# NGO TRANSMISSION, INC. — Notice of Amendment

- **operation:** document
- **citation:** CPF 120201016M
- **title:** NGO TRANSMISSION, INC. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-04-30
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.12(e).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120201016m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120201016m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120201016m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120201016M
**body:**

Notice of Amendment involving NGO TRANSMISSION, INC.. PHMSA's enforcement data identifies the cited regulation as 192.12(e). The case was opened on 2020-04-30 and is reported as closed as of 2021-03-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120201016M_Closure Letter_03112021.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201016M/120201016M_Closure%20Letter_03112021.pdf

120201016M_Closure Letter_03112021_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201016M/120201016M_Closure%20Letter_03112021_text.pdf

120201016M_Notice of Amendment_04302020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201016M/120201016M_Notice%20of%20Amendment_04302020.pdf

120201016M_Notice of Amendment_04302020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201016M/120201016M_Notice%20of%20Amendment_04302020_text.pdf

120201016M_Operator Response to Notice_08062020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201016M/120201016M_Operator%20Response%20to%20Notice_08062020.pdf

120201016M_Notice of Amendment_04302020_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
April 30, 2020
Mr. Dan McVey
Chief Operating Officer
NGO Transmission, Inc.
1500 Granville Road
Newark, OH 43058-4970
CPF 1-2020-1016M
Dear Mr. McVey:
From October 8 - 10, 2019, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected
NGO Transmission, Inc. (NGO)’s procedures for Underground Natural Gas Storage (UNGS) in
Hebron, Ohio.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
NGO’s plans or procedures, as described below:
1. § 192.12 Underground natural gas storage facilities.
(a) …
(e) Operators of underground gas storage facilities must establish
and follow written procedures for operations, maintenance, and
emergencies implementing the requirements of API RP 1170 and API
RP 1171, as required under this section, including the effective dates as
applicable, and incorporate such procedures into their written
procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.1
NGO’s written procedures for implementing the requirements of API RP 1171 were inadequate.
Specifically, NGO’s Storage Risk Management Plan (SRMP) did not require a periodic review of
the risk assessment to update information and evaluate risk management effectiveness in
accordance with API RP 1171, Section 8.5.2 Methodology (Section 8.5.2).
1 The final rule, Pipeline Safety: Safety of Underground Natural Gas Storage Facilities, 85 FR 8104 (February 12,
2020), revised § 192.12. The requirement cited in this Notice of Amendment is still present but is now codified in
§ 192.12(c).



CPF 1-2020-1016M
Section 8.5.2 states in part:
The operator shall assess risk related to the storage operation using a consistent process.
The operator should determine the risk assessment method applicable for the facilities. A
risk assessment method should include the following characteristics in the risk assessment
protocol:
(a) …
(f) regular, periodic risk assessment reviews to update information and evaluate risk
management effectiveness.
At the time of the inspection, NGO’s SRMP did not define a regular frequency for performing
reviews of risk assessment results in accordance with Section 8.5.2.
2. § 192.12 Underground natural gas storage facilities.
(a) …
(e) Operators of underground gas storage facilities must establish
and follow written procedures for operations, maintenance, and
emergencies implementing the requirements of API RP 1170 and API
RP 1171, as required under this section, including the effective dates as
applicable, and incorporate such procedures into their written
procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
NGO’s written procedures for implementing the requirements of API RP 1171 were inadequate.
Specifically, NGO’s SRMP did not describe how preventive and mitigative (P&M) measures were
identified and implemented, in accordance with API RP 1171, Section 8.6.2 Methodology (Section
8.6.2).
Section 8.6.2 states in part:
The operator shall develop P&M measures to manage risks.
At the time of the inspection, NGO’s written procedures failed to address how P&M measures
were determined to manage risk, based on site-specific conditions, in accordance with Section
8.6.2.
3. § 192.12 Underground natural gas storage facilities.
(a) …
(e) Operators of underground gas storage facilities must establish
and follow written procedures for operations, maintenance, and
emergencies implementing the requirements of API RP 1170 and API
RP 1171, as required under this section, including the effective dates as
applicable, and incorporate such procedures into their written
procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
120201016M_Notice of Amendment_04302020_text Page 2 of 5



CPF 1-2020-1016M
NGO’s written procedures for implementing the requirements of API RP 1171 were inadequate.
Specifically, NGO’s SRMP requirements did not adequately account for site specific
characteristics for each reservoir and well, in accordance with API RP 1171, Section 9.2.1 Integrity
Maintenance (Section 9.2.1).
Section 9.2.1 states:
The operator shall maintain functional integrity of storage wells and reservoirs. Storage
wells and reservoirs can have different characteristics resulting in unique requirements in
approaching integrity demonstration, verification, and monitoring.
During the inspection, it was established that Muskie storage field has 5 injection/withdrawal wells
and 4 constant withdrawal-only wells that do not cycle with the field. These site-specific
characteristics were not accounted for in the integrity monitoring program and may warrant unique
requirements in approaching integrity demonstration, verification, and monitoring per section
9.2.1.
4. § 192.12 Underground natural gas storage facilities.
(a) …
(e) Operators of underground gas storage facilities must establish
and follow written procedures for operations, maintenance, and
emergencies implementing the requirements of API RP 1170 and API
RP 1171, as required under this section, including the effective dates as
applicable, and incorporate such procedures into their written
procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
NGO’s written procedures for implementing the requirements of API RP 1171 were inadequate.
Specifically, NGO’s SRMP did not use a risk-based approach for developing the integrity
demonstration, verification, and monitoring tasks, as required by API RP 1171, Section 9.2.2 Risk-
based Evaluation (Section 9.2.2).
Section 9.2.2 states in part:
Risk assessments shall be used as a basis for developing the integrity demonstration,
verification, and monitoring tasks and evaluating their frequency requirements.
At the time of the inspection, NGO’s written procedures failed to address how risk assessments fit
into the risk management plan. Risk assessments shall drive storage reservoir and well integrity
monitoring practices in accordance with Section 9.2.2.
5. § 192.12 Underground natural gas storage facilities.
(a) …
(e) Operators of underground gas storage facilities must establish
and follow written procedures for operations, maintenance, and
emergencies implementing the requirements of API RP 1170 and API
RP 1171, as required under this section, including the effective dates as
120201016M_Notice of Amendment_04302020_text Page 3 of 5



CPF 1-2020-1016M
applicable, and incorporate such procedures into their written
procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
NGO’s written procedures for implementing the requirements of API RP 1171 were inadequate.
Specifically, NGO’s SRMP did not include a process to integrate initial and subsequent well
integrity evaluations into the risk management program, as required by API RP 1171, Section 9.3.1
Well Integrity Evaluation (Section 9.3.1).
Section 9.3.1 states in part:
Active well mechanical integrity evaluations shall include initial and subsequent
evaluations as determined using the risk assessment and the information derived from the
initial evaluation.
At the time of the inspection, NGO’s SRMP did not outline procedures to utilize NGO’s integrity
evaluations within its risk management program in accordance with Section 9.3.1.
6. § 192.12 Underground natural gas storage facilities.
(a) …
(e) Operators of underground gas storage facilities must establish
and follow written procedures for operations, maintenance, and
emergencies implementing the requirements of API RP 1170 and API
RP 1171, as required under this section, including the effective dates as
applicable, and incorporate such procedures into their written
procedures for operations, maintenance, and emergencies established
pursuant to § 192.605.
NGO’s written procedures for implementing the requirements of API RP 1171 were inadequate.
Specifically, NGO’s Emergency Response Plan (ER) did not address natural disasters and third
party emergencies for site security and safety, as required by API RP 1171, Section 10.6.1
Emergency Preparedness/Emergency Response Plan (Section 10.6.1).
Section 10.6.1 states in part:
For site security and safety, the operator shall develop and implement a structured
emergency preparedness/response plan in order to address accidental releases, equipment
failures, natural disasters, and third-party emergencies.
At the time of the inspection, NGO’s ER Plan addressed general emergencies but did not
specifically address natural disasters and third-party emergencies in accordance with Section
10.6.1.
120201016M_Notice of Amendment_04302020_text Page 4 of 5



CPF 1-2020-1016M
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that NGO Transmission, Inc. maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, PHMSA Eastern Region,
840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. Please refer to CPF 1-2020-1016M
on each document you submit, and whenever possible provide a signed PDF copy in electronic
format. Smaller files may be emailed to. Larger files should be sent on USB flash drive
accompanied by the original paper copy to the Eastern Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
CC: Don Wheeler, Operations Manager, NGO Transmission, Inc. (via email)
120201016M_Notice of Amendment_04302020_text Page 5 of 5

120201016M_Closure Letter_03112021_text.pdf

OVERNIGHT EXPRESS DELIVERY
March 11, 2021
Mr. Dan McVey
Chief Operationg Officer
NGO Transmission, Inc.
1500 Granville Road
Newark, Ohio 43058-4970
CPF 1-2020-1016M
Dear Mr. McVey:
From October 8-10, 2019, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected
NGO Transmission, Inc.’s (NGO) procedures for Underground Natural Gas Storage in Hebron,
Ohio. As a result of the inspection, NGO was issued a Notice of Amendment on April 30, 2020,
which proposed amendment of your procedures.
NGO submitted its amended procedures on February 2, 2021. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 13865