# NATIONAL FUEL GAS SUPPLY CORP — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 12021057NOPV
- **title:** NATIONAL FUEL GAS SUPPLY CORP — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-10-07
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.167(a)(4), 192.745(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021057nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021057nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021057nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12021057NOPV
**body:**

Notice of Probable Violation involving NATIONAL FUEL GAS SUPPLY CORP. PHMSA's enforcement data identifies the cited regulations as 192.167(a)(4),  192.745(a). The case was opened on 2021-10-07 and is reported as closed as of 2021-12-23. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12021057NOPV_Closure Letter_12232021_(20-172138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021057NOPV/12021057NOPV_Closure%20Letter_12232021_(20-172138).pdf

12021057NOPV_Closure Letter_12232021_(20-172138)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021057NOPV/12021057NOPV_Closure%20Letter_12232021_(20-172138)_text.pdf

12021057NOPV_Final Order_12102021_(20-172138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021057NOPV/12021057NOPV_Final%20Order_12102021_(20-172138).pdf

12021057NOPV_Final Order_12102021_(20-172138)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021057NOPV/12021057NOPV_Final%20Order_12102021_(20-172138)_text.pdf

12021057NOPV_Operator Response to Notice_11242021_(20-172138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021057NOPV/12021057NOPV_Operator%20Response%20to%20Notice_11242021_(20-172138).pdf

12021057NOPV_PCO_10072021_(20-172138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021057NOPV/12021057NOPV_PCO_10072021_(20-172138).pdf

12021057NOPV_PCO_10072021_(20-172138)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021057NOPV/12021057NOPV_PCO_10072021_(20-172138)_text.pdf

12021057NOPV_Final Order_12102021_(20-172138)_text.pdf

December 10, 2021
VIA ELECTRONIC MAIL TO: bauerd@natfuel.com
Mr. David P. Bauer
President and Chief Executive Officer
National Fuel Gas Company
6363 Main Street
Williamsville, New York 14221
Re: CPF No. 1-2021-057-NOPV
Dear Mr. Bauer:
Enclosed please find the Final Order issued in the above-referenced case to your subsidiary,
National Fuel Gas Supply Corporation. It makes a finding of violation and specifies actions that
need to be taken to comply with the pipeline safety regulations. When the terms of the
compliance order are completed, as determined by the Director, Eastern Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the
date of transmission as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Robert Burrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA
Mr. Ronald Kraemer, President, National Fuel Gas Supply Corp., kraemerr@natfuel.com
Mr. Ramon P. Harris, Jr., Vice President, National Fuel Gas Supply Corp.,
harrisr@natfuel.com
Ms. Laura Berloth, Senior Attorney, National Fuel Gas Supply Corp., berlothl@natfuel.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
__________________________________________
In the Matter of )
National Fuel Gas Supply Corporation, ) CPF No. 1-2021-057-NOPV
a subsidiary of National Fuel Gas Company, )
)
)
)
Respondent. )
__________________________________________)
FINAL ORDER
On October 7, 2021, pursuant to 49 C.F.R. § 190.207, the Director, Eastern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to National Fuel Gas
Supply Corporation (NFG or Respondent), a subsidiary of National Fuel Gas Company.1 The
Notice proposed finding that Respondent had violated the pipeline safety regulations in
49 C.F.R. § 192.167(a)(4). The Notice also proposed certain measures to correct the violation.
NFG did not contest the allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.167(a)(4) (Item 1) ─ Respondent failed to install an emergency
shutdown system for its attended compressor station that is operable from at least
two locations outside the gas area of the station, near the exit gates of the fenced
station, and not more than 500 feet from the limits of the station.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ACTIONS
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
1 https://www nationalfuel.com/pipeline-storage/national-fuel-gas-supply-corp/about-national-fuel-gas-supply-
corporation/ (last accessed December 6, 2021)



CPF No. 1-2021-057-NOPV
Page 2
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in
referral to the Attorney General for appropriate relief in a district court of the United States.
WARNING ITEM
With respect to Item 2, the Notice alleged a probable violation of 49 C.F.R. § 192.745(a), but did
not propose a civil penalty or compliance order for this item. Therefore, this is considered a
warning item. If OPS finds a violation of this provision in a subsequent inspection, Respondent
may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
December 10, 2021
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

12021057NOPV_Closure Letter_12232021_(20-172138)_text.pdf

VIA ELECTRONIC MAIL TO: bauerd@natfuel.com
December 23, 2021
Mr. David P. Bauer
President and Chief Executive Officer
National Fuel Gas Company
6363 Main Street
Williamsville, NY 14221
CPF 1-2021-057-NOPV
Dear Mr. Bauer:
On December 10, 2021, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to National Fuel Gas Company a Final Order in the above-referenced case. This Order
included a Compliance Order. Based on our review of the documentation provided and onsite
confirmation of the completion of the work on the pipeline facilities, it has been determined that
you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration