# NORTH BAJA PIPELINE LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 12023060NOA
- **title:** NORTH BAJA PIPELINE LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-11-09
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.303.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023060noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023060noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12023060noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12023060NOA
**body:**

Notice of Amendment involving NORTH BAJA PIPELINE LLC. PHMSA's enforcement data identifies the cited regulation as 192.303. The case was opened on 2023-11-09 and is reported as closed as of 2023-12-19. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12023060NOA_Closure Letter_12192023_(23-266296).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023060NOA/12023060NOA_Closure%20Letter_12192023_(23-266296).pdf

12023060NOA_Closure Letter_12192023_(23-266296)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023060NOA/12023060NOA_Closure%20Letter_12192023_(23-266296)_text.pdf

12023060NOA_Notice of Amendment_11092023_(23-266296).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023060NOA/12023060NOA_Notice%20of%20Amendment_11092023_(23-266296).pdf

12023060NOA_Notice of Amendment_11092023_(23-266296)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023060NOA/12023060NOA_Notice%20of%20Amendment_11092023_(23-266296)_text.pdf

12023060NOA_Operator Response to Notice _12052023_(23-266296).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023060NOA/12023060NOA_Operator%20Response%20to%20Notice%20_12052023_(23-266296).pdf

12023060NOA_Closure Letter_12192023_(23-266296)_text.pdf

VIA ELECTRONIC MAIL TO: tina faraca@tcenergy.com
December 19, 2023
Ms. Tina Faraca
Executive Vice-President & President, U.S. Natural Gas Pipelines
North Baja Pipeline, LLC., a subsidiary of TC Energy Corporation
700 Louisiana Street
Houston, Texas 77002
CPF 1-2023-060-NOA
Dear Ms. Faraca:
From March 14, 2023 to March 16, 2023, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of North Baja Pipeline, LLC’s (North Baja)
procedures in Charleston, WV. As a result of the inspection, North Baha was issued a Notice of
Amendment on November 9, 2023, which proposed amendment of your procedures.
TC Energy, on behalf of its subsidiary, North Baja Pipeline, LLC, submitted its amended
procedures on December 5, 2023. My staff reviewed the amended procedures, and it appears that
the inadequacies outlined in this Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
P.P
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Cc: Daniel Cerkoney <dan_cerkoney@tcenergy.com>
Amy Willis <amy_willis@tcenergy.com>

12023060NOA_Notice of Amendment_11092023_(23-266296)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
November 9, 2023
Ms. Tina Faraca
Executive Vice-President & President, U.S. Natural Gas Pipelines
North Baja Pipeline, LLC., a subsidiary of TC Energy Corporation
700 Louisiana Street
Houston, Texas 77002
CPF 1-2023-060-NOA
Dear Ms. Faraca:
From March 14, 2023 to March 16, 2023, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected North Baja Pipeline, LLC’s (North Baja) procedures for construction in Charleston, WV
during the on-site combined TC Energy construction inspection kick-off meeting,
As a result of the inspection, PHMSA has identified the apparent inadequacy found within North
Baja’s plans or procedures. The item inspected and the inadequacy is described below:
1. § 192.303 Compliance with specifications or standards.
Each transmission line or main must be constructed in accordance
with comprehensive written specifications or standards that are
consistent with this part.
North Baja’s written specifications or standards required by §§ 192.303 and 192.167(a)(4)1 are
inadequate to assure pipeline safety. Specifically, the North Baja’s procedure TEN-PE-FCSTD-G
1 § 192.167 Compressor stations: Emergency shutdown.
(a) Except for unattended field compressor stations of 1,000 horsepower (746 kilowatts) or less, each compressor
station must have an emergency shutdown system that meets the following:
(1) …
(4) It must be operable from at least two locations, each of which is:
(i) Outside the gas area of the station;
(ii) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced; and
(iii) Not more than 500 feet (153 meters) from the limits of the station.



Compressor Station Facility Design (US), Item ID: 1020406812, Rev.: 00, Approval Date: 2022-
Jan-18 (TC Energy Compressor Station Design Specifications or Specifications), did not specify
the requirements for locating the compressor station emergency shutdown system that is operable
from at least two locations, as required by § 192.167(a)(4).
During the inspection, PHMSA requested written specifications requiring that compressor station
emergency shutdown systems meet the requirements of § 192.167. North Baja presented TC
Energy Compressor Station Design Specifications; however, the Specifications did not detail the
requirements of § 192.167(a)(4).
Therefore, North Baja’s written specifications or standards required by §§ 192.303
and 192.167(a)(4) are inadequate to assure pipeline safety.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that North Baja Pipeline, LLC maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, Eastern Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF 1-2023-060-NOA and, for each document you submit, please provide a copy in
electronic format whenever possible.



Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
- **truncated:** false
- **body characters:** 7740