# EASTERN GAS TRANSMISSION AND STORAGE, INC. — Warning Letter

- **operation:** document
- **citation:** CPF 120201020W
- **title:** EASTERN GAS TRANSMISSION AND STORAGE, INC. — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-05-28
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.631(a)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120201020w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120201020w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120201020w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120201020W
**body:**

Warning Letter involving EASTERN GAS TRANSMISSION AND STORAGE, INC.. PHMSA's enforcement data identifies the cited regulation as 192.631(a)(1). The case was opened on 2020-05-28 and is reported as closed as of 2020-05-28. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120201020W_Operator Response to Notice_06252020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201020W/120201020W_Operator%20Response%20to%20Notice_06252020.pdf

120201020W_Warning Letter_05282020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201020W/120201020W_Warning%20Letter_05282020.pdf

120201020W_Warning Letter_05282020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201020W/120201020W_Warning%20Letter_05282020_text.pdf

120201020W_Warning Letter_05282020_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
May 28, 2020
Thomas F. Farrell, II
Chairman, President and Chief Executive Officer
Dominion Energy
1 James Ctr.
Richmond, VA 23219
CPF 1-2020-1020W
Dear Mr. Farrell:
From January 17, 2018 to June 18, 2018, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected records and procedures of Dominion Energy Transmission, Inc. (Dominion) at its main
office in Bridgeport, West Virginia.
As a result of the inspection, it is alleged that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The item inspected and
the probable violation is:
1. § 192.631 Control room management.
(a) General.
(1) This section applies to each operator of a pipeline facility with a
controller working in a control room who monitors and controls all or
part of a pipeline facility through a SCADA system. Each operator
must have and follow written control room management procedures
that implement the requirements of this section, except that for each
control room where an operator's activities are limited to either or both
of:
Dominion failed to follow its written control room management procedures that implemented the
requirements of § 192.631(d)(3)1. Specifically, Dominion failed to follow its Fatigue Mitigation
1 § 192.631(d) Fatigue mitigation. Each operator must implement the following methods to reduce the
risk associated with controller fatigue that could inhibit a controller’s ability to carry out the roles and
responsibilities the operator has defined:
§ 192.631(d)(3) Train controllers and supervisors to recognize the effects of fatigue; and



CPF 1-2020-1020W
Plan Procedure, Revision Number 12/21/2015, (Fatigue Mitigation Plan) by not training a
controller to recognize the effects of fatigue.
Dominion’s Control Room Management Plan, Revision 4, 1/23/2018 referenced a document called
Fatigue Mitigation Plan. The Fatigue Mitigation Plan stated, in part:
“The controllers will be required to take an initial Fatigue Training course through
Circadian Technologies where they will be educated on the risks of fatigue and
practical tips for managing on the job.”
During the onsite inspection from June 5 to 7, 2018, the PHMSA inspector reviewed initial Fatigue
Training course records which included certificates to show that a controller had completed the
course. The PHMSA inspector noticed that Dominion did not have a certificate for one controller.
This individual had assumed a position as a controller on January 5, 2015, and thus should have
received the training by that time. The PHMSA inspector requested Dominion to provide that
controller’s initial training record, but Dominion could not. Dominion did not present any
documentation to show that controller attended or completed its initial Fatigue Training course.
Therefore, Dominion failed follow its written control room management procedures for training
controllers to recognize the effects of fatigue.
After PHMSA’s on-site inspection, Dominion provided a record to show that that controller
completed the initial fatigue training on June 15, 2018 and received a certificate.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for a related
series of violations. For violation occurring on or after November 27, 2018 and before July 31,
2019, the maximum penalty may not exceed $213,268 per violation per day, with a maximum
penalty not to exceed $2,132,679. For violation occurring on or after November 2, 2015 and before
November 27, 2018, the maximum penalty may not exceed $209,002 per violation per day, with a
maximum penalty not to exceed $2,090,022. For violations occurring prior to November 2, 2015,
the maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations. We have reviewed the circumstances
and supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct the
item(s) identified in this letter. Failure to do so will result in Dominion Energy Transmission, Inc.
being subject to additional enforcement action.
Be advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must
provide a second copy of the document with the portions you believe qualify for confidential
treatment redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. 552(b).
120201020W_Warning Letter_05282020_text Page 2 of 3



CPF 1-2020-1020W
No reply to this letter is required. If you choose to reply, please submit all correspondence in this
matter to Robert Burrough, Director, PHMSA Eastern Region, 840 Bear Tavern Road, Suite 300,
West Trenton, NJ 08628. Please refer to CPF 1-2020-1020W on each document you submit, and
whenever possible provide a signed PDF copy in electronic format. Smaller files may be emailed
to robert.burrough@dot.gov. Larger files should be sent on USB flash drive accompanied by the
original paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
CC: Brian Sheppard, Vice President, Eastern Pipeline Operations, Dominion Energy
Transmission, Inc. (via email)
120201020W_Warning Letter_05282020_text Page 3 of 3
- **truncated:** false
- **body characters:** 6688