- **published on:** 2024-04-23
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.12(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024030noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024030noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024030noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12024030NOA
**body:**

Notice of Amendment involving PACIFIC GAS & ELECTRIC CO. PHMSA's enforcement data identifies the cited regulation as 192.12(b)(2). The case was opened on 2024-04-23 and is reported as closed as of 2024-06-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12024030NOA_Closure Letter_06112024_(23-265082).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024030NOA/12024030NOA_Closure%20Letter_06112024_(23-265082).pdf

12024030NOA_Closure Letter_06112024_(23-265082)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024030NOA/12024030NOA_Closure%20Letter_06112024_(23-265082)_text.pdf

12024030NOA_Notice of Amendment_04232024_(23-265082).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024030NOA/12024030NOA_Notice%20of%20Amendment_04232024_(23-265082).pdf

12024030NOA_Notice of Amendment_04232024_(23-265082)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024030NOA/12024030NOA_Notice%20of%20Amendment_04232024_(23-265082)_text.pdf

12024030NOA_Operator Response to Notice_05162024_(23-265082).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024030NOA/12024030NOA_Operator%20Response%20to%20Notice_05162024_(23-265082).pdf

12024030NOA_Closure Letter_06112024_(23-265082)_text.pdf

OVERNIGHT EXPRESS DELIVERY
June 11, 2024
Ms. Patricia Poppe
Chief Executive Officer
Pacific Gas & Electric Company
300 Lakeside Drive, 5th Floor
Oakland, California 94612
CPF 1-2024-030-NOA
Dear Ms. Poppe:
From June 5, 2023 to June 9, 2023, a State Inspector from the California Geologic Energy
Management Division (CalGEM), acting as an Agent for the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Pacific Gas & Electric Company’s (PGE) procedures for Los Medanos, McDonald
Island and Pleasant Creek Underground Natural Gas Storage Facilities (UNGSF) in Contra Costa,
San Joaquin, and Yolo counties, California, respectively. As a result of the inspection, PGE was
issued a Notice of Amendment on April 23, 2024, which proposed amendment of your procedures.
PGE submitted its amended procedures on May 16, 2024. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration



Cc: < Frances.Yee@pge.com>

12024030NOA_Notice of Amendment_04232024_(23-265082)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
April 23, 2024
Ms. Patricia Poppe
Chief Executive Officer
Pacific Gas & Electric Company
300 Lakeside Drive, 5th Floor
Oakland, California 94612
CPF 1-2024-030-NOA
Dear Ms. Poppe:
From June 5, 2023 to June 9, 2023, a State Inspector from the California Geologic Energy
Management Division (CalGEM), acting as an Agent for the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Pacific Gas & Electric Company’s (PGE) procedures for Los Medanos, McDonald
Island and Pleasant Creek Underground Natural Gas Storage Facilities (UNGSF) in Contra Costa,
San Joaquin, and Yolo counties, California, respectively.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
PG&E’s plans or procedures. The items inspected and the inadequacies are described below:
1. § 192.12 Underground natural gas storage facilities.
(a) ….
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs
(1) ….
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see § 192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
PG&E’s written procedures for underground natural gas storage were inadequate to assure safe



operation of a pipeline facility. Specifically, PG&E’s construction procedures required by
American Petroleum Institute Recommended Practice 1171 (2015) (API RP 1171), Section 11.2.1,
failed to adequately address API RP 1171, Section 6.2.3.
Section 11.2.1 of API RP 1171 states, in part, “The operator shall develop and follow procedures
for the construction, operation, and maintenance of natural gas storage wells and reservoirs to
establish and maintain functional integrity.”
Section 6.2.3 of API RP 1171 states, in part, “Wellhead equipment shall have operating pressure
ratings sufficient to exceed the maximum anticipated operating pressure.”
During the inspection, PHMSA reviewed PG&E’s Wellhead Equipment Design Standard UGS-
E1A-S. The process stated "Wellhead equipment operating pressure ratings shall exceed maximum
anticipated operating pressure [MAOP]" but did not detail the MAOPs and pressure ratings for
their assets or refer to the document that contained the information. PG&E also presented
q05_multi-bowl_wellhead_design_whitepaper that included both the field MAOPs and field-
specific minimum pressure ratings for wellhead components but was not referred to by the
procedure.
Therefore, PG&E’s construction procedures required by § 192.12(b)(2) and API RP 1171, Section
11.2.1 were inadequate regarding the requirements of API RP 1171, Section 6.2.3. PG&E must
revise its procedures to address the deficiency outlined above.
2. § 192.12 Underground natural gas storage facilities.
(a) ….
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs
(1) ….
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see § 192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
PG&E’s written procedures for underground natural gas storage were inadequate to assure safe
operation of a pipeline facility. Specifically, PG&E’s construction procedures required by API RP
1171, Section 11.2.1, failed to adequately address API RP 1171, Section 6.7.3.
Section 11.2.1 of API RP 1171 states, in part, “The operator shall develop and follow procedures
for the construction, operation, and maintenance of natural gas storage wells and reservoirs to
establish and maintain functional integrity.”
Section 6.7.3 of API RP 1171 states, in part, “The operator shall repair a failed plug; the operator
shall repair a well with any leak indication that may suggest a lack of isolation of the storage
reservoir.”



During the inspection, PHMSA reviewed PG&E’s UGS-E1D-S_Well Abandonment Standard and
UGS-AG-S_Well Work Requirements_20220201. The procedure paraphrased API RP 1171,
Section 6.7.3 but did not provide any detail of the plug repair or well repair process and did not
refer to the document that included the detailed process.
Therefore, PG&E’s construction procedures required by § 192.12(b)(2) and API RP 1171, Section
11.2.1 were inadequate regarding the requirements of API RP 1171, Section 6.7.3. PG&E must
revise its procedures to address the deficiency outlined above.
3. § 192.12 Underground natural gas storage facilities.
(a) ….
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs
(1) ….
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an
aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see § 192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
PG&E’s written procedures for underground natural gas storage were inadequate to assure safe
operation of a pipeline facility. Specifically, PG&E’s construction procedures required by API RP
1171, Section 11.2.1, failed to adequately address API RP 1171, Section 6.7.2.
Section 11.2.1 of API RP 1171 states, in part, “The operator shall develop and follow procedures
for the construction, operation, and maintenance of natural gas storage wells and reservoirs to
establish and maintain functional integrity.”
Section 6.7.2 of API RP 1171 states, in part, “The operator shall verify the presence and location
of a cement plug after the plug is set and has reached a sufficient compressive strength; the operator
shall correct deviations which may threaten isolation objectives of the plug.”
During the inspection, PHMSA reviewed PG&E’s UGS-E1D-S_Well Abandonment Standard
section 3.5. The procedure paraphrases API RP 1171, Section 6.7.2 but did not include the process
of how the location of the cement plug and how the sufficient compressive strength of the cement
plug would be verified nor included a reference to a document that included the process.
Therefore, PG&E’s construction procedures required by § 192.12(b)(2) and APR RP 1171, Section
11.2.1 were inadequate regarding the requirements of API RP 1171, Section 6.7.2. PG&E must
revise its procedures to address the deficiency outlined above.
4. § 192.12 Underground natural gas storage facilities.
(a) ….
(1) ….
(b) Depleted hydrocarbon and aquifer reservoir UNGSFs
(2) Each UNGSF that uses a depleted hydrocarbon reservoir or an



aquifer reservoir for natural gas storage and was constructed on or
before July 18, 2017, must meet the provisions of API RP 1171
(incorporated by reference, see § 192.7), sections 8, 9, 10, and 11, and
paragraph (c) of this section, by January 18, 2018, and must meet all
provisions of paragraph (d) of this section by March 13, 2021.
PG&E’s written procedures for underground natural gas storage were inadequate to assure safe
operation of a pipeline facility. Specifically, PG&E’s construction procedures required by API RP
1171, Section 11.2.1, failed to adequately address API RP 1171, Section 6.7.2.
Section 11.2.1 of API RP 1171 states in part, “The operator shall develop and follow procedures
for the construction, operation, and maintenance of natural gas storage wells and reservoirs to
establish and maintain functional integrity.”
Section 6.7.2 of API RP 1171 states in part, “The operator shall use cement plugs (see 6.4.3) and/or
mechanical plugs to isolate the storage zone from fluid migration. The use of hydrostatic pressure
as a sole means of isolation shall not be acceptable.”
During the inspection, PHMSA reviewed PG&E’s UGS-E1D-S_Well Abandonment Standard.
The procedure paraphrases API RP 1171, Section 6.7.2 but does not include detailed information
of cement or mechanical plugs to be used or refer to the document that included the specific of the
plugs to be used.
Therefore, PG&E’s construction procedures required by § 192.12(b)(2) and API RP 1171, Section
11.2.1 were inadequate regarding the requirements of API RP 1171, Section 6.7.2. PG&E must
revise its procedures to address the deficiency outlined above.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans



or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that PG&E maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures)
and submit the total to Robert Burrough, Director, Eastern Region, Pipeline and Hazardous
Materials Safety Administration. In correspondence concerning this matter, please refer to CPF 1-
2024-030-NOA and, for each document you submit, please provide a copy in electronic format
whenever possible.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
- **truncated:** false