# TOTAL PEAKING SERVICES — Notice of Amendment

- **operation:** document
- **citation:** CPF 120195005M
- **title:** TOTAL PEAKING SERVICES — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-04-02
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 193.2017(a), 193.2605(b)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120195005m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120195005m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120195005m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120195005M
**body:**

Notice of Amendment involving TOTAL PEAKING SERVICES. PHMSA's enforcement data identifies the cited regulations as 193.2017(a),  193.2605(b)(1). The case was opened on 2019-04-02 and is reported as closed as of 2019-07-08. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120195005M_Closure Letter_07082019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195005M/120195005M_Closure%20Letter_07082019.pdf

120195005M_Closure Letter_07082019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195005M/120195005M_Closure%20Letter_07082019_text.pdf

120195005M_Notice of  Amendment_04022019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195005M/120195005M_Notice%20of%20%20Amendment_04022019.pdf

120195005M_Notice of Amendment_04022019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195005M/120195005M_Notice%20of%20Amendment_04022019_text.pdf

120195005M_Operator Response to Notice_04302019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195005M/120195005M_Operator%20Response%20to%20Notice_04302019.pdf

120195005M_Notice of Amendment_04022019_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
April 2, 2019
Anthony Marone
Senior Vice President, Gas Operations
AVANGRID Networks
Total Peaking Services
180 Marsh Hill Rd.
Orange, CT 06477
CPF 1-2019-5005M
Dear Mr. Marone:
On April 24 to April 30, 2018, an inspector from the Connecticut Department of Energy and
Environmental Protection (CT DEEP), acting as Agent for Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of
Title 49 of the United States Code inspected Total Peaking Services’ (TPS) records and procedures
for its LNG plant in Bridgeport, Connecticut. TPS is a wholly-owned subsidiary of United
Resources, Inc., which was a subsidiary of UIL Holdings Corporation acquired by Avangrid.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
TPS’s plans or procedures, as described below:
1. § 193.2017 Plans and procedures.
(a) Each operator shall maintain at each LNG plant the plans and procedures
required for that plant by this part. The plans and procedures must be available upon
request for review and inspection by the Administrator or any State Agency that has
submitted a current certification or agreement with respect to the plant under the
pipeline safety laws (49 U.S.C. 60101 et seq.). In addition, each change to the plans or
procedures must be available at the LNG plant for review and inspection within 20
days after the change is made.
TPS written plans and procedures required for each LNG plant by Part 193 were
inadequate. Specifically, TPS procedures failed to include updated guidance for inspection of
cryogenic personal protective equipment (PPE) nor sufficient guidance for inspection of non-
cryogenic PPE per the requirements of § 193.2801.



CPF 1-2019-5005M
Section 193.2801 states in part:
Each operator must provide and maintain fire protection at LNG plants according to
sections 9.1 through 9.7 and section 9.9 of NFPA-59A-2001 (incorporated by reference,
see § 193.2013).
Sections 9.7.1 and 9.7.3 of NFPA-59A-2001 state:
9.7.1* Protective clothing, which will provide protection against the effects of exposure to
LNG, shall be available and readily accessible at the facility.
9.7.3* Written practices and procedures shall be developed to protect employees from the
hazards of entry into confined or hazardous spaces.
During the inspection, the CT DEEP inspector reviewed TPS’s Preventive Maintenance Work
Order Cryogenic PPE Quarterly Inspection (WO P105645). WO P105645 stated in part:
“The approved storage location for personal cyrogenic (sic) PPE is either the control room
hallway or personal locker.”
However, only shared cryogenic PPE is available for use at the Plant and this shared cryogenic
PPE is never stored in personal lockers. Additionally, WO P105645 does not list specific
indications that determine when the cryogenic PPE needs to be replaced.
CT DEEP inspector reviewed TPS’s Preventive Maintenance Work Order Inventory Safety (WO
P105729). TPS stated that inspection was performed on non-cryogenic PPE as part of WO
P105729. TPS procedures did not provide for the periodic inspection of non-cryogenic PPE that
is currently in use. TPS stated they expect to add the periodic inspection of non-cryogenic PPE
into work orders.
Therefore, TPS written plans and procedures were inadequate regarding inspection and
maintenance of PPE required by NFPA-59A-2001.
2. § 193.2605 Maintenance Procedures.
…
(b) Each operator shall follow one or more manuals of written procedures for the
maintenance of each component, including any required corrosion control. The
procedure must include:
(1) The details of the inspections or tests determined under paragraph (a) of this
section and their frequency of performance;
TPS’ written procedures for the maintenance of each component were inadequate. Specifically,
TPS’s procedures failed to include sufficient guidance for inspection and testing of UV detectors
per the requirements of § 193.2619(c)(2).
Section 193.2619(c)(2) states:
120195005M_Notice of Amendment_04022019_text Page 2 of 4



CPF 1-2019-5005M
(c) Control systems in service, but not normally in operation, such as relief valves and
automatic shutdown devices, and control systems for internal shutoff valves for bottom
penetration tanks must be inspected and tested once each calendar year, not exceeding 15
months, with the following exceptions:
…
(2) Control systems that are intended for fire protection must be inspected and tested at
regular intervals not to exceed 6 months.
During the inspection, the CT DEEP inspector reviewed TPS’s Inspection and Maintenance Plan
IMP-7.3 Hazard Detection and Mitigation (IMP 7.3). IMP 7.3 did not provide adequate guidance
to perform inspections or testing of UV detectors. Additionally, work orders did not require the
inspection and testing of UV detectors in TPS’ work management system.
Therefore, TPS’s written procedures were inadequate.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 90 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that AVANGRID Networks maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, Eastern Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please refer
to CPF 1-2019-5005M and, for each document you submit, please provide a copy in electronic
format whenever possible.
120195005M_Notice of Amendment_04022019_text Page 3 of 4



CPF 1-2019-5005M
If you have any questions, please contact us at 609-771-7800.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
120195005M_Notice of Amendment_04022019_text Page 4 of 4

120195005M_Notice of  Amendment_04022019.pdf

U.S. Department
of Transportation
840 Bear Tavern Road, Suite 300
West Trenton, NJ 08628
Pipeline and
609.771.7800
Safety Administration
Hazardous Materials
NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
April 2, 2019
Anthony Marone
Senior Vice President, Gas Operations
AVANGRID Networks
Total Peaking Services
180 Marsh Hill Rd.
Orange, CT 06477
CPF 1-2019-5005M
Dear Mr. Marone:
On April 24 to April 30, 2018, an inspector from the Connecticut Department of Energy and
Environmental Protection (CI DEEP), acting as Agent for Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of
Title 49 of the United States Code inspected Total Peaking Services' (TPS) records and procedures
for its LNG plant in Bridgeport, Connecticut. TPS is a wholly-owned subsidiary of United
Resources, Inc., which was a subsidiary of UIL Holdings Corporation acquired by Avangrid.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
TPS's plans or procedures, as described below:
1.
§ 193.2017 Plans and procedures.
(a) Each operator shall maintain at each LNG plant the plans and procedures
required for that plant by this part. The plans and procedures must be available upon
request for review and inspection by the Administrator or any State Agency that has
submitted a current certification or agreement with respect to the plant under the
pipeline safety laws (49 U.S.C. 60101 et seq.). In addition, each change to the plans or
procedures must be available at the LNG plant for review and inspection within 20
days after the change is made.
TPS written plans and procedures required for each LNG plant by Part 193 were
inadequate. Specifically, TPS procedures failed to include updated guidance for inspection of
cryogenic personal protective equipment (PPE) nor sufficient guidance for inspection of non-
cryogenic PPE per the requirements of § 193.2801.



CPF 1-2019-5005M
Section 193.2801 states in part:
Each operator must provide and maintain fire protection at LNG plants according to
sections.. through 9.7 and section 9.9 of NFPA-59A-2001 (incorporated by reference,
see § 193.2013).
Sections 9.7.1 and 9.7.3 of NFPA-59A-2001 state:
9.7.1* Protective clothing, which will provide protection against the effects of exposure to
LNG, shall be available and readily accessible at the facility.
9.7.3* Written practices and procedures shall be developed to protect employees from the
hazards of entry into confined or hazardous spaces.
During the inspection, the CT DEEP inspector reviewed TPS's Preventive Maintenance Work
Order Cryogenic PPE Quarterly Inspection (WO P105645). WO P105645 stated in part:
"The approved storage location for personal cyrogenic (sic) PPE is either the control room
hallway or personal locker. "
However, only shared cryogenic PPE is available for use at the Plant and this shared cryogenic
PPE is never stored in personal lockers. Additionally, WO P105645 does not list specific
indications that determine when the cryogenic PPE needs to be replaced.
CT DEEP inspector reviewed TPS's Preventive Maintenance Work Order Inventory Safety (WO
P105729). TPS stated that inspection was performed on non-cryogenic PPE as part of WO
P105729. TPS procedures did not provide for the periodic inspection of non-cryogenic PPE that
is currently in use. TPS stated they expect to add the periodic inspection of non-cryogenic PPE
into work orders.
Therefore, TPS written plans and procedures were inadequate regarding inspection and
maintenance of PPE required by NFPA-59A-2001.
2.
§ 193.2605 Maintenance Procedures.
(b) Each operator shall follow one or more manuals of written procedures for the
•••
maintenance of each component, including any required corrosion control. The
procedure must include:
(1) The details of the inspections or tests determined under paragraph (a) of this
section and their frequency of performance;
TPS' written procedures for the maintenance of each component were inadequate. Specifically,
TPS's procedures failed to include sufficient guidance for inspection and testing of UV detectors
per the requirements of § 193.2619(c)(2).
Section 193.2619(c)(2) states:
120195005M_NOA_04022019 (157209) docx
Page 2 of 4



CPF 1-2019-5005M
(c) Control systems in service, but not normally in operation, such as relief valves and
automatic shutdown devices, and control systems for internal shutoff valves for bottom
penetration tanks must be inspected and tested once each calendar year, not exceeding 15
months, with the following exceptions:
(2) Control systems that are intended for fire protection must be inspected and tested at
regular intervals not to exceed 6 months.
During the inspection, the CT DEEP inspector reviewed TPS's Inspection and Maintenance Plan
IMP-7.3 Hazard Detection and Mitigation (IMP 7.3). IMP 7.3 did not provide adequate guidance
to perform inspections or testing of UV detectors. Additionally, work orders did not require the
inspection and testing of UV detectors in TPS work management system.
Therefore, TPS's written procedures were inadequate.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 90 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that AVANGRID Networks maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, Eastern Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please refer
to CPF 1-2019-5005M and, for each document you submit, please provide a copy in electronic
format whenever possible.
120195005M_NOA_04022019 (157209).docx
Page 3 of 4



CPF 1-2019-5005M
If you have any questions, please contact us at 609-771-7800.
Sincerely,
Put Burk
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
120195005M_NOA_04022019 (157209).docx
Page 4 of 4

120195005M_Closure Letter_07082019_text.pdf

OVERNIGHT EXPRESS DELIVERY
July 8, 2019
Anthony Marone
Senior Vice President, Gas Operations
AVANGRID Networks
Total Peaking Services
180 Marsh Hill Rd.
Orange, CT 06477
CPF 1-2019-5005M
Dear Mr. Marone:
On April 24 to April 30, 2018, an inspector from the Connecticut Department of Energy and
Environmental Protection (CT DEEP), acting as Agent for Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of
Title 49 of the United States Code inspected Total Peaking Services’ (TPS) records and procedures
for its LNG plant in Bridgeport, Connecticut. TPS is a wholly-owned subsidiary of United
Resources, Inc., which was a subsidiary of UIL Holdings Corporation acquired by Avangrid.
TPS submitted its amended procedures on May 1, 2019. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary, and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration