# FORE RIVER ENERGY CENTER — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 12021065NOPV
- **title:** FORE RIVER ENERGY CENTER — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-12-10
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.402(a), 195.402(c)(13), 195.577(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021065nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021065nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12021065nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12021065NOPV
**body:**

Notice of Probable Violation involving FORE RIVER ENERGY CENTER. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(13),  195.577(a). The case was opened on 2021-12-10 and is reported as closed as of 2022-06-02. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12021065NOPV_Closure Letter_06022022_(20-172057).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021065NOPV/12021065NOPV_Closure%20Letter_06022022_(20-172057).pdf

12021065NOPV_Closure Letter_06022022_(20-172057)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021065NOPV/12021065NOPV_Closure%20Letter_06022022_(20-172057)_text.pdf

12021065NOPV_Final Order_01312022_(20-172057).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021065NOPV/12021065NOPV_Final%20Order_01312022_(20-172057).pdf

12021065NOPV_Final Order_01312022_(20-172057)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021065NOPV/12021065NOPV_Final%20Order_01312022_(20-172057)_text.pdf

12021065NOPV_NOPV_PCO_12102021_(20-172057).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021065NOPV/12021065NOPV_NOPV_PCO_12102021_(20-172057).pdf

12021065NOPV_NOPV_PCO_12102021_(20-172057)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021065NOPV/12021065NOPV_NOPV_PCO_12102021_(20-172057)_text.pdf

12021065NOPV_Operator Response to Notice_01062022_(20-172057).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021065NOPV/12021065NOPV_Operator%20Response%20to%20Notice_01062022_(20-172057).pdf

12021065NOPV_Closure Letter_06022022_(20-172057)_text.pdf

OVERNIGHT EXPRESS DELIVERY
June 2, 2022
Mr. Charlie Gates
Executive Vice President of Power Operations
Fore River Energy Center
9 Bridge Street
Weymouth, Massachusetts 02191
CPF 1-2021-065-NOPV
Dear Mr. Gates:
On January 31, 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Fore River Energy Center’s (FREC), a Final Order in the above-referenced case. This
Order included a Compliance Order. Based on our review of the documentation you provided on
May 11, 2022, regarding the Compliance Order, it has been determined that you have complied
with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

12021065NOPV_Final Order_01312022_(20-172057)_text.pdf

January 31, 2022
VIA ELECTRONIC MAIL TO: charlie.gates@calpine.com
Mr. Charlie Gates
Executive Vice President of Power Operations
Fore River Energy Center
9 Bridge Street
Weymouth, Massachusetts 02191
Re: CPF No. 1-2021-065-NOPV
Dear Mr. Gates:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Eastern Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Robert Burrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA
Mr. Scott Vickers, Compliance Manager, CPN Pipeline Co., scott.vickers@calpine.com
Mr. Charles Parnell, Plant Manager, FREC, charles.parnell@calpine.com
Mr. Chris Delaney, Engineering and Compliance Manager, CPN Pipeline Co.,
chris.delaney@calpine.com
Mr. Lyle Fedje, Director, Pipeline Operations, CPN Pipeline Co., lyle.fedje@calpine.com
Mr. David Lamoreaux, Calpine Regional Managing Counsel,
david.lamoreaux@calpine.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Fore River Energy Center, ) CPF No. 1-2021-065-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On December 10, 2021, pursuant to 49 C.F.R. § 190.207, the Director, Eastern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation and Proposed Compliance Order
(Notice) to Fore River Energy Center (Respondent). The Notice proposed finding that
Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 195. The Notice also
proposed certain measures to correct the violations. Respondent did not contest the allegations
of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.402(a) (Item 2) ─ Respondent failed to follow its training
procedure regarding training and knowledge verification of its supervisors.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in
referral to the Attorney General for appropriate relief in a district court of the United States.



Warning Items
With respect to Items 1, 3, and 4, the Notice alleged probable violations of 49 C.F.R. §§
195.402(a), 195.402(c)(13), and 195.577(a), respectively, but did not propose a civil penalty or
compliance order for these items. Therefore, these are considered to be warning items. If OPS
finds a violation of any of these items in a subsequent inspection, Respondent may be subject to
future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 31, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety