# ADELPHIA GATEWAY, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 12023008NOPV
- **title:** ADELPHIA GATEWAY, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-06-15
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.707(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023008nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023008nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023008nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12023008NOPV
**body:**

Notice of Probable Violation involving ADELPHIA GATEWAY, LLC. PHMSA's enforcement data identifies the cited regulation as 192.707(c). The case was opened on 2023-06-15 and is reported as closed as of 2024-03-05. Proposed civil penalty: $56,600. Assessed civil penalty: $56,600. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12023008NOPV_Final Order_03052024_(20-187757).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023008NOPV/12023008NOPV_Final%20Order_03052024_(20-187757).pdf

12023008NOPV_Final Order_03052024_(20-187757)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023008NOPV/12023008NOPV_Final%20Order_03052024_(20-187757)_text.pdf

12023008NOPV_Operator Response to Notice_07142023_(20-187757).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023008NOPV/12023008NOPV_Operator%20Response%20to%20Notice_07142023_(20-187757).pdf

12023008NOPV_PCO PCP_06152023_(20-187757).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023008NOPV/12023008NOPV_PCO%20PCP_06152023_(20-187757).pdf

12023008NOPV_PCO PCP_06152023_(20-187757)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023008NOPV/12023008NOPV_PCO%20PCP_06152023_(20-187757)_text.pdf

12023008NOPV_Final Order_03052024_(20-187757)_text.pdf

March 5, 2024
VIA ELECTRONIC MAIL TO: grichman@njresources.com
Ms. Ginger Richman
President
Adelphia Gateway, LLC
1415 Wyckoff Road
P.O. Box 1464
Wall, New Jersey 07719
Re: CPF No. 1-2023-008-NOPV
Dear Ms. Richman:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and assesses a civil penalty of $56,600. This is to acknowledge receipt of payment of
the full penalty amount, by wire transfer, dated July 14, 2023. It also finds that Adelphia
Gateway, LLC, has completed the actions specified in the Notice to comply with the pipeline
safety regulations. This enforcement action will close in 20 days. Service of the Final Order by
e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Robert Burrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA
Mr. Aaron Bass, Director of Engineering, Integrity, and Compliance, Adelphia Gateway,
abass@njresources.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Adelphia Gateway, LLC, ) CPF No. 1-2023-008-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From June 1 to June 2, 2022, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
inspected Adelphia Gateway, LLC’s (Respondent or Adelphia) pipeline project in Montgomery
County, Pennsylvania. Adelphia is an 84-mile-long interstate pipeline in eastern Pennsylvania
that extends from Lower Mount Bethel Township in North Hampton County to Marcus Hook in
Delaware County.1 Respondent is owned and operated by NJR Midstream, also known as
Storage and Transportation.2
As a result of the inspection, the Director, Eastern Region, OPS (Director), issued to Respondent,
by letter dated June 15, 2023, a Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that Adelphia had committed one violation of 49 C.F.R. Part 192 and proposed
assessing a civil penalty of $56,600 for the alleged violation. The Notice also proposed ordering
Respondent to take certain measures to correct the alleged violation.
Adelphia responded to the Notice by letter dated July 14, 2023 (Response). Respondent did not
contest the allegation of violation or the proposed compliance order, but did request that the
proposed civil penalty be reduced. Respondent did not request a hearing and therefore has
waived its right to one.
1 About Us, ADELPHIA GATEWAY, https://www.adelphiagateway.com/about/index.aspx (last
accessed October 24, 2023).
2 Id.



FINDING OF VIOLATION
In its Response, Adelphia did not contest the allegation in the Notice that it violated 49 C.F.R.
Part 192, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.707(c), which states:
§ 192.707 Line markers for mains and transmission lines.
(a) ….
(c) Pipelines aboveground. Line markers must be placed and
maintained along each section of a main and transmission line that is located
aboveground in an area accessible to the public.
The Notice alleged that Respondent violated 49 C.F.R. § 192.707(c) by failing to place line
markers along sections of transmission line facilities located aboveground in an area accessible
to the public. Specifically, the Notice alleged that Adelphia failed to place line markers noting
the required content, including warnings, name of operator and contact telephone number at the
Perkiomen main line valve (MLV) site and the East Perkiomen MLV site locations, which are
located on Adelphia’s 18-inch diameter southern portion mainline.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Adelphia violated 49 C.F.R. § 192.707(c) by failing to place line
markers along sections of transmission line facilities located aboveground in an area accessible
to the public.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.3
In determining the amount of a civil penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I
must consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; any effect that the penalty may have on its ability to continue
doing business; the good faith of Respondent in attempting to comply with the pipeline safety
regulations; and self-disclosure or actions to correct a violation prior to discovery by PHMSA.
In addition, I may consider the economic benefit gained from the violation without any reduction
because of subsequent damages, and such other matters as justice may require.
3 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223 for adjusted
amounts.



Item 1: The Notice proposed a civil penalty of $56,600 for Respondent’s violation of 49 C.F.R.
§ 192.707(c), for failing to place line markers along sections of transmission line facilities
located aboveground in an area accessible to the public. In its Response, Adelphia requested a
reduction of the civil penalty based on its “development and implementation of a comprehensive
compliance program” and “enactment of damage prevention initiatives.” Adelphia’s Response
included photos of newly installed line markers at the cited facilities (dated after the inspection),
a list of locations of newly installed line markers, a purchase order evidencing line marker supply
purchases, and a statement that it had either repaired, replaced, or added over 120 pipeline
markers, including those required by the proposed compliance order. Respondent further stated
that it “continues to execute a pipeline marker repair, replacement, remediation, and
enhancement program.”
PHMSA appreciates respondent’s execution of “a pipeline marker repair, replacement,
remediation, and enhancement program” and its other described initiatives, per the Response,
however, those actions occurred after PHMSA’s inspection. The correction of pipeline safety
violations identified during or after an inspection, but potentially prior to PHMSA’s issuance of a
Notice of Probable Violation, is not a basis to reduce a civil penalty. Adelphia’s Response did
not set forth any other argument indicating that any of the factors selected in the determination of
the proposed civil penalty were incorrect, or that the points assigned for these factors in the civil
penalty worksheet warrant adjustment.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $56,600 for violation of 49 C.F.R. § 192.707(c). This amount was
paid in full by wire transfer on July 14, 2023.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice for the violation of
49 C.F.R. § 192.707(c). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of gas or who owns or operates a pipeline facility is required to comply with the
applicable safety standards established under chapter 601. The Director indicates that
Respondent has taken the following actions specified in the proposed compliance order:
1. With respect to the violation of § 192.707(c) (Item 1), Respondent has installed
proper line markers in accordance with 49 C.F.R. § 192.707 at its Perkiomen and East
Perkiomen sites and at all other aboveground natural gas facilities it owns and/or
operates.
Accordingly, I find that compliance has been achieved with respect to this violation. Therefore,
the compliance terms proposed in the Notice are not included in this Order.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than



20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
March 5, 2024
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety