# EASTERN GAS TRANSMISSION AND STORAGE, INC. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 12021020NOPV
- **title:** EASTERN GAS TRANSMISSION AND STORAGE, INC. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-05-06
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.805(a), 192.805(b), 192.805(g).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021020nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021020nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021020nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12021020NOPV
**body:**

Notice of Probable Violation involving EASTERN GAS TRANSMISSION AND STORAGE, INC.. PHMSA's enforcement data identifies the cited regulations as 192.805(a),  192.805(b),  192.805(g). The case was opened on 2021-05-06 and is reported as closed as of 2021-10-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12021020NOPV_Closure Letter_10072021_(20-171889).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021020NOPV/12021020NOPV_Closure%20Letter_10072021_(20-171889).pdf

12021020NOPV_Closure Letter_10072021_(20-171889)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021020NOPV/12021020NOPV_Closure%20Letter_10072021_(20-171889)_text.pdf

12021020NOPV_Final Order_06282021_(20-171889).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021020NOPV/12021020NOPV_Final%20Order_06282021_(20-171889).pdf

12021020NOPV_Final Order_06282021_(20-171889)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021020NOPV/12021020NOPV_Final%20Order_06282021_(20-171889)_text.pdf

12021020NOPV_NOPV PCO_05062021_(20-171889).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021020NOPV/12021020NOPV_NOPV%20PCO_05062021_(20-171889).pdf

12021020NOPV_NOPV PCO_05062021_(20-171889)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021020NOPV/12021020NOPV_NOPV%20PCO_05062021_(20-171889)_text.pdf

12021020NOPV_Operator Response to Notice_06042021_(20-171889).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021020NOPV/12021020NOPV_Operator%20Response%20to%20Notice_06042021_(20-171889).pdf

12021020NOPV_Final Order_06282021_(20-171889)_text.pdf

June 28, 2021
VIA ELECTRONIC MAIL TO: john.lamb@bhegts.com
Mr. John M. Lamb
Vice President, Eastern Pipeline Operations
Eastern Gas Transmission and Storage, Inc.
925 White Oaks Boulevard
Bridgeport, West Virginia 26330
Re: CPF No. 1-2021-020-NOPV
Dear Mr. Lamb:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Eastern Region, this enforcement action will be closed. Service of the Final Order by e-
mail is effective upon the date of transmission as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Robert Burrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA
Mr. Dan Stahl, Pipeline Integrity Engineer, Eastern Gas Transmission and Storage, Inc.,
daniel.stahl@bhegts.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
__________________________________________
In the Matter of )
)
)
Eastern Gas Transmission and Storage, Inc., )
Respondent. )
__________________________________________)
) CPF No. 1-2021-020-NOPV
FINAL ORDER
On May 6, 2021, pursuant to 49 C.F.R. § 190.207, the Director, Eastern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Eastern Gas
Transmission and Storage, Inc. (Respondent). The Notice proposed finding that Respondent had
violated the pipeline safety regulations in 49 C.F.R. Part 192. The Notice also proposed certain
measures to correct the violations. Respondent did not contest the allegations of violation or
corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.805(a) (Item 1) ─ Respondent failed to have and follow a written
qualification program that identified operations and maintenance welding
inspection as a covered task; and
49 C.F.R. § 192.805(b) (Item 2) ─ Respondent failed to ensure through
evaluation that individuals performing covered tasks were qualified.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ACTIONS
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in



CPF No. 1-2021-020-NOPV
Page 2
referral to the Attorney General for appropriate relief in a district court of the United States.
WARNING ITEM
With respect to Item 3, the Notice alleged a probable violation of 49 C.F.R. § 192.805(g) but did
not propose a civil penalty or compliance order for this item. Therefore, this is considered to be
a warning item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
June 28, 2021
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

12021020NOPV_Closure Letter_10072021_(20-171889)_text.pdf

OVERNIGHT EXPRESS DELIVERY
October 7, 2021
Mr. Matt Lamb
Vice President, Eastern Pipeline Operations
Eastern Gas Transmission and Storage, Inc.
925 White Oaks Boulevard
Bridgeport, WV 26330
CPF 1-2021-020-NOPV
Dear Mr. Lamb:
On May 6, 2021, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to
Eastern Gas Transmission and Storage, Inc. a Final Order in the above-referenced case. This Order
included a Compliance Order. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration