# ANR PIPELINE CO — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 12024051NOPV
- **title:** ANR PIPELINE CO — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-07-05
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.303.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024051nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024051nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12024051nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12024051NOPV
**body:**

Notice of Probable Violation involving ANR PIPELINE CO. PHMSA's enforcement data identifies the cited regulation as 192.303. The case was opened on 2024-07-05 and is reported as closed as of 2024-11-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12024051NOPV_Closure Letter_11062024_(24-297439).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024051NOPV/12024051NOPV_Closure%20Letter_11062024_(24-297439).pdf

12024051NOPV_Closure Letter_11062024_(24-297439)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024051NOPV/12024051NOPV_Closure%20Letter_11062024_(24-297439)_text.pdf

12024051NOPV_Final Order_09052024_(24-297439).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024051NOPV/12024051NOPV_Final%20Order_09052024_(24-297439).pdf

12024051NOPV_Final Order_09052024_(24-297439)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024051NOPV/12024051NOPV_Final%20Order_09052024_(24-297439)_text.pdf

12024051NOPV_Operator Response to Notice_08012024_(24-297439).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024051NOPV/12024051NOPV_Operator%20Response%20to%20Notice_08012024_(24-297439).pdf

12024051NOPV_PCO_07052024_(24-297439).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024051NOPV/12024051NOPV_PCO_07052024_(24-297439).pdf

12024051NOPV_PCO_07052024_(24-297439)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12024051NOPV/12024051NOPV_PCO_07052024_(24-297439)_text.pdf

12024051NOPV_Final Order_09052024_(24-297439)_text.pdf

September 5, 2024
VIA ELECTRONIC MAIL TO: tina faraca@tcenergy.com
Tina Faraca
Executive Vice President and President
U.S. Natural Gas Pipelines
TC Energy Corporation
700 Louisiana Street, Suite 700
Houston, Texas 77002
Re: CPF No. 1-2024-051-NOPV
Dear Ms. Faraca:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken by ANR Pipeline Company, a subsidiary of
TC Energy Corporation, to comply with the pipeline safety regulations. When the terms of the
compliance order are completed, as determined by the Director, Eastern Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the
date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Robert Borrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA
Ms. Amy Willis, Director, Pipeline Safety Compliance, U.S. Natural Gas, TC Energy,
amy_willis@tcenergy.com
Mr. Dan Cerkoney, Senior Manager, Regulatory Compliance, TC Energy Corporation,
dan_cerkoney@tcenergy.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
_____________________________________
In the Matter of )
ANR Pipeline Company, ) CPF No. 1-2024-051-NOPV
a subsidiary of TC Energy Corporation, )
)
)
)
Respondent. )
_____________________________________)
FINAL ORDER
On July 5, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Eastern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to ANR Pipeline Company
(ANR or Respondent). The Notice proposed finding that Respondent had violated the pipeline
safety regulations in 49 C.F.R. Part 192. The Notice also proposed certain measures to correct
the violation. TC Energy Corporation, ANR’s parent company, responded on behalf of ANR.
Respondent did not contest the allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.303 (Item 1) ─ Respondent failed to construct its pipeline in
accordance with the requirements and standards of Subpart G of 49 CFR Part 192.
Specifically, ANR failed to install valves adequately meeting the minimum
requirements of the American Petroleum Institute (API), Specification ANSI/API
6D, as required by § 192.145(a) and incorporated by reference in § 192.7(b)(8).
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to



comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
September 5, 2024
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

12024051NOPV_Closure Letter_11062024_(24-297439)_text.pdf

VIA ELECTRONIC MAIL TO: tina faraca@tcenergy.com
November 6, 2024
Ms. Tina Faraca
President and Chief Executive Officer
ANR Pipeline Company
a subsidiary of TC Energy Corporation
700 Louisiana Street, Suite 700
Houston, Texas 77002
CPF 1-2024-051-NOPV
Dear Ms. Faraca:
On September 5, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to ANR Pipeline Co., a Final Order in the above-referenced case. This Order included a
Compliance Order. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
CC: Amy Willis <amy_willis@tcenergy.com>
Dan Cerkoney <dan_cerkoney@tcenergy.com>