# EQUITRANS MIDSTREAM CORPORATION — Notice of Amendment

- **operation:** document
- **citation:** CPF 12021063NOA
- **title:** EQUITRANS MIDSTREAM CORPORATION — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-11-18
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.303.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021063noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021063noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021063noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12021063NOA
**body:**

Notice of Amendment involving EQUITRANS MIDSTREAM CORPORATION. PHMSA's enforcement data identifies the cited regulation as 192.303. The case was opened on 2021-11-18 and is reported as closed as of 2022-02-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12021063NOA_Closure Letter_02222022_(20-172495).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021063NOA/12021063NOA_Closure%20Letter_02222022_(20-172495).pdf

12021063NOA_Closure Letter_02222022_(20-172495)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021063NOA/12021063NOA_Closure%20Letter_02222022_(20-172495)_text.pdf

12021063NOA_Notice of Amendment_11182021_(20-172495).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021063NOA/12021063NOA_Notice%20of%20Amendment_11182021_(20-172495).pdf

12021063NOA_Notice of Amendment_11182021_(20-172495)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021063NOA/12021063NOA_Notice%20of%20Amendment_11182021_(20-172495)_text.pdf

12021063NOA_Operator Response to Notice_12162021_(20-172495).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021063NOA/12021063NOA_Operator%20Response%20to%20Notice_12162021_(20-172495).pdf

12021063NOA_Notice of Amendment_11182021_(20-172495)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
November 18, 2021
Mr. Gregg West
Vice President, Midstream Operations
Equitrans Midstream Corporation
2200 Energy Drive
Canonsburg, Pennsylvania 15317
CPF 1-2021-063-NOA
Dear Mr. West:
From July 20, 2021 to July 21, 2021, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected
Equitrans Midstream Corporation’s (EQT) design and construction procedures for the Mountain
Valley Pipeline in Beckley, West Virginia.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within EQT’s
plans or procedures, as described below:
1. § 192.303 Compliance with specifications or standards.
Each transmission line or main must be constructed in accordance
with comprehensive written specifications or standards that are consistent
with this part.
EQT’s standards for constructing transmission lines were inadequate to ensure safe operation of a
pipeline facility. Specifically, EQT’s MVP construction standards for coating inspection did not
adequately address the requirements of § 192.307,1 § 192.309,2 and § 192.461(e),3 as required by §
192.303.
During the inspection, PHMSA requested EQT’s procedures for assessing coating and remediating
damage that may have occurred as a result of installation by boring, driving, horizontal directional
drilling, or other similar methods. EQT provided Sections 10.2 and 10.4 of its MVP Design and
Construction Manual. However, these procedures did not address inspecting and assessing pipe that
emerges in the exit pit for indication of damage. Additionally, the procedures did not include
requirements to remediate damage that may have occurred during installation.



CPF 1-2021-063-NOA
Therefore, EQT failed to prepare written standards to be followed during transmission line or main
construction that were consistent with the requirements of Part 192, as required by § 192.303. EQT
must revise its procedures to specifically address the requirements of § 192.307, § 192.309, and §
192.416(e).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as part
of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you submit
in response to this enforcement action is subject to being made publicly available. If you believe that
any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document with the
portions you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised procedures,
or a request for a hearing under § 190.211. If you do not respond within 30 days of receipt of this
Notice, this constitutes a waiver of your right to contest the allegations in this Notice and authorizes
the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue an Order Directing Amendment. If your plans or procedures are found
inadequate as alleged in this Notice, you may be ordered to amend your plans or procedures to correct
the inadequacies (49 C.F.R. § 190.206). If you are not contesting this Notice, we propose that you
submit your amended procedures to my office within 30 days of receipt of this Notice. This period
may be extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that EQT maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and
submit the total to Robert Burrough, Director, Eastern Region, Pipeline and Hazardous Materials
Safety Administration, 840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. In correspondence
concerning this matter, please refer to CPF 1-2021-063-NOA and, for each document you submit,
please provide a copy in electronic format whenever possible. Smaller files may be emailed to
robert.burrough@dot.gov. Larger files should be sent on USB flash drive accompanied by the original
paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
12021063NOA_Notice of Amendment_11182021_(20-172495)_text Page 2 of 3



CPF 1-2021-063-NOA
1 § 192.307 Inspection of materials.
Each length of pipe and each other component must be visually inspected at the site of installation to ensure that it
has not sustained any visually determinable damage that could impair its serviceability.
2 § 192.309 Repair of steel pipe.
(a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or
removed. …
3 § 192.461 External corrosion control: Protective coating.
(a) …
(e) If coated pipe is installed by boring, driving, or other similar method, precautions must be taken to minimize
damage to the coating during installation.
12021063NOA_Notice of Amendment_11182021_(20-172495)_text Page 3 of 3

12021063NOA_Closure Letter_02222022_(20-172495)_text.pdf

VIA ELECTRONIC MAIL TO: GWest@equitransmidstream.com
February 22, 2022
Mr. Gregg West
Vice President, Midstream Operations
Equitrans Midstream Corporation
2200 Energy Drive
Canonsburg, Pennsylvania 15317
CPF 1-2021-063-NOA
Dear Mr. West:
From July 20, 2021 to July 21, 2021, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Equitrans Midstream Corporation's (EQT) design and construction procedures for the
Mountain Valley Pipeline in Beckley, West Virginia. As a result of the inspection, EQT was issued
a Notice of Amendment on November 18, 2021, which proposed an amendment of your
procedures.
EQT submitted its amended procedures on December 16, 2021. My staff has reviewed the
amended procedures, and it appears that the modifications incorporated into your MVP
construction standard have been implemented and amended adequately to address the inadequacy.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region