# KIANTONE PIPELINE CORP — Notice of Amendment

- **operation:** document
- **citation:** CPF 12022063NOA
- **title:** KIANTONE PIPELINE CORP — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-11-03
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.446(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022063noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022063noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022063noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12022063NOA
**body:**

Notice of Amendment involving KIANTONE PIPELINE CORP. PHMSA's enforcement data identifies the cited regulation as 195.446(a). The case was opened on 2022-11-03 and is reported as closed as of 2023-02-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12022063NOA_Closure Letter_02162023_(21-199433).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022063NOA/12022063NOA_Closure%20Letter_02162023_(21-199433).pdf

12022063NOA_Closure Letter_02162023_(21-199433)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022063NOA/12022063NOA_Closure%20Letter_02162023_(21-199433)_text.pdf

12022063NOA_Notice of Amendment_11032022_(21-199433).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022063NOA/12022063NOA_Notice%20of%20Amendment_11032022_(21-199433).pdf

12022063NOA_Notice of Amendment_11032022_(21-199433)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022063NOA/12022063NOA_Notice%20of%20Amendment_11032022_(21-199433)_text.pdf

12022063NOA_Operator Response to Notice_12022022_(21-199433).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022063NOA/12022063NOA_Operator%20Response%20to%20Notice_12022022_(21-199433).pdf

12022063NOA_Notice of Amendment_11032022_(21-199433)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
November 3, 2022
Mr. Dave Wortman
Vice President, Supply and Transportation
Kiantone Pipeline Corp
15 Bradley Street
PO Box 780
Warren, Pennsylvania 16365
CPF 1-2022-063-NOA
Dear Mr. Wortman:
From August 9, 2021 through August 13, 2021, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected Kiantone Pipeline Corp’s (Kiantone) procedures for control room management for its
West Seneca, New York control room.
On the basis of the inspection, PHMSA has identified an apparent inadequacy found within
Kiantone’s plans or procedures, as described below:
1. § 195.446 Control Room Management
(a) General. This section applies to each operator of a pipeline
facility with a controller working in a control room who monitors and
controls all or part of a pipeline facility through a SCADA system. Each
operator must have and follow written control room management
procedures that implement the requirements of this section. The
procedures required by this section must be integrated, as appropriate,
with the operator's written procedures required by § 195.402. An
operator must develop the procedures no later than August 1, 2011, and
must implement the procedures according to the following schedule.
The procedures required by paragraphs (b), (c)(5), (d)(2) and (d)(3), (f)
and (g) of this section must be implemented no later than October 1,



2011. The procedures required by paragraphs (c)(1) through (4),
(d)(1), (d)(4), and (e) must be implemented no later than August 1, 2012.
The training procedures required by paragraph (h) must be
implemented no later than August 1, 2012, except that any training
required by another paragraph of this section must be implemented no
later than the deadline for that paragraph.
Kiantone’s control room management procedures were inadequate to ensure safe operation of a
pipeline facility. Specifically, Kiantone’s written control room management procedures failed to
include procedures for testing backup SCADA systems in accordance with § 195.446(c)(4).
1
During the inspection, PHMSA asked Kiantone to submit procedures addressing the testing of
backup SCADA systems. Kiantone stated that they do not have backup SCADA systems and thus
they did not need to have a procedure for testing any backup SCADA system. However, in the
CRM Form submitted to PHMSA prior to the inspection, Kiantone listed backup control rooms at
Gowanda Booster Station and Warren Lab with SCADA and communication systems with similar
functionality as the primary control room.
2 In addition, Kiantone’s Control Room Procedures
identify Gowanda Booster Station and Warren Lab as redundant control rooms.3
Therefore, Kiantone’s control room management procedures were inadequate as they lacked any
procedures or specific details about testing Kiantone’s backup SCADA systems. Kiantone must
develop a procedure for testing backup SCADA systems including redundant servers and
communication systems.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
1 § 195.446 Control Room Management
(a) …
(c) Provide adequate information. Each operator must provide its controllers with the information, tools, processes
and procedures necessary for the controllers to carry out the roles and responsibilities the operator has defined by
performing each of the following:
(1) ..
(4) Test any backup SCADA systems at least once each calendar year, but at intervals not to exceed 15 months:
2 In Item 24 of the CRM Form submitted to PHMSA, Off-site Backup Control Room, Kiantone identified 2 off-site
backup control rooms with the same capability as the primary located in zip codes 14070 and 16365, which correlate
with the aforementioned sites.
3 PHMSA defines “backup SCADA systems” as independent or redundant systems that provide similar functionality
to the primary SCADA system. See, PHMSA Control Room Management FAQ C-08 available at faqscontrol-room-
management20180726 1.docx (live.com) (Last accessed October 11, 2022).



U.S.C. 552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Kiantone Pipeline Corp maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, Eastern Region, Pipeline and
Hazardous Materials Safety Administration, 840 Bear Tavern Road, Suite 300, West Trenton, NJ
08628. In correspondence concerning this matter, please refer to CPF 1-2022-063-NOA and, for
each document you submit, please provide a copy in electronic format whenever possible. Smaller
files may be emailed to robert.burrough@dot.gov. Larger files should be sent on USB flash drive
accompanied by the original paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings

12022063NOA_Closure Letter_02162023_(21-199433)_text.pdf

OVERNIGHT EXPRESS DELIVERY
February 16, 2023
Mr. Dave Wortman
Vice President, Supply and Transportation
Kiantone Pipeline Corp
15 Bradley Street
PO Box 780
Warren, Pennsylvania 16365
CPF 1-2022-063-NOA
Dear Mr. Wortman:
From August 9, 2021, through August 13, 2021, representatives from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
conducted a pipeline safety inspection of Kiantone Pipeline Corp’s (Kiantone) procedures for
control room management for its West Seneca, New York control room. As a result of the
inspection, Kiantone was issued a Notice of Amendment on November 3, 2022, which proposed
amendment of your procedures.
Kiantone submitted its amended procedures on December 12, 2022. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false