# SOUTHERN CALIFORNIA GAS CO — Warning Letter

- **operation:** document
- **citation:** CPF 120200004W
- **title:** SOUTHERN CALIFORNIA GAS CO — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-05-28
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.12(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120200004w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120200004w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120200004w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120200004W
**body:**

Warning Letter involving SOUTHERN CALIFORNIA GAS CO. PHMSA's enforcement data identifies the cited regulation as 192.12(d). The case was opened on 2020-05-28 and is reported as closed as of 2020-05-28. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120200004W_Operator Response to Notice_07072020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120200004W/120200004W_Operator%20Response%20to%20Notice_07072020.pdf

120200004W_Warning Letter_05282020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120200004W/120200004W_Warning%20Letter_05282020.pdf

120200004W_Warning Letter_05282020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120200004W/120200004W_Warning%20Letter_05282020_text.pdf

120200004W_Warning Letter_05282020_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
May 28, 2020
Ms. Debra Reed
President & CEO
Southern California Gas Company
555 West Fifth Street
Los Angeles, CA 90013
CPF 1-2020-0004W
Dear Ms. Reed:
From October 29 – November 1, 2019, inspectors from the California Geologic Energy
Management Division (CalGEM), acting as an Agent for the Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49
United States Code (U.S.C.) inspected Southern California Gas Company (SCG)’s underground
natural gas storage program and records for the Aliso Canyon (AC), Honor Rancho (HR) and Playa
Del Rey (PDR) storage fields in Los Angeles County, California.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. § 192.12 Underground natural gas storage facilities.
(a) ….
(d) Each underground natural gas storage facility that uses a
depleted hydrocarbon reservoir or an aquifer reservoir for gas storage,
including those constructed not later than July 18, 2017 must meet the
operations, maintenance, integrity demonstration and verification,
monitoring, threat and hazard identification, assessment, remediation,
site security, emergency response and preparedness, and
recordkeeping requirements and recommendations of API RP 1171,
sections 8, 9, 10, and 11 (incorporated by reference, see §192.7) by



CPF 1-2020-0004W
January 18, 2018.1
SCG failed to meet the applicable requirements and recommendations of API RP 1171, Section 8.
Specifically, SCG’s records did not show that plugged and abandoned third party wells were
included in its assessments in accordance with API RP 1171, Section 8.3.2 Data Sources (Section
8.3.2).
Section 8.3.2 states in part:
The operator shall use available information such as performance data collected
through the field history, operations and maintenance (O&M) activities, geotechnical
data such as well logs, engineering data, and completion reports to determine
susceptibility to threat and hazard-related events and to assess threat and hazard
interaction.
At the time of the inspection, SCG’s records did not address plugged and abandoned third-party
wells. Therefore, SCG failed to meet the requirements of Section 8.3.2.
2. § 192.12 Underground natural gas storage facilities.
(a) …
(d) Each underground natural gas storage facility that uses a
depleted hydrocarbon reservoir or an aquifer reservoir for gas storage,
including those constructed not later than July 18, 2017 must meet the
operations, maintenance, integrity demonstration and verification,
monitoring, threat and hazard identification, assessment, remediation,
site security, emergency response and preparedness, and
recordkeeping requirements and recommendations of API RP 1171,
sections 8, 9, 10, and 11 (incorporated by reference, see §192.7) by
January 18, 2018.
SCG failed to meet the applicable requirements and recommendations of API RP
1171, Section 9. Specifically, SCG’s records did not demonstrate that site specific
characteristics of the reservoir and wells were all accounted for as required by API
RP 1171, Section 9.2.1, Integrity Maintenance (Section 9.2.1).
Section 9.2.1 states in part:
The operator shall maintain functional integrity of storage wells and reservoirs. Storage
wells and reservoirs can have different characteristics resulting in unique requirements
in approaching integrity demonstration, verification, and monitoring.
1 The final rule, Pipeline Safety: Safety of Underground Natural Gas Storage Facilities, 85 FR 8104 (February 12,
2020), revised § 192.12. The requirement cited in this Warning Letter is still present but is now codified in
§ 192.12(b)(2).
120200004W_Warning Letter_05282020_text Page 2 of 5



CPF 1-2020-0004W
SCG’s records insufficiently addressed site specific characteristics amongst the reservoir
compartments and fault blocks, along with the characteristics of wells, including construction,
integrity testing and workover histories. Those unique characteristics were insufficiently
incorporated into risk calculations, rankings and risk mitigation protocols contained within the
operator’s risk management plans (RMPs) submitted to CalGEM on April 1, 2019. Therefore, SCG
failed to meet the requirements of Section 9.2.1.
3. § 192.12 Underground natural gas storage facilities.
(a) ….
(d) Each underground natural gas storage facility that uses a
depleted hydrocarbon reservoir or an aquifer reservoir for gas storage,
including those constructed not later than July 18, 2017 must meet the
operations, maintenance, integrity demonstration and verification,
monitoring, threat and hazard identification, assessment, remediation,
site security, emergency response and preparedness, and
recordkeeping requirements and recommendations of API RP 1171,
sections 8, 9, 10, and 11 (incorporated by reference, see § 192.7) by
January 18, 2018.
SCG failed to meet the applicable requirements and recommendations of API RP 1171, Section 9.
Specifically, SCG failed to request third-party well integrity evaluation data, as required by API
RP 1171, Section 9.3.1 Well Integrity Evaluation (Section 9.3.1).
Section 9.3.1 states in part:
The operator shall evaluate the mechanical integrity of each active well, including each
third-party well, that penetrates the storage reservoir and buffer zone or areas
influenced by storage operations.
Well integrity evaluation methods typically used by operators include but are not
limited to review of design, completion, and well work records, wellhead and downhole
inspection, well pressure monitoring and testing, and gas sampling.
The operator shall request well integrity evaluation data from third-party well
owner/operators following the frequency established using conclusions from the risk
assessment.
Active well mechanical integrity evaluations shall include initial and subsequent
evaluations as determined using the risk assessment and the information derived from
the initial evaluation
During the inspection, SCG was asked to provide records showing that they had requested third-
party well integrity information. SCG could not provide any records documenting that they
requested this information. Therefore, SCG failed to meet the requirements of Section 9.3.1.
4. § 192.12 Underground natural gas storage facilities.
(a) …
120200004W_Warning Letter_05282020_text Page 3 of 5



CPF 1-2020-0004W
(d) Each underground natural gas storage facility that uses a
depleted hydrocarbon reservoir or an aquifer reservoir for gas storage,
including those constructed not later than July 18, 2017 must meet the
operations, maintenance, integrity demonstration and verification,
monitoring, threat and hazard identification, assessment, remediation,
site security, emergency response and preparedness, and
recordkeeping requirements and recommendations of API RP 1171,
sections 8, 9, 10, and 11 (incorporated by reference, see §192.7) by
January 18, 2018.
SCG failed to meet the applicable requirements and recommendations of API RP 1171, Section 9.
Specifically, SCG failed to demonstrate that it evaluated each occurrence of annular gas that
exceeded operator defined threshold levels in accordance with API RP 1171, Section 9.3.2, Well
Integrity Monitoring (Section 9.3.2).
Section 9.3.2 states in part:
The operator shall evaluate each annular gas occurrence that exceeds operator- or
regulatory-defined threshold levels determined from well integrity evaluation and from
risk assessment.
During the inspection, SCG was unable to provide documentation of the evaluation of each
occurrence of annular gas that exceeded operator-defined threshold levels. Therefore, SCG failed
to meet the requirements of Section 9.3.2.
5. § 192.12 Underground natural gas storage facilities.
(a) …
(d) Each underground natural gas storage facility that uses a
depleted hydrocarbon reservoir or an aquifer reservoir for gas storage,
including those constructed not later than July 18, 2017 must meet the
operations, maintenance, integrity demonstration and verification,
monitoring, threat and hazard identification, assessment, remediation,
site security, emergency response and preparedness, and
recordkeeping requirements and recommendations of API RP 1171,
sections 8, 9, 10, and 11 (incorporated by reference, see §192.7) by
January 18, 2018.
SCG failed to meet the applicable requirements and recommendations of API RP 1171, Section 9.
Specifically, SCG failed to document the notable corrosion on the WEZU C2A wellhead during
its monthly inspections conducted in accordance with API RP 1171, Section 9.3.2.
Section 9.3.2 states in part, “The operator shall visually inspect each wellhead assembly at least
annually for leaks.”
During the field inspection, CalGEM observed and photographed significant corrosion on a valve
flange on well WEZU C2A. CalGEM also established that SCG performs monthly visual wellhead
120200004W_Warning Letter_05282020_text Page 4 of 5



CPF 1-2020-0004W
inspections. However, SCG’s monthly inspection records for well WEZU C2A did not note the
presence of corrosion, nor did they provide comments on evaluating the origin of the corrosion or
the potential for a leaking valve flange.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for a related
series of violations. For violation occurring on or after November 27, 2018 and before July 31,
2019, the maximum penalty may not exceed $213,268 per violation per day, with a maximum
penalty not to exceed $2,132,679. For violation occurring on or after November 2, 2015 and before
November 27, 2018, the maximum penalty may not exceed $209,002 per violation per day, with a
maximum penalty not to exceed $2,090,022. For violations occurring prior to November 2, 2015,
the maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations.
Be advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must
provide a second copy of the document with the portions you believe qualify for confidential
treatment redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. 552(b). We have reviewed the circumstances and supporting
documents involved in this case, and have decided not to conduct additional enforcement action
or penalty assessment proceedings at this time. We advise you to correct the item(s) identified in
this letter. Failure to do so will result in SCG being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, please submit all correspondence in this
matter to Robert Burrough, Director, PHMSA Eastern Region, 840 Bear Tavern Road, Suite 300,
West Trenton, NJ 08628. Please refer to CPF 1-2020-0004W on each document you submit, and
whenever possible provide a signed PDF copy in electronic format. Smaller files may be emailed
to robert.burrough@dot.gov. Larger files should be sent on USB flash drive accompanied by the
original paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
CC: Troy Bauer, Pipeline Safety & Compliance Manager, Southern California Gas Company
(via email)
120200004W_Warning Letter_05282020_text Page 5 of 5
- **truncated:** false
- **body characters:** 12635