# NORTHERN NATURAL GAS CO — Warning Letter

- **operation:** document
- **citation:** CPF 120191013W
- **title:** NORTHERN NATURAL GAS CO — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-07-22
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.12(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120191013w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120191013w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120191013w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120191013W
**body:**

Warning Letter involving NORTHERN NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulation as 192.12(d). The case was opened on 2019-07-22 and is reported as closed as of 2019-07-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120191013W_Operator Response to Notice_07312019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191013W/120191013W_Operator%20Response%20to%20Notice_07312019.pdf

120191013W_Warning Letter_07222019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191013W/120191013W_Warning%20Letter_07222019.pdf

120191013W_Warning Letter_07222019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191013W/120191013W_Warning%20Letter_07222019_text.pdf

120191013W_Warning Letter_07222019_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
July 22, 2019
Mr. Royce Ramsay
Vice President, Operations
Northern Natural Gas Company
1111 South 103rd Street
Omaha, NE 68124
CPF 1-2019-1013W
Dear Mr. Ramsay:
On May 15-17, 2018, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected
Northern Natural Gas Company’s (NNG) Redfield Underground Storage Facility (UGS) in
Redfield, IA.
As a result of the inspection, it is alleged that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violation are:
1. § 192.12 Underground natural gas storage facilities.
(d) Each underground natural gas storage facility that uses a depleted hydrocarbon
reservoir or an aquifer reservoir for gas storage, including those constructed not later
than July 18, 2017 must meet the operations, maintenance, integrity demonstration
and verification, monitoring, threat and hazard identification, assessment,
remediation, site security, emergency response and preparedness, and recordkeeping
requirements and recommendations of API RP 1171, sections 8, 9, 10, and 11
(incorporated by reference, see §192.7) by January 18, 2018.



CPF 1-2019-1013W
NNG failed to meet the monitoring requirements of API RP 1171, section 9. Specifically, NNG
failed to evaluate each annular gas occurrence that exceeded operator-defined threshold levels
determined from well integrity evaluation and from risk assessment, as directed by API RP 1171,
Section 9.3.2.
Section 9.3.2 of API RP 1171, Well Integrity Monitoring, states in part:
The operator shall evaluate each annular gas occurrence that exceeds operator- or
regulatory-defined threshold levels determined from well integrity evaluation and from risk
assessment.
NNG’s Procedure 6.15.1, Annulus Pressure Monitoring, required a follow-up for 10 psi and greater
annular pressure changes recorded during monthly readings.
NNG's Procedure OI-003, Annulus Pressure Recording, dated 4/28/16 (OI-003), stated in part:
6.5.4 The storage field will evaluate each occurrence that exceeds the established
threshold levels determined from well integrity evaluation and from risk assessment. The
operator should test wellhead seals when annulus pressure is detected and where injectable
packing and/or test ports are present.
6.5.5 The storage field will prepare a monthly report to Pipeline Safety with the past two
monthly pressure readings per well with an assessment on whether the pressure readings
exceed defined threshold levels and if a threshold was exceeded, actions taken or being
taken to address. The report will be stored in P8.
During the field inspection at Redfield UGS facility, the PHMSA inspector reviewed records of
NNG’s annular gas monitoring. The records demonstrated that NNG had not evaluated each
annular gas occurrence that exceeded its established threshold of 10 psi and greater changes during
monthly monitoring, as required in NNG’s Procedure 6.15.1 and OI-003 Sections 6.5.4-6.5.5.
Therefore, NNG failed to meet the monitoring requirements of API RP 1171, section 9.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$213,268 per violation per day the violation persists, up to a maximum of $2,132,679 for a related
series of violations. For violation occurring on or after November 2, 2015 and before November
27, 2018, the maximum penalty may not exceed $209,002 per violation per day, with a maximum
penalty not to exceed $2,090,022. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty not to
exceed $2,000,000 for a related series of violations. We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct the
item(s) identified in this letter. Failure to do so will result in Northern Natural Gas Company being
subject to additional enforcement action.
120191013W_Warning Letter_07222019_text Page 2 of 3



CPF 1-2019-1013W
Please be advised that all material you submit in response to this enforcement action is subject to
being made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for confidential
treatment redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. 552(b).
No reply to this letter is required. If you choose to reply, please submit all correspondence in this
matter to Robert Burrough, Director, PHMSA Eastern Region, 840 Bear Tavern Road, Suite 300,
West Trenton, NJ 08628. Please refer to CPF 1-2019-1013W on each document you submit, and
whenever possible provide a signed PDF copy in electronic format. Smaller files may be emailed
to robert.burrough@dot.gov. Larger files should be sent on USB flash drive accompanied by the
original paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
120191013W_Warning Letter_07222019_text Page 3 of 3
- **truncated:** false
- **body characters:** 6307