-2019-0012M on each document you submit, and whenever possible provide a signed
PDF copy in electronic format. Smaller files may be emailed to robert.burrough@dot.gov. Larger
files should be sent on USB flash drive accompanied by the original paper copy to the Eastern
Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
120190012M_Notice of Amendment_08122019_text Page 7 of 7