# SUNOCO PIPELINE L.P. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 120195006
- **title:** SUNOCO PIPELINE L.P. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-05-17
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.106(b)(1)(i), 195.440(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120195006.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120195006.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120195006
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120195006
**body:**

Notice of Probable Violation involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulations as 195.106(b)(1)(i),  195.440(c). The case was opened on 2019-05-17 and is reported as closed as of 2021-01-21. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120195006_Closure Letter_01212021.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_Closure%20Letter_01212021.pdf

120195006_Closure Letter_01212021_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_Closure%20Letter_01212021_text.pdf

120195006_Final Order_06262020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_Final%20Order_06262020.pdf

120195006_Final Order_06262020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_Final%20Order_06262020_text.pdf

120195006_NOPV PCO_05172019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_NOPV%20PCO_05172019.pdf

120195006_Operator Post-Hearing Submission_12232019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_Operator%20Post-Hearing%20Submission_12232019.pdf

120195006_Operator Pre-Hearing Submission_10282019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_Operator%20Pre-Hearing%20Submission_10282019.pdf

120195006_Operator Request for Hearing_06192019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_Operator%20Request%20for%20Hearing_06192019.pdf

120195006_PHC Hearing Scheduled_10012019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_PHC%20Hearing%20Scheduled_10012019.pdf

120195006_PHC Hearing Scheduled_10012019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120195006/120195006_PHC%20Hearing%20Scheduled_10012019_text.pdf

120195006_Closure Letter_01212021_text.pdf

OVERNIGHT EXPRESS DELIVERY
January 21, 2021
Greg McIlwain
Senior VP, Operations
Sunoco Pipeline, L.P.
1300 Main Street
Houston, TX 77002
CPF 1-2019-5006
Dear Mr. McIlwain:
On June 26, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Sunoco Pipeline, L.P. a Final Order in the above-referenced case. This Order included a
Compliance Order. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120195006_PHC Hearing Scheduled_10012019_text.pdf

October 1, 2019
VIA CERTIFIED MAIL AND EMAIL TO: catherine.little@troutman.com and
robert.burrough@dot.gov
Ms. Catherine D. Little, Esq.
Counsel for Sunoco Pipeline, LP
Troutman Sanders, LLP
600 Peachtree Street, NE, Suite 3000
Atlanta, Georgia 30308
Mr. Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, New Jersey 08628
Re: Notice of Hearing, Sunoco Pipeline, LP
CPF No. 1-2019-5006
Dear Ms. Little and Mr. Burrough:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation and Proposed Compliance Order issued to Sunoco Pipeline, LP, by the Office of
Pipeline Safety in the above-referenced matter. The hearing will take place November 7, 2019,
beginning at 8:30 a.m. Eastern Time.
The hearing will be at the PHMSA Eastern Region office, 820 Bear Tavern Road, Suite 103, West
Trenton, New Jersey 08628. Upon arrival at the building, attendees will be required to present
photo identification to security personnel. A contact phone number for the day of the hearing is
(609) 989-2171.
At least 10 calendar days prior to the hearing (or by October 28, 2019), both parties must submit
and exchange any additional written materials they intend to present at the hearing and a list of
attendees. This information should be provided electronically. Materials not submitted by this date
may be excluded. If you have any questions, please do not hesitate to call me at (202) 366-9093.
Sincerely,
Larry White
Presiding Official
cc: Mr. Gregory Mcilwain, Senior Vice President, Operations, Energy Transfer, LP, 1300 Main
Street, Houston, Texas 77002
Ms. Ajoke Agboola, Counsel, Eastern Region, Office of Pipeline Safety, PHMSA

120195006_Final Order_06262020_text.pdf

June 26, 2020
VIA ELECTRONIC MAIL TO: kelcy.warren@energytransfer.com
Mr. Kelcy L. Warren
Chairman and Chief Executive Officer
Energy Transfer, LP
8111 Westchester Drive
Dallas, Texas 75225
Re: CPF No. 1-2019-5006
Dear Mr. Warren:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws one of
the allegations of violation, makes a finding of violation, and specifies actions that need to be
taken by your subsidiary, Sunoco Pipeline, LP, to comply with the pipeline safety regulations.
When the terms of the compliance order have been completed, as determined by the Director,
Eastern Region, this enforcement action will be closed. Service of the Final Order by electronic
mail is effective upon the date of transmission as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Robert Burrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA
Mr. Greg McIlwain, Senior Vice President – Operations, Energy Transfer Partners, LP,
gregory.mcilwain@energytransfer.com
Ms. Catherine D. Little, Esq., Troutman Sanders, LLP, catherine.little@troutman.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of )
Sunoco Pipeline, LP, ) CPF No. 1-2019-5006
a subsidiary of Energy Transfer, LP, )
Respondent. )
)
)
)
)
FINAL ORDER
On various dates from August through November, 2018, pursuant to 49 U.S.C. § 60117, a
representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office
of Pipeline Safety (OPS), conducted an on-site pipeline safety inspection of the facilities and
records of Sunoco Pipeline, LP (Sunoco or Respondent) for the GRE Flow
Reversal/Repurposing Project on the Mariner East 2 pipeline system located in Pennsylvania (the
GRE Project). Sunoco Pipeline, LP operates approximately 5,851 miles of hazardous liquid
pipelines and other assets in 11 states and is a subsidiary of Energy Transfer, LP.1
As a result of the inspection, the Director, Eastern Region, OPS (Director), issued to Respondent,
by letter dated May 17, 2019, a Notice of Probable Violation and Proposed Compliance Order
(Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that Sunoco had
committed two violations of 49 C.F.R. Part 195 and proposed ordering Respondent to take
certain measures to correct the alleged violations.
Sunoco responded to the Notice by letter dated June 20, 2019 (Response). In its Response,
Sunoco contested the allegations and requested a hearing. A hearing was subsequently held on
November 7, 2019, in West Trenton, New Jersey before a PHMSA Presiding Official. At the
hearing, Respondent was represented by counsel. Respondent provided additional written
material prior to the hearing on October 28, 2019 (Pre-hearing submission), and following the
hearing on December 28, 2019 (Post-hearing submission). The Director submitted a
recommendation on January 21, 2020 (Recommendation).2
1 Pipeline Safety Violation Report (Violation Report), (May 21, 2019) (on file with PHMSA), at 1; Energy Transfer
website, available at https://www.energytransfer.com/ownership-structure (last accessed June 16, 2020).
2 Respondent submitted a reply to the Director’s recommendation on February 10, 2020, to which OPS submitted
an objection on February 18, 2020. Because the record in this proceeding was closed by this time and no request to
submit these items was made or granted, these submissions were disregarded.



CPF No. 1-2019-5006
Page2
FINDING OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.106(b), which states:
§ 195.106 Internal design pressure.
(a) …
(b) The yield strength to be used in determining the internal design
pressure under paragraph (a) of this section is the specified minimum yield
strength. If the specified minimum yield strength is not known, the yield
strength to be used in the design formula is one of the following:
(1)(i) The yield strength determined by performing all of the tensile tests
of ANSI/API Spec 5L (incorporated by reference, see §195.3) on randomly
selected specimens with the following number of tests:
Pipe size No. of tests
Less than 65∕8 in (168 mm) nominal
outside diameter.
One test for each 200 lengths.
65∕8 in through 123∕4 in (168 mm
through 324 mm) nominal outside
diameter.
One test for each 100 lengths.
Larger than 123∕4 in (324 mm)
nominal outside diameter.
One test for each 50 lengths.
The Notice alleged that Respondent violated 49 C.F.R. § 195.106(b) by failing to conduct
sufficient random tensile tests to determine the internal design pressure of certain pipeline
segments undergoing a change in maximum operating pressure (MOP) where the specified
minimum yield strength (SMYS) was not known. Specifically, the Notice alleged that the
SMYS was not known because the historical records Respondent used to establish that the 12-
inch pipe was Grade B pipe having a SMYS of 35,000 should have been supplemented with
additional historical records that validated these records.
In its Response and at the hearing, Sunoco strongly disagreed with OPS and stated that the
allegation should be withdrawn. Respondent explained that the pipe grade and SMYS was
known by Respondent from records it inherited from a predecessor company. These records
included an August 1969 system map prepared by Atlantic Pipe Line Corporation; a December
1967 Atlantic Pipe Data Sheet; and a 1989 Line Testing Committee Report from Sun Pipe Line
Company, a subsequent owner of the GRE Segment.3 All of these records indicated that the
GRE Segment is Grade B seamless pipe.
OPS maintained that the records provided by Respondent were insufficiently validated for the
pipe grade and SMYS to be considered “known” by Respondent and pointed out that the original
1937 manufacturing records did not include mill test reports. In the Notice, OPS quoted
3 Prehearing submission, Exhibits 6-8.



CPF No. 1-2019-5006
Page3
extensively from two advisory bulletins published by OPS concerning verification of records.4
Citing Advisory Bulletin ADB-2014-04, the Notice stated that operators should validate material
and strength test records for all affected segments of pipe as reminded in Advisory Bulletin
ADB-12-06 which stated, “If the operator is missing records, they should create and implement a
plan to obtain material documentation. If mechanical and/or chemical properties (mill test
reports) are missing, the plan should require destructive tests to confirm material properties of
[the] pipeline. Certain high-risk pipelines merit a greater level of due diligence.”5
The issue to be determined in this case is whether the records produced by Respondent were
sufficient to draw the conclusion that the pipe grade and SMYS were “known.” As Sunoco
noted, the term “known” is not defined in the Part 195 regulations. In interpreting undefined
regulatory terms, we look to the common dictionary definition. Merriam-Webster’s dictionary
defines “known” to mean “generally recognized.”6 Respondent produced an August 1969
system map prepared by Atlantic Pipe Line Corporation; a December 1967 Atlantic Pipe Data
Sheet; and a 1989 Line Testing Committee Report from Sun Pipe Line Company, a subsequent
owner of the GRE Segment.7 All of these records indicated that the GRE Segment is Grade B
seamless pipe. Sunoco provided copies of these records and OPS did not question their
authenticity. In addition, Respondent’s Senior Manager of Pipeline Integrity testified at the
hearing that the pipeline had been documented, maintained, and treated as Grade B pipe.8
Respondent maintained that the grade and SMYS of the pipeline in question was actually
“known” in the context of 49 C.F.R. § 195.106(b).9
Having considered these arguments, the preponderance of the evidence shows that Respondent
had adequately documented that the segment of pipe in question was Grade B with a SMYS of
35,000 psi. The Region’s justification for demanding that the operator perform additional,
random tensile testing was neither necessary nor reasonable in light of the operator’s production
of adequate documentation demonstrating its knowledge and confidence about the internal
design pressure specifications for the pipeline segments at issue in this case. Based upon the
foregoing, I hereby order that Item 1 of the Notice be withdrawn.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.440(c), which states:
§ 195.440 Public awareness.
(a) …
(c) The operator must follow the general program recommendations,
4 Notice, at 3.
5 77 FR 26822 (May 7, 2012). Advisory bulletins are a form of guidance and are not enforceable.
6 See https://www.merriam- webster.com/dictionary/known.
7 Prehearing submission, Exhibits 6-8.
8 Hearing transcript, at 29.
9 It is also notable that when tensile testing was voluntarily conducted on the 12-inch piping, the results for the
actual yield strength ended up being consistent with Respondent’s understanding from its records that the pipe was
Grade B with specified 35,000 psi yield strength, and the MOP of the pipeline was never out of compliance with the
Part 195 regulations.



CPF No. 1-2019-5006
Page4
including baseline and supplemental requirements of API RP 1162, unless
the operator provides justification in its program or procedural manual as to
why compliance with all or certain provisions of the recommended practice
is not practicable and not necessary for safety.
The Notice alleged that Respondent violated 49 C.F.R. § 195.440(c) by failing to follow the
public awareness program requirements of API RP 1162.10 Specifically, the Notice alleged that
Respondent failed to tailor its communications coverage area to fit its particular pipeline,
location, and potential impact consequences.
Following the hearing, Sunoco stated that it was no longer contesting this allegation.
Accordingly, after considering all of the evidence and the legal issues presented, I find
that Respondent violated 49 C.F.R. § 195.440(c) by failing to follow the public awareness
program requirements of API RP 1162.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1 and 2 in the Notice for alleged
violations of 49 C.F.R. §§ 195.106(b), and 195.440(c), respectively. Under 49 U.S.C.
§ 60118(a), each person who engages in the transportation of hazardous liquids or who owns or
operates a pipeline facility is required to comply with the applicable safety standards established
under chapter 601. With regard to the alleged violation of § 195.106(b) (Item 1), as discussed
above, this allegation has been withdrawn. Therefore, the compliance terms proposed in the
Notice for Item 1 are also withdrawn.
As for the remaining compliance terms regarding the violation of § 195.440(c) (Item 2), pursuant
to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take
the following actions to ensure compliance with the pipeline safety regulations applicable to its
operations:
1. With respect to the violation of § 195.440(c) (Item 2), within 60 days of receipt of
this Final Order, Respondent must:
a. Modify its Public Awareness Plan (PAP) applicable to the new ME2 pipeline,
including any temporary reversal and repurposed portions of the existing 12-
inch PTBR to MNTL pipeline and any components of the new 16-inch ME2X
pipeline which will be utilized to facilitate transportation of HVLs. Sunoco
shall expand its communication coverage area for Stakeholder Audience
Identification, as defined by API RP 1162, consistent with areas of potential
impact for their pipeline facilities. Sunoco shall also update its PAP to reflect
communication buffer area(s) and information on how buffer(s) were
determined and/or rational for selection.
10 API RP 1162 is incorporated by reference in Part 195, see § 195.3.



CPF No. 1-2019-5006
Page5
b. Should the modification be deemed unwarranted, Sunoco shall provide
justification in its program or procedural manual as to why compliance with
all or certain provisions of the recommended practice is not practicable and
not necessary for safety, specifically, education of Stakeholder Audiences that
were determined to be susceptible to product dispersion and/or thermal
radiation impact.
c. PAP modifications and/or justifications required under Item 2 shall be
submitted to the PHMSA Director of the Eastern Region for evaluation and
approval.
d. Submit documentation demonstrating compliance with each of the items
outlined in this Compliance Order to Robert Burrough, Director, Eastern
Region, PHMSA, 840 Bear Tavern Road, Suite 103, West Trenton, New
Jersey 08628.
It is requested (not mandated) that Respondent maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit the total to the
Director. It is requested that these costs be reported in two categories: (1) total cost associated
with preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated
with replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of this
Final Order by Respondent. Any petition submitted must contain a statement of the issue(s) and
meet all other requirements of 49 C.F.R. § 190.243. The terms of the order, including corrective
action, remain in effect unless the Associate Administrator, upon request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
June 26, 2020
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety