# DELAWARE STORAGE AND PIPELINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 120196007M
- **title:** DELAWARE STORAGE AND PIPELINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-05-06
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120196007m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120196007m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120196007m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120196007M
**body:**

Notice of Amendment involving DELAWARE STORAGE AND PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 195.402(c)(3). The case was opened on 2019-05-06 and is reported as closed as of 2019-07-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120196007M_Closure Letter_07112019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120196007M/120196007M_Closure%20Letter_07112019.pdf

120196007M_Closure Letter_07112019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120196007M/120196007M_Closure%20Letter_07112019_text.pdf

120196007M_Notice of Amendment_05062019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120196007M/120196007M_Notice%20of%20Amendment_05062019.pdf

120196007M_Notice of Amendment_05062019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120196007M/120196007M_Notice%20of%20Amendment_05062019_text.pdf

120196007M_Operator Response to Notice_05162019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120196007M/120196007M_Operator%20Response%20to%20Notice_05162019.pdf

120196007M_Notice of Amendment_05062019_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
May 6, 2019
Charles Denault
President
Delaware Storage and Pipeline Company
400 Amherst Street, Suite 202
Nashua, NH 03063
CPF 1-2019-6007M
Dear Mr. Denault:
From August 7 - August 11, 2017, representatives from the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
performed an inspection of Delaware Storage and Pipeline Company’s (Delaware SPC) Dover
AFB Pipeline system located in Delaware.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
Delaware SPC’s plans or procedures, as described below:
1. § 195.402 Procedure manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
Delaware SPC’s procedures for normal operations and maintenance were
inadequate. Specifically, Delaware SPC’s corrosion control procedures did not include a
requirement that supervisors maintain a thorough knowledge of the corrosion control procedures



CPF 1-2019-6007M
for which they are responsible for insuring compliance, or a process for verifying such knowledge,
as required by § 195.555.
Section 195.555 states:
You must require and verify that supervisors maintain a thorough
knowledge of that portion of the corrosion control procedures
established under § 195.402(c)(3) for which they are responsible for
insuring compliance.
During the inspection, Delaware SPC’s operations and maintenance procedures were reviewed,
and determined to not contain any provisions for complying with § 195.555.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 60 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Delaware Storage and Pipeline Company maintain
documentation of the safety improvement costs associated with fulfilling this Notice of
Amendment (preparation/revision of plans, procedures) and submit the total to Robert Burrough,
Director, PHMSA Eastern Region, 840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628.
Please refer to CPF 1-2019-6007M on each document you submit, and whenever possible provide
a signed PDF copy in electronic format. Smaller files may be emailed to robert.burrough@dot.gov.
Larger files should be sent on USB flash drive accompanied by the original paper copy to the
Eastern Region Office.
120196007M_Notice of Amendment_05062019_text Page 2 of 3



CPF 1-2019-6007M
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosures: Response Options for Pipeline Operators in Compliance Proceedings
120196007M_Notice of Amendment_05062019_text Page 3 of 3

120196007M_Closure Letter_07112019_text.pdf

OVERNIGHT EXPRESS DELIVERY
July 11, 2019
Mr. Charles Denault
President
Delaware Storage and Pipeline Co.
400 Amherst Street, Suite 405
Nashua, NH 03063
CPF 1-2019-6007M
Dear Mr. Denault:
From August 7 - August 11, 2017, representatives from the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
performed an inspection of Delaware Storage and Pipeline Company’s (Delaware SPC) Dover
AFB Pipeline system located in Delaware.
As a result of the inspection, Delaware SPC was issued a Notice of Amendment on May 6, 2019,
which proposed amendment of your procedures.
Delaware SPC submitted its amended procedures on May 16, 2019. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary, and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false