# AMEREN ILLINOIS COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 12022045NOA
- **title:** AMEREN ILLINOIS COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-04-26
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.12(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022045noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022045noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022045noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12022045NOA
**body:**

Notice of Amendment involving AMEREN ILLINOIS COMPANY. PHMSA's enforcement data identifies the cited regulation as 192.12(b)(2). The case was opened on 2022-04-26 and is reported as closed as of 2022-06-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12022045NOA_Closure Letter_06162022_(21-209277).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022045NOA/12022045NOA_Closure%20Letter_06162022_(21-209277).pdf

12022045NOA_Closure Letter_06162022_(21-209277)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022045NOA/12022045NOA_Closure%20Letter_06162022_(21-209277)_text.pdf

12022045NOA_Notice of Amendment_04262022_(21-209277).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022045NOA/12022045NOA_Notice%20of%20Amendment_04262022_(21-209277).pdf

12022045NOA_Notice of Amendment_04262022_(21-209277)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022045NOA/12022045NOA_Notice%20of%20Amendment_04262022_(21-209277)_text.pdf

12022045NOA_Operator Response to Notice_05262022_(21-209277).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022045NOA/12022045NOA_Operator%20Response%20to%20Notice_05262022_(21-209277).pdf

12022045NOA_Closure Letter_06162022_(21-209277)_text.pdf

OVERNIGHT EXPRESS DELIVERY
June 16, 2022
Mr. Richard J. Mark
Chairman and President
Ameren Illinois Company
10 Executive Drive
Collinsville, Illinois 62234
CPF 1-2022-045-NOA
Dear Mr. Mark:
From April 19, 2021 through April 23, 2021, the Illinois Department of Natural Resources, Office of
Oil and Gas Resource Management (IDNR), acting as a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Ameren Illinois Company’s (AIC) Lincoln Underground Natural Gas Storage Facility
(UNGSF) in Logan County, Illinois. As a result of the inspection, AIC was issued a Notice of
Amendment on April 26, 2022, which proposed amendment of your procedures.
AIC submitted its amended procedures on May 26, 2022. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

12022045NOA_Notice of Amendment_04262022_(21-209277)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
April 26, 2022
Mr. Richard J. Mark
Chairman and President
Ameren Illinois Company
10 Executive Drive
Collinsville, Illinois 62234
CPF 1-2022-045-NOA
Dear Mr. Mark:
From April 19, 2021 through April 23, 2021, the Illinois Department of Natural Resources, Office of
Oil and Gas Resource Management (IDNR), acting as a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Ameren Illinois Company’s (AIC) Lincoln Underground Natural Gas Storage Facility
(UNGSF) in Logan County, Illinois.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within AIC’s
plans or procedures, as described below:
1. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) …
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or before
July 18, 2017, must meet the provisions of API RP 1171 (incorporated by
reference, see § 192.7), sections 8, 9, 10, and 11, and paragraph (c) of this
section, by January 18, 2018, and must meet all provisions of paragraph
(d) of this section by March 13, 2021.
AIC’s written procedures were inadequate to assure safe operation of a pipeline facility. Specifically,
AIC’s procedures required by API RP 1171, Section 11.2.1 - Construction, Operation, and
Maintenance Procedures (Section 11.2.1) were inadequate for the storing, transporting, lifting and



CPF 1-2022-045-NOA
installing of piping pursuant to API RP 1171, Section 6.3.6 - Handling (Section 6.3.6).
Section 11.2.1 requires that “[t]he operator shall develop and follow procedures for the construction,
operation, and maintenance of natural gas storage wells and reservoirs to establish and maintain
functional integrity.” Section 6.3.6 states in part that the “[c]asing shall be stored, transported, lifted
and installed as specified by the manufacturer and in accordance with API 5C1.”
During the inspection, AIC was not able to provide procedures or records to verify that casing was
stored, transported, lifted and installed as specified by the manufacturer and in accordance with API
5C1 for tubing installed in wells Worthington Horney in 2020 and Roller in 2019. Form 6.3, Tubular
Handling and Transportation Checklist was developed for future well workovers.
Therefore, AIC’s procedures were inadequate regarding casings. AIC must revise its procedures to
address the deficiency noted above.
2. § 192.12 Underground natural gas storage facilities.
(a) …
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) …
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or before
July 18, 2017, must meet the provisions of API RP 1171 (incorporated by
reference, see § 192.7), sections 8, 9, 10, and 11, and paragraph (c) of this
section, by January 18, 2018, and must meet all provisions of paragraph
(d) of this section by March 13, 2021.
AIC’s written procedures were inadequate to assure safe operation of a pipeline facility. Specifically,
AIC’s procedures required by Section 11.2.1 were inadequate regarding safeguards to the environment,
safety, and health of workers and the public pursuant to API RP 1171, Section 6.8.1- Design and
Construction Safeguards (Section 6.8.1).
Section 11.2.1 states in part “[t]he operator shall develop and follow procedures for the construction,
operation, and maintenance of natural gas storage wells and reservoirs to establish and maintain
functional integrity.” Section 6.8.1 states in part “[s]afeguards to the environment, safety, and health
of workers and the public shall be incorporated into well design and well work activities.”
During the inspection, AIC was not able to provide procedures or records that identified and enforced
safeguards to the environment, safety and health of workers and the public prior to well workover on
Worthington Horney in 2020 and Roller in 2019. No measures were demonstrated to have been taken
to detect and mitigate H2S gas which was known to be present within the wells in this field. AIC
provided a draft of form, Well Work Environmental Safety Checklist, to incorporate for future records.
Therefore, AIC’s procedures were inadequate regarding safeguards to the environment, safety and
health of workers and the public. AIC must revise its procedures to address the deficiency noted above.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as part
of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
12022045NOA_Notice of Amendment_04262022_(21-209277)_text Page 2 of 3



CPF 1-2022-045-NOA
Proceedings.
Please refer to this document and note the response options. Be advised that all material you submit
in response to this enforcement action is subject to being made publicly available. If you believe that
any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document with the
portions you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised procedures,
or a request for a hearing under §190.211. If you do not respond within 30 days of receipt of this
Notice, this constitutes a waiver of your right to contest the allegations in this Notice and authorizes
the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue an Order Directing Amendment. If your plans or procedures are found
inadequate as alleged in this Notice, you may be ordered to amend your plans or procedures to correct
the inadequacies (49 C.F.R. § 190.206). If you are not contesting this Notice, we propose that you
submit your amended procedures to my office within 30 days of receipt of this Notice. This period
may be extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that Ameren Illinois Company maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Robert Burrough, Director, Eastern Region, Pipeline and Hazardous
Materials Safety Administration, 840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. In
correspondence concerning this matter, please refer to CPF 1-2022-045-NOA and, for each document
you submit, please provide a copy in electronic format whenever possible. Smaller files may be emailed
to robert.burrough@dot.gov. Larger files should be sent on USB flash drive accompanied by the
original paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
12022045NOA_Notice of Amendment_04262022_(21-209277)_text Page 3 of 3
- **truncated:** false
- **body characters:** 9979