# PGPIPELINE, LLC. — Notice of Amendment

- **operation:** document
- **citation:** CPF 120191018M
- **title:** PGPIPELINE, LLC. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-09-26
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.243(a), 192.243(b), 192.243(c), 192.243(d), 192.243(e), 192.605(b)(5), 192.615(a)(6), 192.615(a)(8), 192.805(i), 192.909(b), 192.925(b)(4), 192.935(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120191018m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120191018m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120191018m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120191018M
**body:**

Notice of Amendment involving PGPIPELINE, LLC.. PHMSA's enforcement data identifies the cited regulations as 192.243(a),  192.243(b),  192.243(c),  192.243(d),  192.243(e),  192.605(b)(5),  192.615(a)(6),  192.615(a)(8),  192.805(i),  192.909(b),  192.925(b)(4),  192.935(d). The case was opened on 2019-09-26 and is reported as closed as of 2019-11-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120191018M_Closure Letter_11052019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191018M/120191018M_Closure%20Letter_11052019.pdf

120191018M_Closure Letter_11052019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191018M/120191018M_Closure%20Letter_11052019_text.pdf

120191018M_Notice of Amendment_09262019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191018M/120191018M_Notice%20of%20Amendment_09262019.pdf

120191018M_Notice of Amendment_09262019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191018M/120191018M_Notice%20of%20Amendment_09262019_text.pdf

120191018M_Operator Response to Notice_10232019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120191018M/120191018M_Operator%20Response%20to%20Notice_10232019.pdf

120191018M_Notice of Amendment_09262019_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
September 26, 2019
Mr. Steve Newell
Director of Finance
Zeeland Farm Services, Inc.
2525 84th Ave
Zeeland, MI 49464
CPF 1-2019-1018M
Dear Mr. Newell:
From January 23, 2019 – July 11, 2019, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
performed an integrated inspection of PGPipeline, LLC’s (PGPipeline) pipeline system in
Clearfield, Pennsylvania. PGPipeline is a second-tier subsidiary of Zeeland Farm Services, Inc.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
PGPipeline’s plans or procedures, as described below:
1. § 192.243 Nondestructive testing
(a) Nondestructive testing of welds must be performed by any process, other than
trepanning, that will clearly indicate defects that may affect the integrity of the weld.
(b) Nondestructive testing of welds must be performed:
(1) In accordance with written procedures; and
(2) By persons who have been trained and qualified in the established
procedures and with the equipment employed in testing.
(c) Procedures must be established for the proper interpretation of each
nondestructive test of a weld to ensure the acceptability of the weld under §192.241(c).



CPF 1-2019-1018M
(d) When nondestructive testing is required under §192.241(b), the following
percentages of each day's field butt welds, selected at random by the operator, must
be nondestructively tested over their entire circumference;
(1) In Class 1 locations, except offshore, at least 10 percent.
(2) In Class 2 locations, at least 15 percent.
(3) In Class 3 and Class 4 locations, at crossings of major or navigable rivers,
offshore, and within railroad or public highway rights-of-way, including
tunnels, bridges, and overhead road crossings, 100 percent unless
impracticable, in which case at least 90 percent. Nondestructive testing must
be impracticable for each girth weld not tested.
(4) At pipeline tie-ins, including tie-ins of replacement sections, 100 percent.
(e) Except for a welder or welding operator whose work is isolated from the principal
welding activity, a sample of each welder or welding operator's work for each day
must be nondestructively tested, when nondestructive testing is required under
§192.241(b).
PGPipeline’s written procedures were inadequate. Specifically, PGPipeline failed to establish
written procedures for nondestructive testing in accordance with § 192.243.
During the inspection, the PHMSA inspector requested PGPipeline’s procedures for
nondestructive testing. PGPipeline provided its Operations, Maintenance, and Emergency
Manual. However, the manual did not include nondestructive testing procedures addressing any of
the aspects required under § 192.243.
2. § 192.605 Procedural manual for operations, maintenance, and emergencies
(b) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following, if applicable, to provide
safety during maintenance and operations.
…
(5) Starting up and shutting down any part of the pipeline in a manner
designed to assure operation within the MAOP limits prescribed by this part,
plus the build-up allowed for operation of pressure-limiting and control
devices.
PGPipeline’s written procedures were inadequate. Specifically, PGPipeline’s procedures failed to
address starting up and shutting down any part of the pipeline in a manner designed to assure
operation within the MAOP limits, plus the build-up allowed for operation of pressure-limiting
and control devices.
120191018M_Notice of Amendment_09262019_text Page 2 of 7



CPF 1-2019-1018M
During the inspection, the PHMSA inspector reviewed Section 4: Operations of the Operations,
Maintenance and Emergency Manual updated February 17, 2019. The procedures failed to address
pipeline start up and shut down activities in accordance with § 192.605(b)(5).
3. § 192.615 Emergency Plans
(a) Each operator shall establish written procedures to minimize the hazard resulting
from a gas pipeline emergency. At a minimum, the procedures must provide for
the following:
…
(6) Emergency shutdown and pressure reduction in any section of the
operator’s pipeline system necessary to minimize hazards to life of property
PGPipeline’s written procedures were inadequate. Specifically, PGPipeline’s written procedures
failed to provide for the emergency shutdown and pressure reduction of any section of the its
pipeline system necessary to minimize hazards to life and property.
During the inspection, the PHMSA inspector reviewed Section 9: Emergency Plan, of the
Operations, Maintenance and Emergency Manual, updated February 17, 2019. The procedure
failed to address emergency shutdown and pressure reduction in accordance with § 192.615(a)(6).
4. § 192.615 Emergency Plans
(a) Each operator shall establish written procedures to minimize the hazard
resulting from a gas pipeline emergency. At a minimum, the procedures must provide
for the following:
…
(8) Notifying appropriate fire, police, and other public officials of gas pipeline
emergencies and coordinating with them both planned responses and actual
responses during an emergency.
PGPipeline’s written procedures were inadequate. Specifically, PGPipeline’s written procedures
failed to provide for notifying appropriate fire, police, and other public officials of gas pipeline
emergencies and coordinating with them both planned responses and actual responses during an
emergency.
During the inspection, the PHMSA inspector reviewed Section 9: Emergency Plan, of the
Operations, Maintenance and Emergency Manual, updated February 17, 2019. The procedure
failed to address notifications for planned responses per § 192.615(a)(8).
5. § 192.805 Qualification Program
Each operator shall have and follow a written qualification program. The
program shall include provisions to:
…
120191018M_Notice of Amendment_09262019_text Page 3 of 7



CPF 1-2019-1018M
(i) After December 16, 2004, notify the Administrator or a state agency participating
under 49 U.S.C. Chapter 601 if the operator significantly modifies the program
after the administrator or state agency has verified that it complies with this
section. Notifications to PHMSA may be submitted by electronic mail to
InformationResourcesManager@dot.gov, or by mail to ATTN: Information
Resources Manager DOT/PHMSA/OPS, East Building, 2nd Floor, E22-321, New
Jersey Avenue SE., Washington, DC 20590.
PGPipeline’s written qualification program (OQ Plan) was inadequate. Specifically, PGPipeline’s
OQ Plan failed to address notifications to the appropriate agency when significant modifications
are made to its operator qualification program.
During the inspection, the PHMSA inspector reviewed PGPipeline’s Operator Qualification Plan,
updated January 23, 2017. The plan did not include notification provisions to PHMSA in
accordance with § 192.805. Instead, the plan only addressed sending notifications to the State
Regulatory Body. In addition, the plan did not provide clear direction on notifying the appropriate
agency (PHMSA) only when significant modifications are made to the plan.
6. § 192.909 How can an operator change its integrity management program?
(b) Notification. An operator must notify OPS, in accordance with §192.949, of any
change to the program that may substantially affect the program's implementation
or may significantly modify the program or schedule for carrying out the program
elements. An operator must also notify a State or local pipeline safety authority when
either a covered segment is located in a State where OPS has an interstate agent
agreement, or an intrastate covered segment is regulated by that State. An operator
must provide the notification within 30 days after adopting this type of change into
its program.
PGPipeline’s written Integrity Management plan (IMP) was inadequate. Specifically,
PGPipeline’s IMP failed to address submitting notifications to the appropriate agency when
significant modifications are made to the Integrity Management program.
During the inspection, the PHMSA inspector reviewed PGPipeline’s Pipeline Integrity
Management Plan, updated June 15, 2013. The plan did not include notification provisions in
accordance with § 192.909(b).
7. § 192.925 What are the requirements for using External Corrosion Direct Assessment
(ECDA)?
(b) General requirements. An operator that uses direct assessment to assess the
threat of external corrosion must follow the requirements in this section, in
ASME/ANSI B31.8S (incorporated by reference, see §192.7), section 6.4, and in
NACE SP0502 (incorporated by reference, see §192.7). An operator must develop and
implement a direct assessment plan that has procedures addressing pre-assessment,
indirect inspection, direct examination, and post assessment. If the ECDA detects
pipeline coating damage, the operator must also integrate the data from the ECDA
120191018M_Notice of Amendment_09262019_text Page 4 of 7



CPF 1-2019-1018M
with other information from the data integration (§192.917(b)) to evaluate the
covered segment for the threat of third party damage and to address the threat as
required by §192.917(e)(1).
…
(4) Post assessment and continuing evaluation. In addition to the
requirements in ASME/ANSI B31.8S section 6.4 and NACE SP0502, section 6,
the plan's procedures for post assessment of the effectiveness of the ECDA
process must include-
(i) Measures for evaluating the long-term effectiveness of ECDA in
addressing external corrosion in covered segments; and
(ii) Criteria for evaluating whether conditions discovered by direct
examination of indications in each ECDA region indicate a need for
reassessment of the covered segment at an interval less than that
specified in § 192.939. (See Appendix D of NACE SP0502.)
PGPipeline’s written External Corrosion Direct Assessment (ECDA) procedure was inadequate.
Specifically, PGPipeline’s ECDA Procedure failed to include measures for evaluating the long-
term effectiveness of ECDA in addressing external corrosion in covered segments and criteria for
determining when conditions discovered by direct examination of indications warrants
reassessment of the covered segment at intervals less than those specified in § 192.939.
During the inspection, the PHMSA inspector reviewed PGPipeline’s ECDA procedure. The
procedure failed to include adequate details regarding the requirements of § 192.925(b)(4).
8. § 192.935 What additional preventive and mitigative measures must an operator
take?
(d) Pipelines operating below 30% SMYS. An operator of a transmission pipeline
operating below 30% SMYS located in a high consequence area must follow the
requirements in paragraphs (d)(1) and (d)(2) of this section. An operator of a
transmission pipeline operating below 30% SMYS located in a Class 3 or Class 4 area
but not in a high consequence area must follow the requirements in paragraphs (d)(1),
(d)(2) and (d)(3) of this section.
(1) Apply the requirements in paragraphs (b)(1)(i) and (b)(1)(iii) of this section to
the pipeline; and
(2) Either monitor excavations near the pipeline, or conduct patrols as required
by § 192.705 of the pipeline at bi-monthly intervals. If an operator finds any
indication of unreported construction activity, the operator must conduct a
follow up investigation to determine if mechanical damage has occurred.
(3) Perform semi-annual leak surveys (quarterly for unprotected pipelines or
cathodically protected pipe where electrical surveys are impractical)
PGPipeline’s written procedures were inadequate. Specifically, PGPipeline’s written procedures
failed to include provisions for implementing preventive and mitigative measures required by
120191018M_Notice of Amendment_09262019_text Page 5 of 7



CPF 1-2019-1018M
§ 192.935(d) for pipelines operating below 30% SMYS within high consequence areas (HCAs) or
in Class 3 or 4 areas outside of HCAs.
During the inspection, the PHMSA inspector reviewed PGPipeline’s procedures, including Section
6 – Maintenance, Inspection & Surveillance of the Operations, Maintenance and Emergency
Manual, updated February 17, 2019, and its Pipeline Integrity Management Plan, updated June 15,
2013. The procedures failed to address the requirements of § 192.935(d).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that PGPipeline, LLC maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, PHMSA Eastern Region,
840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. Please refer to CPF 1-2019-1018M
on each document you submit, and whenever possible provide a signed PDF copy in electronic
format. Smaller files may be emailed to robert.burrough@dot.gov. Larger files should be sent on
USB flash drive accompanied by the original paper copy to the Eastern Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
120191018M_Notice of Amendment_09262019_text Page 6 of 7



CPF 1-2019-1018M
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
120191018M_Notice of Amendment_09262019_text Page 7 of 7

120191018M_Closure Letter_11052019_text.pdf

OVERNIGHT EXPRESS DELIVERY
November 5, 2019
Mr. Steve Newell
Director of Finance
Zeeland Farm Services, Inc.
2525 84th Ave
Zeeland, MI 49464
CPF 1-2019-1018M
Dear Mr. Newell:
From January 23, 2019 – July 11, 2019, a representative from the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, performed
an integrated inspection of PGPipeline, LLC’s (PGPipeline) pipeline system in Clearfield,
Pennsylvania. PGPipeline is a second-tier subsidiary of Zeeland Farm Services, Inc. As a result of
the inspection, PGPipeline was issued a Notice of Amendment on September 26, 2019, which
proposed amendment of your procedures.
Utility Safety and Design Incorporated (USDI), on behalf of PGPipeline, submitted amended
procedures on October 23, 2019. My staff reviewed the amended procedures, and it appears that
the inadequacies outlined in this Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration