# ERGON TERMINALING, INC. — Notice of Amendment

- **operation:** document
- **citation:** CPF 12020012NOA
- **title:** ERGON TERMINALING, INC. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-09-17
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12020012noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12020012noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12020012noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12020012NOA
**body:**

Notice of Amendment involving ERGON TERMINALING, INC.. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(3). The case was opened on 2020-09-17 and is reported as closed as of 2020-11-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12020012NOA_Closure Letter_11122020_(20-171844).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12020012NOA/12020012NOA_Closure%20Letter_11122020_(20-171844).pdf

12020012NOA_Closure Letter_11122020_(20-171844)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12020012NOA/12020012NOA_Closure%20Letter_11122020_(20-171844)_text.pdf

12020012NOA_Notice of Amendment_09172020_(20-171844).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12020012NOA/12020012NOA_Notice%20of%20Amendment_09172020_(20-171844).pdf

12020012NOA_Notice of Amendment_09172020_(20-171844)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12020012NOA/12020012NOA_Notice%20of%20Amendment_09172020_(20-171844)_text.pdf

12020012NOA_Operator Response to Notice_10052020_(20-171844).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12020012NOA/12020012NOA_Operator%20Response%20to%20Notice_10052020_(20-171844).pdf

12020012NOA_Closure Letter_11122020_(20-171844)_text.pdf

OVERNIGHT EXPRESS DELIVERY
November 12, 2020
Mr. Jimmy Clunan
Vice President
Ergon Terminaling, Inc.
P.O. Box 1639
Jackson, MS 39215
CPF 1-2020-012-NOA
Dear Mr. Clunan:
From February 26, 2020 to June 19, 2020, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
conducted a virtual pipeline safety inspection of Ergon Terminaling, Inc. (Ergon) procedures. As
a result of the inspection, Ergon was issued a Notice of Amendment on September 17, 2020, which
proposed amendment of your procedures.
Ergon submitted its amended procedures on October 5, 2020. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

12020012NOA_Notice of Amendment_09172020_(20-171844)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
September 17, 2020
Jimmy Clunan
Vice President
Ergon Terminaling, Inc.
P.O. Box 1639
Jackson, MS 39215
CPF 1-2020-012-NOA
Dear Mr. Clunan:
From February 26, 2020 to June 19, 2020, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected Ergon Terminaling, Inc’s (Ergon) procedures for its pipeline system in
Magnolia, Ohio.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Ergon’s plans or procedures, as described below:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each
pipeline system a manual of written procedures for conducting normal
operations and maintenance activities and handling abnormal
operations and emergencies. This manual shall be reviewed at intervals
not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is
effective. This manual shall be prepared before initial operations of a
pipeline system commence, and appropriate parts shall be kept at
locations where operations and maintenance activities are conducted.
Ergon’s written procedures were inadequate. Specifically, Ergon’s Operations and Maintenance
Manual, Magnolia Pipeline, dated January 2015 (O&M), failed to include a process for notifying
PHMSA of changes in accordance with § 195.64(c).



CPF 1-2020-012-NOA
During the inspection, the PHMSA inspector requested Ergon’s procedures addressing
§ 195.64(c)1. Ergon presented its O&M, which lacked a process for making notifications to
PHMSA regarding certain events as described in the regulation. When the PHMSA inspector
requested if there were additional procedures or guidance, Ergon stated there was no further
guidance.
Therefore, Ergon failed to include a process in its procedures for reporting changes to PHMSA in
accordance with § 195.64(c). Ergon must revise its procedures to include a process for making
the required notifications.
2. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) …
(c) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following
to provide safety during maintenance and normal operations:
(1) …
(3) Operating, maintaining, and repairing the pipeline system in
accordance with each of the requirements of this subpart and subpart
H of this part.
Ergon’s procedures were inadequate. Specifically, Ergon’s Integrity Management Plan, revision
B, dated July 17, 2017 (IM Plan), failed to define what records must be maintained for the useful
life of the pipeline in accordance with § 195.452(l)(1).
Section 195.452(l)(1) states:
(l) What records must an operator keep to demonstrate compliance?
(1) An operator must maintain, for the useful life of the pipeline, records that
demonstrate compliance with the requirements of this subpart. At a minimum, an
operator must maintain the following records for review during an inspection:
(i) A written integrity management program in accordance with paragraph (b)
of this section.
(ii) Documents to support the decisions and analyses, including any
modifications, justifications, deviations and determinations made, variances, and
actions taken, to implement and evaluate each element of the integrity management
program listed in paragraph (f) of this section.
During the inspection, the PHMSA inspector requested Ergon’s procedures regarding record
retention in accordance with the above requirement. Ergon presented its IM Plan, which lacked
details addressing what records are required to be maintained for the useful life of the pipeline.
When the PHMSA inspector requested if there were additional procedures or guidance related to
these requirements, Ergon stated there was no further guidance.
Therefore, Ergon’s procedures were inadequate regarding the requirements of § 195.452(l)(1).
Ergon must revise its IM Plan to address this inadequacy.
12020012NOA_Notice of Amendment_09172020_(20-171844)_text Page 2 of 5



CPF 1-2020-012-NOA
3. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) …
(c) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following
to provide safety during maintenance and normal operations:
(1) …
(3) Operating, maintaining, and repairing the pipeline system in
accordance with each of the requirements of this subpart and subpart
H of this part.
Ergon’s procedures were inadequate. Specifically, Ergon’s IM Plan failed to include a process for
the evaluation of leak detection capabilities and modifying as necessary in accordance with
§ 195.452(i)(3).
Section 195.452(i)(3) states:
(i) What preventive and mitigative measures must an operator take to protect
the high consequence area?
…
(3) Leak detection. An operator must have a means to detect leaks on its pipeline
system. An operator must evaluate the capability of its leak detection means and
modify, as necessary, to protect the high consequence area. An operator's
evaluation must, at least, consider, the following factors—length and size of the
pipeline, type of product carried, the pipeline's proximity to the high consequence
area, the swiftness of leak detection, location of nearest response personnel, leak
history, and risk assessment results.
During the inspection, the PHMSA inspector requested Ergon’s procedures regarding a process
for leak detection capability evaluation. Ergon presented its IM Plan, which failed to include
procedures addressing how Ergon evaluates its leak detection capabilities. The IM Plan’s only
mention of leak detection capability evaluation was a reference to a Leak Detection System
Capability Checklist in Appendix G. When the PHMSA inspector requested to review this
documentation in Appendix G, it was not available. The PHMSA inspector received Appendix G
one week after the inspection; however, the Leak Detection System Capability Checklist was not
included.
Therefore, Ergon’s procedures were inadequate regarding preventative and mitigative measures
related to leak detection and the requirements of § 195.452(i)(3). Ergon must revise its IM Plan
to address this inadequacy.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
12020012NOA_Notice of Amendment_09172020_(20-171844)_text Page 3 of 5



CPF 1-2020-012-NOA
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Ergon Terminaling, Inc. maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, PHMSA Eastern Region,
840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. Please refer to CPF 1-2020-012-NOA
on each document you submit, and whenever possible provide a signed PDF copy in electronic
format. Smaller files may be emailed to robert.burrough@dot.gov. Larger files should be sent on
USB flash drive accompanied by the original paper copy to the Eastern Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
12020012NOA_Notice of Amendment_09172020_(20-171844)_text Page 4 of 5



CPF 1-2020-012-NOA
1 Section 195.64(c) states:
(a) …
(c) Changes. Each operator must notify PHMSA electronically through the National Registry of Operators at
https://portal.phmsa.dot.gov, of certain events.
(1) An operator must notify PHMSA of any of the following events not later than 60 days before the event
occurs:
(i) Construction or any planned rehabilitation, replacement, modification, upgrade, uprate, or update of a
facility, other than a section of line pipe, that costs $10 million or more. If 60 day notice is not feasible because of an
emergency, an operator must notify PHMSA as soon as practicable;
(ii) Construction of 10 or more miles of a new or replacement hazardous liquid or carbon dioxide pipeline;
(iii) Reversal of product flow direction when the reversal is expected to last more than 30 days. This
notification is not required for pipeline systems already designed for bi-directional flow; or
(iv) A pipeline converted for service under § 195.5, or a change in commodity as reported on the annual report
as required by § 195.49.
(2) An operator must notify PHMSA of any following event not later than 60 days after the event occurs:
(i) A change in the primary entity responsible (i.e., with an assigned OPID) for managing or administering a
safety program required by this part covering pipeline facilities operated under multiple OPIDs.
(ii) A change in the name of the operator;
(iii) A change in the entity (e.g., company, municipality) responsible for operating an existing pipeline,
pipeline segment, or pipeline facility;
(iv) The acquisition or divestiture of 50 or more miles of pipeline or pipeline system subject to this part; or
(v) The acquisition or divestiture of an existing pipeline facility subject to this part.
12020012NOA_Notice of Amendment_09172020_(20-171844)_text Page 5 of 5
- **truncated:** false
- **body characters:** 13545