# COOK INLET NATURAL GAS STORAGE ALASKA — Warning Letter

- **operation:** document
- **citation:** CPF 12024012WL
- **title:** COOK INLET NATURAL GAS STORAGE ALASKA — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-02-15
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.12(b)(2), 192.12(c), 192.12(d)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024012wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024012wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024012wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12024012WL
**body:**

Warning Letter involving COOK INLET NATURAL GAS STORAGE ALASKA. PHMSA's enforcement data identifies the cited regulations as 192.12(b)(2),  192.12(c),  192.12(d)(4). The case was opened on 2024-02-15 and is reported as closed as of 2024-02-15. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12024012WL_Warning Letter_02152024_(23-264027).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024012WL/12024012WL_Warning%20Letter_02152024_(23-264027).pdf

12024012WL_Warning Letter_02152024_(23-264027)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024012WL/12024012WL_Warning%20Letter_02152024_(23-264027)_text.pdf

12024012WL_Warning Letter_02152024_(23-264027)_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
February 15, 2024
Mr. Stephen Ratcliff
President and Chief Executive Officer
Cook Inlet Natural Gas Storage Alaska
188 West Northern Lights Blvd, Suite 510
Anchorage, Alaska 99503
CPF 1-2024-012-WL
Dear Mr. Ratcliff:
From June 13 to June 15, 2023, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected Cook
Inlet Natural Gas Storage Alaska’s (CINGSA) procedures and records for the Cook Inlet Natural Gas
Storage Alaska Facility in Kenai Peninsula, Alaska.
As a result of the inspection, it is alleged that you have committed probable violations of the Pipeline
Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected and the probable
violations are:
1. § 192.12 Underground natural gas storage facilities.
(a) ...
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) ...
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or before
July 18, 2017, must meet the provisions of API RP 1171 (incorporated by
reference, see § 192. 7), sections 8, 9, 10, and 11, and paragraph (c) of this
section, by January 18, 2018, and must meet all provisions of paragraph
(d) of this section by March 13, 2021.
CINGSA failed to meet the provisions of API RP 1171, Section 9. Specifically, CINGSA failed to
perform production casing downhole inspections for the initial mechanical integrity assessment of
storage wells in accordance with API RP 1171, Section 9.3.1 (Section 9.3.1).



Section 9.3.1 states in part, “Active well mechanical integrity evaluations shall include initial and
subsequent evaluations as determined using the risk assessment and the information derived from the
initial evaluation.”
CINGSA’s Storage Integrity Management Program (Well and Reservoir), Standard 2847 Well
Integrity Inspection, section 5.1 (Well Integrity Evaluation [API RP 1171 9.3.1]) stated in part “Well
integrity evaluation methods typically used by the Company include but are not limited to review of
design, completion, and well work records; wellhead and downhole inspection; well pressure
monitoring and testing; and gas and liquid sampling.”
CINGSA’s Storage Integrity Management Program (Well and Reservoir), Standard 2847 Well
Integrity Inspection, section 9 (Frequency of Inspection [API RP 1171 6.9.2]) stated in part “If a well
has not previously been subjected to any kind of downhole inspection, a baseline inspection of casing
will be scheduled and prioritized on a data-informed, risk-driven basis.”
During the inspection, PHMSA requested to review CINGSA’s well integrity evaluations. CINGSA
indicated that baseline integrity management risk assessments had been completed for all wells.
However, there were no well records of initial production casing downhole inspections and no baseline
inspection of this casing had been conducted. The inspection results are required to be used along with
the well’s risk assessment to determine frequency of subsequent mechanical integrity evaluations of
the casing in accordance with § 192.12(d)(3).
Therefore, CINGSA failed to meet the provisions of Section 9.3.1.
2. § 192.12 Underground natural gas storage facilities.
(a) ...
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) ...
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or before
July 18, 2017, must meet the provisions of API RP 1171 (incorporated by
reference, see § 192. 7), sections 8, 9, 10, and 11, and paragraph (c) of this
section, by January 18, 2018, and must meet all provisions of paragraph
(d) of this section by March 13, 2021.
CINGSA failed to meet the provisions of API RP 1171, Section 9. Specifically, CINGSA records did
not demonstrate that the operation of the master valve and wellhead pipeline isolation valve indicated
ability to isolate the well in accordance with API RP 1171, Section 9.3.2 (Section 9.3.2).
Section 9.3.2 states in part “The operator shall test the operation of the master valve and wellhead
pipeline isolation valve at least annually for proper function and ability to isolate the well.”
During the inspection, PHMSA reviewed CINGSA’s records of wellhead valve testing. These records
did not include isolation testing of the storage wells in 2018, 2019, and 2020. CINGSA stated valve
isolation testing was being done from 2018 to 2020 but was added into records as of 2021.
Therefore, CINGSA failed to meet the provisions of Section 9.3.2.



3. § 192.12 Underground natural gas storage facilities.
(a) ...
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) ...
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or before
July 18, 2017, must meet the provisions of API RP 1171 (incorporated by
reference, see § 192. 7), sections 8, 9, 10, and 11, and paragraph (c) of this
section, by January 18, 2018, and must meet all provisions of paragraph
(d) of this section by March 13, 2021.
CINGSA failed to meet the provisions of § 192.12(c) by January 18, 2018. Specifically, several of
CINGSA’s operations and maintenance manuals within its Storage Integrity Management Plan were
not created until 2021, past the January 18, 2018, deadline required by § 192.12(b)(2).
Section 192.12(c) requires in part that “each operator of a UNGSF must prepare and follow for each
facility one or more manuals of written procedures for conducting operations, maintenance, and
emergency preparedness and response activities under paragraphs (a) and (b) of this section.”
During the inspection, CINGSA’s O&M Manuals were reviewed such as CINGSA Inventory
Verification SOP 2837 and CINGSA Well Integrity Inspection SOP 2847. PHMSA determined that
these manuals had not been reviewed in 2019 and 2020 due to the fact they were not created until 2021.
In addition, CINGSA was unable to provide review and update record of CINGSA Well Pad Integrity
Inspections SOP 2805 during 2021.
Therefore, CINGSA failed to meet the requirements of § 192.12(c) by January 18, 2018, as required
by § 192.12(b)(2).
4. § 192.12 Underground natural gas storage facilities.
(a) ...
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) ...
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or before
July 18, 2017, must meet the provisions of API RP 1171 (incorporated by
reference, see § 192. 7), sections 8, 9, 10, and 11, and paragraph (c) of this
section, by January 18, 2018, and must meet all provisions of paragraph
(d) of this section by March 13, 2021.
CINGSA failed to meet the provisions of API RP 1171, Section 8. Specifically, CINGSA failed to
assess threat and hazard interaction in accordance with API RP 1171, Section 8.3.2 (Section 8.3.2).
Section 8.3.2 states in part:
The operator shall use available information such as performance data collected through
the field history, operations and maintenance (O&M) activities, geotechnical data such
as well logs, engineering data, and completion reports to determine susceptibility to
threat and hazard-related events and to assess threat and hazard interaction.



During the inspection, CINGSA’s risk management model was reviewed. CINGSA’s Risk Model V8,
March 2023 had no categories considering threat and hazard interactions within it.
Therefore, CINGSA failed to meet the provisions of Section 8.3.2.
5. § 192.12 Underground natural gas storage facilities.
(a) ...
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs.
(1) ...
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or before
July 18, 2017, must meet the provisions of API RP 1171 (incorporated by
reference, see § 192. 7), sections 8, 9, 10, and 11, and paragraph (c) of this
section, by January 18, 2018, and must meet all provisions of paragraph
(d) of this section by March 13, 2021.
CINGSA failed to meet the provisions of API RP 1171, Section 8. Specifically, CINGSA failed to
assess the effectiveness of risk monitoring and risk management programs in accordance with API RP
1171, Section 8.7.1 (Section 8.7.1).
Section 8.7.1 states in part, “The operator shall assess the effectiveness of risk monitoring and risk
management programs and maintain a continual review and improvement cycle in risk management
activities to provide functional integrity of the storage operation.”
During the inspection, CINGSA failed to provide any records demonstrating that a risk management
effectiveness review and improvement cycles had been performed from 2019 to 2022.
Therefore, CINGSA failed to meet the provisions of Section 8.7.1.
6. § 192.12 Underground natural gas storage facilities.
(a) ...
(c) Procedural manuals. Each operator of a UNGSF must prepare and
follow for each facility one or more manuals of written procedures for
conducting operations, maintenance, and emergency preparedness and
response activities under paragraphs (a) and (b) of this section. Each
operator must keep records necessary to administer such procedures and
review and update these manuals at intervals not exceeding 15 months, but
at least once each calendar year. Each operator must keep the appropriate
parts of these manuals accessible at locations where UNGSF work is being
performed. Each operator must have written procedures in place before
commencing operations or beginning an activity not yet implemented.
CINGSA failed to follow its manual of written procedures for conducting activities under
§ 192.12(b)(2). Specifically, CINGSA failed to follow its Standard Operating Procedures Manual,
ENSTAR Emergency Operating Plan, SOP #1105 (SOP 1105) regarding performing annual training.
API RP 1171, Section 10.6.2 states in part, “Storage operations and applicable staff shall receive
training in the use of the emergency preparedness/response plan.” CINGSA’s SOP 1105 stated in part



under policy “All ENSTAR personnel will be trained annually, and their knowledge evaluated on this
plan.”
During the inspection, CINGSA was not able to provide emergency operating plan training records of
staff personnel conducted annually in 2018. Additionally, although this training was conducted
annually in 2022, the records indicated that 1 person was missing from the training.
Therefore, CNGSA failed to follow its manual of written procedures as required by § 192.12(c).
7. § 192.12 Underground natural gas storage facilities.
(a) …
(d) Integrity management program—
(1) …
(4) Integrity management procedures and recordkeeping. Each UNGSF
operator must establish and follow written procedures to carry out its
integrity management program under API RP 1171 (incorporated by
reference, see § 192.7), section 8 ("Risk Management for Gas Storage
Operations"), and this paragraph (d). The operator must also maintain,
for the useful life of the UNGSF, records that demonstrate compliance
with the requirements of this paragraph (d). This includes records
developed and used in support of any identification, calculation,
amendment, modification, justification, deviation, and determination
made, and any action taken to implement and evaluate any integrity
management program element.
CINGSA failed to maintain records demonstrating compliance with the requirements of § 192.12(d).
Specifically, CINGSA risk management records did not demonstrate that potential threats and hazards
impacting storage wells were adequately evaluated in accordance with API RP 1171, Section 8.4.2
(Section 8.4.2).
Section 8.4.2 states in part, “The operator shall evaluate the potential threats and hazards impacting
storage wells and reservoirs.”
During the inspection, PHMSA reviewed CINGSA’s risk model. CINGSA Risk Model V8 March
2023 broke down risk into 3 categories: Well risk, Reservoir risk and Surface risk. Each category had
several threats/hazards and consequences that were not able to be reviewed to determine if adequate
evaluation of them was done, such as the factors or data leading to their scoring. CINGSA Risk
Management Plan stated subject matter experts (SME) were used for qualitative scoring for these but
did not have details on how components within each threat/hazard or consequence were evaluated and
what scores were obtained for them. There were no records of SME meeting minutes pertaining to
these discussions of threat/hazard and consequence evaluation. Some examples of components within
threats/hazards for which scoring was not able to be reviewed were: Well Threats- Corrosion, Well
Components, Natural Forces; Reservoir Threats- Third Party Damage, Natural forces; Surface risk
Threats- Natural forces such as earthquake; Reservoir Third Party Damage- third party drilling, third
party production and third-party injection.
Therefore, CINGSA failed to maintain records demonstrating compliance with the requirements of
§ 192.12(d).



Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$257,664 per violation per day the violation persists, up to a maximum of $2,576,627 for a related
series of violations. For violation occurring on or after March 21, 2022 and before January 6, 2023,
the maximum penalty may not exceed $239,142 per violation per day the violation persists, up to a
maximum of $2,391,142 for a related series of violations. For violation occurring on or after May 3,
2021 and before March 21, 2022, the maximum penalty may not exceed $225,134 per violation per
day the violation persists, up to a maximum of $2,251,334 for a related series of violations. For
violation occurring on or after January 11, 2021 and before May 3, 2021, the maximum penalty may
not exceed $222,504 per violation per day the violation persists, up to a maximum of $2,225,034 for a
related series of violations. For violation occurring on or after July 31, 2019 and before January 11,
2021, the maximum penalty may not exceed $218,647 per violation per day the violation persists, up
to a maximum of $2,186,465 for a related series of violations. For violation occurring on or after
November 27, 2018 and before July 31, 2019, the maximum penalty may not exceed $213,268 per
after November 2, 2015 and before November 27, 2018, the maximum penalty may not exceed
violation per day, with a maximum penalty not to exceed $2,132,679. For violation occurring on or
$209,002 per violation per day, with a maximum penalty not to exceed $2,090,022.
We have reviewed the circumstances and supporting documents involved in this case, and have decided
not to conduct additional enforcement action or penalty assessment proceedings at this time. We advise
you to correct the items identified in this letter. Failure to do so will result in Cook Inlet Natural Gas
Storage Alaska being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to CPF
1-2024-012-WL. Be advised that all material you submit in response to this enforcement action is
subject to being made publicly available. If you believe that any portion of your responsive material
qualifies for confidential treatment under 5 U.S.C. § 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for confidential
treatment redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. § 552(b).
Sincerely,
Robert Burrough
Director, Eastern Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false