# NGO TRANSMISSION, INC. — Notice of Amendment

- **operation:** document
- **citation:** CPF 12025010NOA
- **title:** NGO TRANSMISSION, INC. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-05-09
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.12(c), 192.12(d)(1)(i), 192.12(d)(2), 192.12(d)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-12025010noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-12025010noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-12025010noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/12025010NOA
**body:**

Notice of Amendment involving NGO TRANSMISSION, INC.. PHMSA's enforcement data identifies the cited regulations as 192.12(c),  192.12(d)(1)(i),  192.12(d)(2),  192.12(d)(4). The case was opened on 2025-05-09 and is reported as closed as of 2025-07-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12025010NOA_Closure Letter_07112025_(24-295906).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025010NOA/12025010NOA_Closure%20Letter_07112025_(24-295906).pdf

12025010NOA_Closure Letter_07112025_(24-295906)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025010NOA/12025010NOA_Closure%20Letter_07112025_(24-295906)_text.pdf

12025010NOA_Notice of Amendment_05092025_(24-295906).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025010NOA/12025010NOA_Notice%20of%20Amendment_05092025_(24-295906).pdf

12025010NOA_Notice of Amendment_05092025_(24-295906)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025010NOA/12025010NOA_Notice%20of%20Amendment_05092025_(24-295906)_text.pdf

12025010NOA_Operator Response to Notice_06062025_(24-295906).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025010NOA/12025010NOA_Operator%20Response%20to%20Notice_06062025_(24-295906).pdf

12025010NOA_Closure Letter_07112025_(24-295906)_text.pdf

VIA ELECTRONIC MAIL TO: dan mcvey@theenergycoop.com
July 11, 2025
Mr. Dan McVey
Vice President and Chief Operating Officer
NGO Transmission, Inc.
1500 Grandville Road
Newark, Ohio 43058
CPF 1-2025-010-NOA
Dear Mr. McVey:
From June 24 through June 27, 2024, a representative from the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
inspected NGO Transmission, Inc.’s (NGO) underground natural gas storage (UNGS) procedures
for the Perry, Muskie, and Zane storage fields in Perry County and Muskingum County, Ohio. As
a result of the inspection, NGO was issued a Notice of Amendment on May 9, 2025, requiring NGO
to amend certain aspects of its procedures.
On June 6, 2025, NGO submitted its amended procedures. My staff reviewed the amended procedures,
and it appears that the inadequacies outlined in this Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for
your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

12025010NOA_Notice of Amendment_05092025_(24-295906)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: dan Mcvey@theenergycoop.com
May 9, 2025
Mr. Dan McVey
Vice President and Chief Operating Officer
NGO Transmission, Inc.
1500 Grandville Road
Newark, Ohio 43058
CPF 1-2025-010-NOA
Dear Mr. McVey:
From June 24 through June 27, 2024, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.),
inspected NGO Transmission, Inc.’s (NGO) underground natural gas storage (UNGS) records and
procedures for the Perry, Muskie, and Zane storage fields in Perry County and Muskingum County,
Ohio.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
NGO’s plans or procedures. The items inspected and the inadequacies are described below:
1. § 192.12 Underground natural gas storage facilities.
(a) …
(c) Procedural manuals. Each operator of a UNGSF must prepare
and follow for each facility one or more manuals of written procedures
for conducting operations, maintenance, and emergency preparedness
and response activities under paragraphs (a) and (b) of this section.
Each operator must keep records necessary to administer such
procedures and review and update these manuals at intervals not
exceeding 15 months, but at least once each calendar year. Each
operator must keep the appropriate parts of these manuals accessible
at locations where UNGSF work is being performed. Each operator
must have written procedures in place before commencing operations
or beginning an activity not yet implemented.



NGO’s written procedures for conducting operations and maintenance activities were inadequate
to provide for safe operation of a pipeline facility in accordance with § 192.12(c). Specifically,
NGO’s Emergency Procedure Manual (EPM) failed to include a process for addressing accidental
releases, equipment failure, natural disasters, and third-party emergencies as required in API RP
1171, Section 10.6.1.
During the inspection, PHMSA reviewed the EPM. The EPM failed to include a process
addressing accidental releases, equipment failure, natural disasters, and third-party emergencies.
Therefore, NGO’s written procedures for conducting operations and maintenance activities were
inadequate to provide for safe operation of a pipeline facility in accordance with § 192.12(c). NGO
must revise its written procedures to address the deficiencies outlined above.
2. § 192.12 Underground natural gas storage facilities.
(a) …
(d) Integrity management program —
(1) Integrity management program elements. The integrity
management program for each UNGSF under this paragraph (d) must
consist, at a minimum, of a framework developed under API RP 1171
(incorporated by reference, see § 192.7), section 8 (“Risk Management
for Gas Storage Operations”), and that also describes how relevant
decisions will be made and by whom. An operator must make continual
improvements to the program and its execution. The integrity
management program must include the following elements:
(i) A plan for developing and implementing each program element
to meet the requirements of this section;
(ii) …
(iii) …
(iv) …
(v) …
(vi) …
(2) Integrity management baseline risk-assessment intervals. No later
than March 13, 2024, each UNGSF operator must complete the baseline
risk assessments of all reservoirs and caverns, and at least 40% of the
baseline risk assessments for each of its UNGSF wells (including
wellhead assemblies), beginning with the highest-risk wells, as
identified by the risk analysis process. No later than March 13, 2027,
an operator must complete baseline risk assessments on all its wells
(including wellhead assemblies). Operators may use prior risk
assessments for a well as a baseline (or part of the baseline) risk
assessment in implementing its initial integrity management program,
so long as the prior assessments meet the requirements of API RP 1171
(incorporated by reference, see § 192.7), section 8, and continue to be
relevant and valid for the current operating and environmental
conditions. When evaluating prior risk-assessment results, operators
must account for the growth and effects of indicated defects since the



time the assessment was performed.
NGO’s written integrity management program failed to include a plan for developing and
implementing each program element to meet the requirements of § 192.12(d)(1)(i). Specifically,
NGO’s Storage Integrity Management Plan, Standard 3.18 (Apr. 5, 2021) (SIMP) failed to include
a plan for completing the baseline risk assessments in accordance with § 192.12(d)(2).
During the inspection, PHMSA reviewed NGO’s SIMP and found that it failed to include a process
outlining the methodology and deadlines for completing baseline risk assessments for its UNGS
facilities pursuant to § 192.12(d)(2).
Therefore, NGO’s written integrity management program failed to include a plan for developing
and implementing each program element to meet the requirements of § 192.12(d)(1)(i). NGO must
revise its written procedures to address the deficiency outlined above.
3. § 192.12 Underground natural gas storage facilities.
(a) …
(d) Integrity management program —
(1) …
(4) Integrity management procedures and recordkeeping. Each
UNGSF operator must establish and follow written procedures to carry
out its integrity management program under API RP 1171
(incorporated by reference, see § 192.7), section 8 (“Risk Management
for Gas Storage Operations”), and this paragraph (d). The operator
must also maintain, for the useful life of the UNGSF, records that
demonstrate compliance with the requirements of this paragraph (d).
This includes records developed and used in support of any
identification, calculation, amendment, modification, justification,
deviation, and determination made, and any action taken to implement
and evaluate any integrity management program element.
NGO’s written procedures for carrying out its integrity management program were inadequate to
provide for safe operation of a pipeline facility in accordance with § 192.12(d)(4). Specifically,
NGO’s Storage Integrity Management Plan, Standard 3.18 (Apr. 5, 2021) (SIMP) failed to have
a written process to assess threat and hazard interaction in accordance with API RP 1171, Section
8.3.2 – Data Sources.
Section 8.3.2 states in part that “[t]he Operators shall use available information such as
performance data collected through the field history, operations, and maintenance (O&M)
activities, geotechnical data such as well logs, engineering data, and completion reports to
determine susceptibility to threat and hazard-related events and to assess threat and hazard
interaction.”
During the inspection, PHMSA reviewed the SIMP and determined that it failed to identify threat
and hazard interactions for their underground storage facilities and failed to outline how the
interactions impact risk assessment scores/ranking. as required by Section 8.3.2.



Therefore, NGO’s written procedures for carrying out its integrity management program were
inadequate to provide for safe operation of a pipeline facility in accordance with § 192.12(d)(4).
NGO must revise its procedures to include the identification and assessment of threat and hazard
interactions in accordance with Section 8.3.2.
Response to this Notice
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 CFR § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that NGO Gas Transmission, Inc. maintain documentation of the
safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
Eastern Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 1-2025-010-NOA and, for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
- **truncated:** false