# TUSCARORA GAS TRANSMISSION COMPANY — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 12022070NOPV
- **title:** TUSCARORA GAS TRANSMISSION COMPANY — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-11-03
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.605(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022070nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022070nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12022070nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12022070NOPV
**body:**

Notice of Probable Violation involving TUSCARORA GAS TRANSMISSION COMPANY. PHMSA's enforcement data identifies the cited regulation as 192.605(a). The case was opened on 2022-11-03 and is reported as closed as of 2023-09-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12022070NOPV_Closure Letter_09142023_(22-233368).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022070NOPV/12022070NOPV_Closure%20Letter_09142023_(22-233368).pdf

12022070NOPV_Closure Letter_09142023_(22-233368)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022070NOPV/12022070NOPV_Closure%20Letter_09142023_(22-233368)_text.pdf

12022070NOPV_Final Order_01102023_(22-233368).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022070NOPV/12022070NOPV_Final%20Order_01102023_(22-233368).pdf

12022070NOPV_Final Order_01102023_(22-233368)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022070NOPV/12022070NOPV_Final%20Order_01102023_(22-233368)_text.pdf

12022070NOPV_Operator Response to Notice_11302022_(22-233368).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022070NOPV/12022070NOPV_Operator%20Response%20to%20Notice_11302022_(22-233368).pdf

12022070NOPV_PCO_11032022_(22-233368).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022070NOPV/12022070NOPV_PCO_11032022_(22-233368).pdf

12022070NOPV_PCO_11032022_(22-233368)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12022070NOPV/12022070NOPV_PCO_11032022_(22-233368)_text.pdf

12022070NOPV_Final Order_01102023_(22-233368)_text.pdf

January 10, 2023
VIA ELECTRONIC MAIL TO: francois poirier@tcenergy.com
François Poirier
President and Chief Executive Officer
TC Energy Corporation
450 1st Street SW
Calgary, Alberta T2P5H1
Re: CPF No. 1-2022-070-NOPV
Dear Mr. Poirier:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken by Tuscarora Gas Transmission Company, a
subsidiary of TC Energy Corporation, to comply with the pipeline safety regulations. When the
terms of the compliance order are completed, as determined by the Director, Eastern Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the
date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Robert Burrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA
Mr. Daniel C. Cerkoney, Interim Director, U.S. Regulatory Compliance, TC Energy
Corporation, dan_cerkoney@tcenergy.com
Mr. Stanley Chapman, III, Executive Vice President, U.S. and Mexico Natural Gas
Pipelines, TC Energy Corporation, stan_chapman_iii@tcenergy.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
_____________________________________
In the Matter of )
Tuscarora Gas Transmission Company, ) CPF No. 1-2022-070-NOPV
a subsidiary of TC Energy Corporation, )
)
)
)
Respondent. )
_____________________________________)
FINAL ORDER
On November 3, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Eastern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Tuscarora Gas
Transmission Company (Respondent), a subsidiary of TC Energy Corporation. The Notice
proposed finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part
192. The Notice also proposed certain measures to correct the violation. In its November 30, 2022
response to the Notice, TC Energy Corporation, on behalf of Respondent, did not contest the
allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.605(a) (Item 1) ─ Respondent failed to follow its manual of
written procedures for conducting operations and maintenance activities.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 10, 2023
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

12022070NOPV_Closure Letter_09142023_(22-233368)_text.pdf

VIA ELECTRONIC MAIL TO: stanley chapman iii@tcenergy.com
September 14, 2023
Mr. Stanley Chapman
Executive Vice President, US & Mexico Natural Gas Pipelines
Tuscarora Gas Transmission Company
700 Louisiana Street
Houston, Texas 77002
CPF 1-2022-070-NOPV
Dear Mr. Chapman:
On November 3, 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued Tuscarora Gas Transmission Company (Tuscarora) a Notice of Probable Violation in the
above-referenced case. A Final Order (Order) was then issued on January 10, 2023, which included
a Compliance Order. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Cc: Daniel Cerkoney <dan_cerkoney@tcenergy.com>
Amy Willis amy_willis@tcenergy.com