# WSP USA INC. — Notice of Amendment

- **operation:** document
- **citation:** CPF 12022006NOA
- **title:** WSP USA INC. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-01-13
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.12(d)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022006noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022006noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022006noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12022006NOA
**body:**

Notice of Amendment involving WSP USA INC.. PHMSA's enforcement data identifies the cited regulation as 192.12(d)(4). The case was opened on 2022-01-13 and is reported as closed as of 2022-02-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12022006NOA_Closure Letter_02222022_(21-200037).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022006NOA/12022006NOA_Closure%20Letter_02222022_(21-200037).pdf

12022006NOA_Closure Letter_02222022_(21-200037)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022006NOA/12022006NOA_Closure%20Letter_02222022_(21-200037)_text.pdf

12022006NOA_Notice of Amendment_01132022_(21-200037).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022006NOA/12022006NOA_Notice%20of%20Amendment_01132022_(21-200037).pdf

12022006NOA_Notice of Amendment_01132022_(21-200037)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022006NOA/12022006NOA_Notice%20of%20Amendment_01132022_(21-200037)_text.pdf

12022006NOA_Operator Response to Notice_01312022_(21-200037).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022006NOA/12022006NOA_Operator%20Response%20to%20Notice_01312022_(21-200037).pdf

12022006NOA_Closure Letter_02222022_(21-200037)_text.pdf

VIA ELECTRONIC MAIL TO: roger.blair@wsp.com
February 22, 2022
Mr. Roger Blair
President, US Energy
WSP USA Inc.
16285 Park Ten Place, 4th Floor
Houston, Texas 77005
CPF 1-2022-006-NOA
Dear Mr. Blair:
From May 11, 2021 through May 14, 2021, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of WSP USA, Inc.’s (WSP) procedures, including
its integrity management plan, for its underground natural gas storage facility in Jefferson County,
Texas. As a result of the inspection, WSP was issued a Notice of Amendment on January 13, 2022,
which proposed amendment of your integrity management plan.
WSP submitted its amended integrity management plan on January 31, 2022. My staff reviewed
the amended integrity management plan, and your commitment to further revise the plan, and it
appears that the inadequacies outlined in this Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

12022006NOA_Notice of Amendment_01132022_(21-200037)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
January 13, 2022
Mr. Roger Blair
President, US Energy
WSP USA Inc.
16285 Park Ten Place, 4th Floor
Houston, Texas 77005
CPF 1-2022-006-NOA
Dear Mr. Blair:
From May 11, 2021 through May 14, 2021, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected
WSP USA Inc.’s (WSP) procedures for its Spindletop Underground Storage Facility in Jefferson
County, Texas.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within WSP’s
procedures, as described below:
1. § 192.12 Underground natural gas storage facilities.
(a) …
(d) Integrity management program—
(1) …
(4) Integrity management procedures and recordkeeping. Each UNGSF
operator must establish and follow written procedures to carry out its
integrity management program under API RP 1171 (incorporated by
reference, see § 192.7), section 8 ("Risk Management for Gas Storage
Operations"), and this paragraph (d). The operator must also maintain,
for the useful life of the UNGSF, records that demonstrate compliance
with the requirements of this paragraph (d). This includes records
developed and used in support of any identification, calculation,
amendment, modification, justification, deviation, and determination
made, and any action taken to implement and evaluate any integrity
management program element.



CPF 1-2022-006-NOA
WSP’s written procedures for carrying out its integrity management program were inadequate to
ensure safe operation of a pipeline facility. Specifically, WSP’s procedures failed to include sufficient
detail to ensure that the results from earlier risk assessments and updated risk analyses were used to
determine appropriate reassessment intervals in accordance with § 192.12(d)(3).1
Under § 192.12(d)(3), WSP is required to determine appropriate intervals for risk assessments for each
cavern and well using the results from earlier assessments and updated risk analyses. In addition, API
RP 1171, subsection 8.7.1 requires operators to assess the effectiveness of risk monitoring and risk
management programs and maintain a continual review and improvement cycle.2
During the inspection, PHMSA reviewed WSP’s written integrity management plan, WSP
Underground Storage Integrity Management Plan Spindletop Salt Cavern (2021) (IM Plan). Based
on this review, PHMSA identified that results from earlier assessments and updated risk analyses were
not factored into WSP’s decision process for determining intervals for reassessment. WSP’s process
for determining the appropriate interval for risk assessments was limited to a baseline risk model
performed for WSP by DNV GL Oil & Gas Services (DNV).3 DNV used a probability of failure
calculation to determine proof test intervals for WSP’s system. In calculating the probability of failure,
DNV used outside data sources rather than WSP cavern data such as results from earlier integrity
inspections, monitoring activities, or risk assessments.
WSP’s integrity management plan failed to include procedures for establishing the appropriate interval
for risk assessments or procedures that would ensure that reassessment intervals would be established
using the results from earlier assessments and updated risk analyses.
Therefore, WSP’s integrity management procedures required by § 192.12(d)(4) were inadequate. WSP
must revise its IM Plan to address the deficiency noted above.
1 § 192.12 Underground natural gas storage facilities.
(a) …
(d) Integrity management program
(1) …
(3) Integrity management re-assessment intervals. The operator must determine the appropriate interval for risk
assessments under API RP 1171 (incorporated by reference, see §192.7), subsection 8.7.1, and this paragraph (d) for
each reservoir, cavern, and well, using the results from earlier assessments and updated risk analyses. The re-
assessment interval for each reservoir, cavern, and well must not exceed seven years from the date of the baseline
assessment for each reservoir, cavern, and well.
2 API RP 1171, Section 8
Subsection 8.7.1. General. The operator shall assess the effectiveness of risk monitoring and risk management
programs and maintain a continual review and improvement cycle in risk management activities to provide
functional integrity of the storage operation. The interval of review and reassessment should be short enough to
identify operational and monitoring trends and measure the effectiveness of P&M measures, but long enough that
the data and information that can be brought into the analysis are meaningful.
Subsection 8.7.2. Frequency. The operator shall define a review frequency for the risk assessment and perform a
review and update of the risk assessment in accordance with the defined frequency.
3 Underground Storage Integrity Management Plan, Appendix C & Appendix D (on file with PHMSA).
12022006NOA_Notice of Amendment_01132022_(21-200037)_text Page 2 of 4



CPF 1-2022-006-NOA
2. § 192.12 Underground natural gas storage facilities.
(a) …
(d) Integrity management program—
(1) …
(4) Integrity management procedures and recordkeeping. Each UNGSF
operator must establish and follow written procedures to carry out its
integrity management program under API RP 1171 (incorporated by
reference, see § 192.7), section 8 ("Risk Management for Gas Storage
Operations"), and this paragraph (d). The operator must also maintain,
for the useful life of the UNGSF, records that demonstrate compliance
with the requirements of this paragraph (d). This includes records
developed and used in support of any identification, calculation,
amendment, modification, justification, deviation, and determination
made, and any action taken to implement and evaluate any integrity
management program element.
WSP’s written procedures for carrying out its integrity management program were inadequate to
ensure safe operation of a pipeline facility. Specifically, WSP’s procedures failed to address three of
the six elements of an integrity management program required by § 192.12(d)(1).4
During the inspection, PHMSA reviewed WSP’s written integrity management plan, WSP
Underground Storage Integrity Management Plan Spindletop Salt Cavern (2021) (IM Plan). Based
upon this review, PHMSA determined that WSP failed to include three of the integrity management
program elements required by § 192.12(d)(1). First, the IM Plan did not provide a framework that
described the roles and responsibilities for WSP personnel assigned to develop and implement the
procedures required by § 192.12(d), as required by § 192.12(d)(1)(iii). Additionally, the IM Plan’s
training procedure did not address trainings on integrity management procedures for gas storage
operations, as required by § 192.12(d)(1)(iv). Lastly, the IM Plan did not include a plan for continual
improvement of the risk management program based on incorporating information gained from
experience, as required by § 192.12(d)(1)(vi).
4 § 192.12 Underground natural gas storage facilities.
(a) …
(d) Integrity management program
(1) Integrity management program elements. The integrity management program for each UNGSF under this
paragraph (d) must consist, at a minimum, of a framework developed under API RP 1171 (incorporated by
reference, see §192.7), section 8 (“Risk Management for Gas Storage Operations”), and that also describes how
relevant decisions will be made and by whom. An operator must make continual improvements to the program and
its execution. The integrity management program must include the following elements:
(i) A plan for developing and implementing each program element to meet the requirements of this section;
(ii) An outline of the procedures to be developed;
(iii) The roles and responsibilities of UNGSF staff assigned to develop and implement the procedures required by
this paragraph (d);
(iv) A plan for how staff will be trained in awareness and application of the procedures required by this paragraph
(d);
(v) Timelines for implementing each program element, including the risk analysis and baseline risk assessments; and
(vi) A plan for how to incorporate information gained from experience into the integrity management program on a
continuous basis.
12022006NOA_Notice of Amendment_01132022_(21-200037)_text Page 3 of 4



CPF 1-2022-006-NOA
Therefore, WSP’s integrity management plan required by § 192.12(d)(4) lacked three of the six
elements specified by § 192.12(d)(1). WSP must revise its IM Plan to address these elements.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as part
of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you submit
in response to this enforcement action is subject to being made publicly available. If you believe that
any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document with the
portions you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised procedures,
or a request for a hearing under §190.211. If you do not respond within 30 days of receipt of this
Notice, this constitutes a waiver of your right to contest the allegations in this Notice and authorizes
the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue an Order Directing Amendment. If your plans or procedures are found
inadequate as alleged in this Notice, you may be ordered to amend your plans or procedures to correct
the inadequacies (49 C.F.R. § 190.206). If you are not contesting this Notice, we propose that you
submit your amended procedures to my office within 30 days of receipt of this Notice. This period
may be extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that WSP USA Inc. maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures)
and submit the total to Robert Burrough, Director, Eastern Region, Pipeline and Hazardous Materials
Safety Administration, 840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. In correspondence
concerning this matter, please refer to CPF 1-2022-006-NOA and, for each document you submit,
please provide a copy in electronic format whenever possible. Smaller files may be emailed to
robert.burrough@dot.gov. Larger files should be sent on USB flash drive accompanied by the original
paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
12022006NOA_Notice of Amendment_01132022_(21-200037)_text Page 4 of 4
- **truncated:** false
- **body characters:** 13931