# ROCKY MOUNTAIN NATURAL GAS LLC — Warning Letter

- **operation:** document
- **citation:** CPF 12021024WL
- **title:** ROCKY MOUNTAIN NATURAL GAS LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-03-25
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.12(b)(1), 192.12(b)(2), 192.12(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021024wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021024wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021024wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12021024WL
**body:**

Warning Letter involving ROCKY MOUNTAIN NATURAL GAS LLC. PHMSA's enforcement data identifies the cited regulations as 192.12(b)(1),  192.12(b)(2),  192.12(c). The case was opened on 2021-03-25 and is reported as closed as of 2021-03-25. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12021024WL_Warning Letter_03252021_(20-173110).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021024WL/12021024WL_Warning%20Letter_03252021_(20-173110).pdf

12021024WL_Warning Letter_03252021_(20-173110)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021024WL/12021024WL_Warning%20Letter_03252021_(20-173110)_text.pdf

12021024WL_Warning Letter_03252021_(20-173110)_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
March 25, 2021
Mr. Linn Evans
President and CEO
Rocky Mountain Natural Gas LLC
7001 Mt. Rushmore Rd
Po Box 1400
Rapid City, SD 57709
CPF 1-2021-024-WL
Dear Mr. Evans:
From June 23 to June 25, 2020, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected
Rocky Mountain Natural Gas LLC’s (RMNG) Wolf Creek underground natural gas storage facility
in Pitkin County, Colorado.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed after July
18, 2017, must meet all provisions of API RP 1171 (incorporated by
reference, see § 192.7), and paragraphs (c) and (d) of this section, prior
to commencing operations.
RMNG failed to meet the provisions of API RP 1171, Section 6. Specifically, RMNG did not
maintain records indicating that API 5C3 was used for the design of the casings for 2 wells drilled



CPF 1-2021-024-WL
in 2019 in accordance with API RP 1171, Section 6.3.1 (Section 6.3.1) and as required to be
maintained by API RP 1171, Section 6.11.1 (Section 6.11.1).
Section 6.3.2 states in part:
Each string of casing shall be designed in accordance with API 5C3 in order to safely contain
the internal casing pressures and withstand the external casing (formation) pressures through
the setting depth.
And Section 6.11.1 states in part:
Records of well completion (as-built), well construction and well work activities shall be
maintained for the life of the facility. These records shall include, as applicable and available,
the items listed below as referenced in each subsection.
…
6.3 Well Casing
…
- Design evaluations.
During the inspection, RMNG was not able to provide records demonstrating that API 5C3 was
used for the design of the casings used in wells 9-D2 and 9-D3 that were drilled in 2019. Therefore,
RMNG failed to maintain records relevant to Section 6.3.1 and in accordance with the
requirements of Section 6.11.1.
2. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed after July
18, 2017, must meet all provisions of API RP 1171 (incorporated by
reference, see § 192.7), and paragraphs (c) and (d) of this section, prior
to commencing operations.
RMNG failed to meet the provisions of API RP 1171, Section 6. Specifically, RMNG did not
maintain records indicating that casing was stored, transported, lifted and installed as specified by
the manufacturer and in accordance with API 5C1 and API RP 1171, Section 6.3.6 (Section 6.3.6)
and as required to be maintained by API RP 1171, Section 6.11.1 (Section 6.11.1).
API RP 1171, Section 6.3.6 states in part:
Casing shall be stored, transported, lifted and installed as specified by the manufacturer and
in accordance with API 5C1.
And Section 6.11.1 states in part:
Records of well completion (as-built), well construction and well work activities shall be
maintained for the life of the facility. These records shall include, as applicable and
12021024WL_Warning Letter_03252021_(20-173110)_text Page 2 of 7



CPF 1-2021-024-WL
available, the items listed below as referenced in each subsection.
…
6.3 Well Casing
…
- Design evaluations.
During the inspection, RMNG was not able to provide records to verify that casing was stored,
transported, lifted and installed as specified by the manufacturer and in accordance with API 5C1
for casings used in wells 9-D2 and 9-D3 that were drilled in 2019.
3. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed after July
18, 2017, must meet all provisions of API RP 1171 (incorporated by
reference, see § 192.7), and paragraphs (c) and (d) of this section, prior
to commencing operations.
RMNG failed to meet the provisions of API RP 1171, Section 6. Specifically, RMNG did not
maintain records indicating that production casing was compatible with fluid chemical
composition for wells 9-D2 and 9-D3, drilled in 2019, in accordance with API RP 1171, Section
6.3.5 (Section 6.3.5) and as required to be maintained by API RP 1171, Section 6.11.1 (Section
6.11.1).
Section 6.3.5 states in part:
The production casing, which provides access to the storage interval, shall be of adequate
size and strength to maintain the well integrity and be compatible with fluid chemical
composition.
And Section 6.11.1 states in part:
Records of well completion (as-built), well construction and well work activities shall be
maintained for the life of the facility. These records shall include, as applicable and
available, the items listed below as referenced in each subsection.
…
6.3 Well Casing
…
- Design evaluations.
12021024WL_Warning Letter_03252021_(20-173110)_text Page 3 of 7



CPF 1-2021-024-WL
During the inspection, RMNG was not able to provide records to verify that production casing was
compatible with fluid chemical composition for production casings installed in wells 9-D2 and 9-
D3 that were drilled in 2019. Therefore, RMNG failed to meet the provisions of Section 6.3.5.
4. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) …
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see §192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
RMNG failed to meet the provisions of API RP 1171, Section 9. Specifically, RMNG failed to
evaluate each annular gas occurrence that exceeded operator-defined threshold levels in
accordance with API RP 1171, Section 9.3.2 (Section 9.3.2).
Section 9.3.2 states in part:
The operator shall evaluate each annular gas occurrence that exceeds operator- or
regulatory-defined threshold levels determined from well integrity evaluation and from risk
assessment.
During the inspection, RMNG was not able to provide records of the evaluation of each annular
gas occurrence that exceeded operator-defined threshold levels. Therefore, RMNG failed to meet
the provisions of Section 9.3.2.
5. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) …
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see §192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
RMNG failed to meet the provisions of API RP 1171, Section 9. Specifically, RMNG did not have
records available to verify that ESD valves could only be reopened manually after an inspection
in accordance with Section 9.3.2.
Section 9.3.2 states in part:
A closed storage well safety valve system shall be manually reopened at the site of the valve
12021024WL_Warning Letter_03252021_(20-173110)_text Page 4 of 7



CPF 1-2021-024-WL
after an inspection and not opened from a remote location.
During the inspection, RMNG reported that their ESD valves could only be reopened manually.
However, RMNG was not able to provide records to verify that information, as ESD test records
or ESD valve specification sheets were not available. Therefore, RMNG failed to meet the
provisions of Section 9.3.2.
6. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) …
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see §192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
RMNG failed to meet the provisions of API RP 1171, Section 9. Specifically, RMNG failed to
perform annual surface safety valve function tests between 2018 and 2020 in accordance with
Section 9.3.2.
Section 9.3.2 states in part:
Surface and subsurface safety valve systems, where installed, shall be function-tested at
least annually.
During the inspection, RMNG was not able to provide records of any surface safety valve function
tests between the years 2018 and 2020. Therefore, RMNG failed to meet the provisions of Section
9.3.2.
7. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) …
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see §192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
RMNG failed to meet the provisions of API RP 1171, Section 9. Specifically, RMNG failed to
perform annual wing valve function tests for 2018 and 2019 in accordance with Section 9.3.2.
Section 9.3.2 states in part:
The operator shall test the operation of the master valve and wellhead pipeline isolation
12021024WL_Warning Letter_03252021_(20-173110)_text Page 5 of 7



CPF 1-2021-024-WL
valve at least annually for proper function and ability to isolate the well.
During the inspection, RMNG was not able to provide records of annual wing valve function tests
for 2018 and 2019. Therefore, RMNG failed to meet the provisions of Section 9.3.2.
8. § 192.12 Underground natural gas storage facilities.
(a) …
(c) Procedural manuals. Each operator of a UNGSF must prepare
and follow for each facility one or more manuals of written procedures
for conducting operations, maintenance, and emergency preparedness
and response activities under paragraphs (a) and (b) of this section.
Each operator must keep records necessary to administer such
procedures and review and update these manuals at intervals not
exceeding 15 months, but at least once each calendar year. Each
operator must keep the appropriate parts of these manuals accessible
at locations where UNGSF work is being performed. Each operator
must have written procedures in place before commencing operations
or beginning an activity not yet implemented.
RMNG failed to follow its manual of written procedures for conducting activities under
§192.12(b). Specifically, RMNG failed to follow its Storage Integrity Management Plan (SIMP),
Section 133.6.1.2, during 2019 regarding conducting periodic evaluations at least annually, not to
exceed 15 months.
Section 133.6.1.2 stated in part:
The company’s Storage Integrity Team will conduct periodic evaluations of PFIM risk
model datasets as frequently as needed to assure they contain current and complete
information. The frequency of evaluation will be at least annually, not to exceed 15 months
or whenever indicated based upon risk factors specific to each component.
During the inspection, RMNG was not able to provide records of the 2019 risk management review
process. Therefore, RMNG failed to follow its SIMP, Section 133.6.1.2.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$222,504 per violation per day the violation persists, up to a maximum of $2,225,034 for a related
series of violations. For violation occurring on or after July 31, 2019 and before January 11, 2021,
the maximum penalty may not exceed $218,647 per violation per day the violation persists, up to
a maximum of $2,186,465 for a related series of violations. For violation occurring on or after
November 27, 2018 and before July 31, 2019, the maximum penalty may not exceed $213,268 per
violation per day, with a maximum penalty not to exceed $2,132,679. For violation occurring on
or after November 2, 2015 and before November 27, 2018, the maximum penalty may not exceed
$209,002 per violation per day, with a maximum penalty not to exceed $2,090,022.
We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
12021024WL_Warning Letter_03252021_(20-173110)_text Page 6 of 7



CPF 1-2021-024-WL
time. We advise you to correct the items identified in this letter. Failure to do so will result in
Rocky Mountain Natural Gas LLC being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 1-2021-024-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe the
redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Robert Burrough
Director, Eastern Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
12021024WL_Warning Letter_03252021_(20-173110)_text Page 7 of 7