# ADELPHIA GATEWAY, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 12023022NOPV
- **title:** ADELPHIA GATEWAY, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-04-13
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.481(c), 192.605(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023022nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023022nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023022nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12023022NOPV
**body:**

Notice of Probable Violation involving ADELPHIA GATEWAY, LLC. PHMSA's enforcement data identifies the cited regulations as 192.481(c),  192.605(a). The case was opened on 2023-04-13 and is reported as closed as of 2024-06-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12023022NOPV_Closure Letter_06272024_(22-234207).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023022NOPV/12023022NOPV_Closure%20Letter_06272024_(22-234207).pdf

12023022NOPV_Closure Letter_06272024_(22-234207)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023022NOPV/12023022NOPV_Closure%20Letter_06272024_(22-234207)_text.pdf

12023022NOPV_Final Order_06232023_(22-234207).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023022NOPV/12023022NOPV_Final%20Order_06232023_(22-234207).pdf

12023022NOPV_Final Order_06232023_(22-234207)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023022NOPV/12023022NOPV_Final%20Order_06232023_(22-234207)_text.pdf

12023022NOPV_Operator Response to Notice_05112023_(22-234207).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023022NOPV/12023022NOPV_Operator%20Response%20to%20Notice_05112023_(22-234207).pdf

12023022NOPV_PCO_04132023_(22-234207).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023022NOPV/12023022NOPV_PCO_04132023_(22-234207).pdf

12023022NOPV_PCO_04132023_(22-234207)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023022NOPV/12023022NOPV_PCO_04132023_(22-234207)_text.pdf

12023022NOPV_Final Order_06232023_(22-234207)_text.pdf

June 23, 2023
VIA ELECTRONIC MAIL: grichman@njresources.com
Ms. Ginger Richman
President
Adelphia Gateway, LLC
1416 Wyckoff Road
P.O. Box 1464
Wall, New Jersey 07719
Re: CPF No. 1-2023-022-NOPV
Dear Ms. Richman:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Eastern Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Robert Burrough Director, Eastern Region, Office of Pipeline Safety, PHMSA
Mr. Aaron Bass, Director, Engineering, Compliance, and Integrity, Adelphia Gateway,
ajbass@njresources.com



Mr. Ananda Kanapathy, Managing Director, Midstream Operations, Adelphia Gateway,
akanapathy@njresources.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Adelphia Gateway, LLC ) CPF No. 1-2023-022-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On April 13, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Eastern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Adelphia Gateway,
LLC (Respondent). The Notice proposed finding that Respondent had violated the pipeline
safety regulations in 49 C.F.R. Part 192. The Notice also proposed certain measures to correct
the violation. Respondent did not contest the allegations of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.605(a) (Item 2) ─ Respondent failed to follow its Operations and
Maintenance Manual, issued February 2021, Section 3.3.10 (Flange Installation
Specification), by not installing stud bolts on flange joints at the G75 Valve
Setting with at least one thread visible on each end of a stud bolt.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



Warning Items
With respect to Items 1, 3, 4 and 5, the Notice alleged probable violations of 49 C.F.R.
§§ 192.481(c), and 192.605(a), respectively, but did not propose a civil penalty or compliance
order for these items. Therefore, these are considered to be warning items. If OPS finds a
violation of any of these items in a subsequent inspection, Respondent may be subject to future
enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
June 23, 2023
__________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

12023022NOPV_Closure Letter_06272024_(22-234207)_text.pdf

VIA EMAIL: grichman@njresources.com
June 27, 2024
Ms. Ginger Richman
President
Adelphia Gateway, LLC
1416 Wyckoff Road
PO BOX 1464
Wall, New Jersey 07719
CPF 1-2023-022-NOPV
Dear Ms. Richman:
On June 23, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Adelphia Gateway, LLC, a Final Order in the above-referenced case. This Order included a
Compliance Order. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Cc: Aaron Bass: < abass@njresources.com >
- **truncated:** false
- **body characters:** 6472
