# TENNESSEE GAS PIPELINE COMPANY — Corrective Action Order

- **operation:** document
- **citation:** CPF 220061007H
- **title:** TENNESSEE GAS PIPELINE COMPANY — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2006-07-27
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220061007h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220061007h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220061007h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220061007H
**body:**

Corrective Action Order involving TENNESSEE GAS PIPELINE COMPANY. The dataset does not identify a cited regulation for this case. The case was opened on 2006-07-27 and is reported as closed as of 2007-06-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220061007H_Corrective Action Order_07272006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220061007H/220061007H_Corrective%20Action%20Order_07272006.pdf

220061007H_Corrective Action Order_07272006.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety Administration
400 Seventh Street, S.W.
Washington, D.C. 20590
JUL 2 7 2006
Mr. David Jones
Vice President, Eastern Operations
Tennessee Gas Pipeline
An Affiliate of El Paso Corporation
2 Brentwood Commons, Suite 190
Brentwood, TN 37027
Re: CPF No. 2-2006-3 007 H
Dear Mr. Jones:
Enclosed is a Corrective Action Order issued by the Acting Associate Administrator for
Pipeline Safety in the above-referenced case. It requires you to take certain corrective actions
with respect to the operation of your 24-inch transmission pipeline Line 100-1, which extends
from Campbellsville, Kentucky to Clay City, Kentucky. Service is being made by certified mail
and facsimile. Your receipt of the enclosed document constitutes service of that document. The
terms and conditions of this Final Order are effective upon receipt.
Sinc ely,
/ "f
b an^^ Registry
Office of Pipeline Safety
Enclosure
VIA CERTIFIED MAIL (RETURN RECEIPT REQUESTED) AND TELECOPY



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of
TENNESSEE GAS PIPELINE, An Affiliate of El Paso Corporation
Respondent
CPF NO. 2-2006-1007H
1
CORRECTIVE ACTION ORDER
Purpose and Background
This Corrective Action Order is being issued, under authority of 49 U.S.C. 5 601 12, to require
Tennessee Gas Pipeline (Respondent), an affiliate of El Paso Corporation (El Paso), to take the
necessary corrective action to protect the public and environment from potential hazards
associated with its 24-inch natural gas transmission pipeline that extends from Carnpbellsville,
Kentucky to Clay City, Kentucky (hereinafter referred to as Line 100-1).
On July 22,2006, a failure occurred on Respondent's 24-inch Line 100-1 pipeline approximately
six miles southeast of Clay City, Kentucky, resulting in the release and ignition of natural gas.
The cause of the failure is unknown. Pursuant to 49 U.S.C. 5 60 1 17, the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety, Southern Region and the
Kentucky Public Service Commission initiated an investigation of this failure.
Preliminarv Findings
1. At approximately 12:30 p.m. EDT, on July 22,2006, a segment of Respondent's 24-inch
Line 100-1 ruptured, resulting in an estimated release of 42,946 MSCF of natural gas
near Clay City in Clark County, Kentucky. A fire ensued and was extinguished at 1:33
p.m. EDT.
2. The rupture and fire occurred at Mile Post 105.1 +3.7, approximately 6 miles southeast of
Clay City, Kentucky, 1 1 miles southeast of Winchester, Kentucky and 1 1 miles northeast
of Mount Sterling, Kentucky.



2
No injuries or fatalities occurred. Three (3) homes were evacuated and minor damage
occurred on nearby property.
The preliminary investigation indicates external pitting corrosion in an area
approximately 2 - 3 feet long near the fracture, and within about 2 - 4 inches of the
longitudinal seam. The fracture followed the edge of the longitudinal seam in the area of
the pitting.
Following the July 22, 2006 failure, Respondent's personnel isolated the segment of
pipeline involved in the failure by closing the nearest upstream mainline block valve
(MLV 105-1) at 1:26 p.m. and isolation valves at the nearest downstream valve at
Compressor Station 106 at 1:07 p.m. MLV 105-1 is located approximately four miles
upstream of the failure site. Compressor Station 106 is located approximately two miles
downstream of the failure site.
The failure occurred in a 90 mile section between Respondent's Campbellsville,
Kentucky Compressor Station 96 and the Clay City, Kentucky Compressor Station 106,
approximately 2 miles upstream of the Clay City Station.
Approximately 25 feet of pipe blew out of the ground and landed about 200 feet on the
hill from the failure site on or near the Respondent's 800 system right-of-way. The
section of pipe was twisted and mangled. External coating was completely burned off the
section of pipe that was blown out of the ground.
The 84 mile long section of Line 100-1 upstream of the failure valve section is under
pressure. The six miles long failure valve section is currently depressurized and out of
service.
At the time of the incident, the Line 100-1 pressure at a meter station located 21 miles
upstream was 721 psig. The estimated failure site pressure was 716 psig. The maximum
allowable operating pressure (MAOP) of this line segment is 750 psig.
The investigation is ongoing. The failed pipe segment along with adjacent pieces was
transported to El Paso's metallurgical laboratory located in Dearborn, Michigan for
further analysis.
The Line 100-1 pipeline was installed in 1944 and is constructed of 24-inch x 0.250-inch
w.t., API 5L-X50 pipe manufactured by A.O. Smith. The protective coating is coal tar
enamel (TGF-2).
The pipeline is owned by El Paso's Pipeline Group, which owns and operates
approximately 48,000 miles of natural gas pipeline. Respondent, an affiliate of El Paso,
operates nearly 14,000 miles of pipeline, including approximately 1,508 pipeline miles of
interstate natural gas transmission lines in the state of Kentucky. Respondent's pipelines



13. 14. 15. 16. 17. 5
traversing Kentucky include the 100 and 800 systems, of which a portion is located in
shale terrain.
Line 100- 1 passes through mostly rural areas in Kentucky, with some Class 2 and Class 3
location areas, in addition to other populated areas designated as High Consequence
Areas (HCAs). The pipeline also passes through large and small communities along the
route as well as crossing state and interstate highways, rivers, and streams. The failure
occurred in a Class 2 location area.
In 1986, Respondent internally inspected the failed line section using a Tuboscope low-
resolution magnetic flux leakage inline inspection (ILI) tool.
The pipeline failed in the bottom of a valley in an area of wet shale. Shale terrain in this
part of Kentucky is known to cause corrosive environments on buried pipelines. A major
pipeline failure occurred on Respondent's 26-inch Line 100-3 on July 23, 1980,
approximately three miles from the July 22, 2006 failure. The subsequent investigation
revealed that several operational and hydrostatic test pipeline failures had occurred on
Respondents System 100 pipelines in shale terrain near Clay City, and were attributable
to external bacterial corrosion.
Line 100-1 was last pressure tested in 1986 at a minimum pressure of 940 psig for eight
hours with no leaks. In 198 1, Line 100- 1 was pressure tested at a minimum pressure of
974 psig for eight hours with no leaks. Line 100-1 was also pressure tested in 1971 at a
minimum pressure of 938 psig for eight hours with two leaks. Line 100-1 was pressure
tested in 1967 at a minimum pressure of 936 psig for twenty-four hours with two leaks.
Respondent conveyed that an ILI run was scheduled to be run in the failed section during
the week of July 24,2006.
Determination of Necessitv for Corrective Action Order and Right to Hearing
Section 601 12 of Title 49, United States Code, provides for the issuance of a Corrective Action
Order, after reasonable notice and the opportunity for a hearing, requiring corrective action,
which may include the suspended or restricted use of a pipeline facility, physical inspection,
testing, repair, replacement, or other action as appropriate. The basis for making the
determination that a pipeline facility is hazardous, requiring corrective action, is set forth both in
the above referenced statute and 49 C.F.R. 8190.233, a copy of which is enclosed.
Section 601 12, and the regulations promulgated thereunder, provide for the issuance of a
Corrective Action Order without prior opportunity for notice and hearing upon a finding that
failure to issue the Order expeditiously will result in likely serious harm to life, property or the
environment. In such cases, an opportunity for a hearing will be provided as soon as practicable
after the issuance of the Order.



4
After evaluating the foregoing preliminary findings of fact, I find that the continued operation of
this pipeline without corrective measures would be hazardous to life, property and the
environment. Additionally, after considering the age of the pipe, circumstances surrounding this
failure, the proximity of the pipeline to high consequence areas, the nature of the product the
pipeline transports, the pressure required for transporting the material, the uncertainties as to the
cause of the failure, and the ongoing investigation to determine the cause of the failure, I find
that a failure to issue expeditiously this Order, requiring immediate corrective action, would
result in likely serious harm to life, property, and the environment.
Accordingly, this Corrective Action Order mandating needed immediate corrective action is
issued without prior notice and opportunity for a hearing. The terms and conditions of this Order
are effective upon receipt.
Within 10 days of receipt of this Order, Respondent may request a hearing, to be held as soon as
practicable, by notifying the Associate Administrator for Pipeline Safety in writing, delivered
personally, by mail or by telecopy at (202) 366-4566. The hearing will be held in Atlanta,
Georgia or Washington, D.C. on a date that is mutually convenient to PHMSA and Respondent.
After receiving and analyzing additional data in the course of this investigation, PHMSA may
identify other longer term measures that need to be taken. Tennessee Gas Pipeline will be
notified of any additional measures required and amendment of this Order will be considered.
To the extent consistent with safety, Respondent will be afforded notice and an opportunity for a
hearing prior to the imposition of any additional corrective measures.
Required Corrective Action
Pursuant to 49 U.S.C. 5 601 12, I hereby order Tennessee Gas Pipeline to immediately take the
following corrective actions with respect to its 24-inch transmission pipeline Line 100-1 :
1. The operating pressure on Line 100- 1 at the failure location, including any gas pressure
required to run ILI tools prior to resuming operation, is not to exceed 80 percent of the
operating pressure in effect immediately prior to the July 22,2006 failure. Specifically, the
operating pressure at the failure location is not to exceed 572.8 psig. This pressure restriction
will remain in effect until written approval to increase the pressure or return the pipeline to
its pre-failure operating pressure is obtained from the Director, Southern Region, OPS. If the
results of any action undertaken pursuant to this Order dictate a reduction in the allowable
operating pressure below that imposed by this Order, Respondent must further reduce the
operating pressure accordingly.
2. Conduct a detailed metallurgical analysis of the pipe that failed on July 22,2006 to determine
the cause and contributing factors.
A. When handling and transporting the failed pipe section and any other evidence from
the failure site, document the chain-of-custody;



3. 4. B. Obtain prior approval of the metallurgical testing protocol from the Director,
Southern Region, OPS; and
C. Prior to commencing the metallurgical testing, provide the Director, Southern Region,
OPS with the scheduled date, time, and location of the testing to allow a PHMSA
representative to witness it.
D. Ensure that the laboratory distributes all resulting metallurgical reports, whether draft
or final, to OPS at the same time as they are made available to Respondent.
Submit a written plan, with a schedule, to verify the integrity of the line segment from the
Campbellsville Compressor Station 96 and Clay City Compressor Station 106. The plan
must provide integrity testing that addresses all known or suspected factors in the failure,
including, but not limited to:
A. ILI tool surveys and remedial action. The type of internal inspection tools used
shall be technologically appropriate for assessing the system based on the type of
failure that occurred on July 22,2006, with emphasis on identifying and
evaluating the following: 1) anomalies associated with dents, gouges and
grooves; 2) metal loss due to corrosion; 3) the orientation of the longitudinal
seam of the pipe; 4) pipe deformation, and 5) longitudinal cracks, mill defects
and stress corrosion cracking.
B. A detailed description of the inspection and repair criteria that will be used in the
field evaluation of the anomalies that are excavated. This is to include a
description of how any defects are to be graded and the schedule for repairs or
replacement.
C. An evaluation of the line for areas of damaged or disbonded coating, including
but not limited to, a current interrupted close-interval survey.
D. Integration of all available data from internal inspections, metallurgical analyses,
and historical data, including repair and cathodic protection records.
E. Hydrostatic pressure testing of the line segment and/or other mitigative
measures required to address the cause and contributing factors to the July
22,2006 pipeline failure.
Review applicable historical, operational, maintenance and incident information on the 100
and 800 System pipeline segments that traverse through shale terrain in Kentucky, along with
the results of the failure analysis required in Item 2. Determine if additional actions and/or
preventive measures are necessary to reduce the risk of a failure similar the one that occurred
on July 22,2006. Information such as pipeline vintage, type of coating, prevalence of
disbonded coating, most recent ILI surveys, pressure test, close-interval survey should be



5. 6. 7. 8. 6
considered. Within 45 days, submit documentation to show completion to Director, Southern
Region, OPS.
Submit the plan required of Item 4 and the results of the requirements in Item 5 to: Director,
Southern Region, OPS, 233 Peachtree Street, Suite 600, Atlanta, GA 30303. The plan must
be revised, as necessary, to incorporate new information obtained during the failure
investigation and remedial activities undertaken pursuant to this Order. Submit any such
plan revisions to the Director for prior approval. The Director, Southern Region, OPS, may
approve plan elements incrementally.
Implement the plan as it is approved, including any revisions to the plan.
The Director, Southern Region, OPS, may allow the removal or modification of the pressure
restriction set forth in Item 1 upon a written request from Respondent demonstrating that the
hazard has been abated and that restoring the pipeline to its pre-failure operating pressure is
justified based on a reliable engineering analysis showing that the pressure increase is safe
considering all known defects, anomalies and operating parameters of the pipeline. Appeals
to determinations of the Director, Southern Region, OPS, will be subject to the decision of
the Acting Associate Administrator for Pipeline Safety.
The Director, Southern Region, OPS, may grant an extension of time for compliance with
any of the terms of this order for good cause. A request for an extension must be in writing.
The corrective actions required by this Corrective Action Order are in addition to and do not
waive any requirements that apply to the pipeline under any other order issued to Respondent
under authority of 49 U.S.C. chapter 601, under 49 C.F.R. Part 191, or under any other provision
of Federal or state law.
Failure to comply with this Order may result in the assessment of civil penalties of up to
$1 00,000 per violation per day pursuant to 49 U.S.C. 601 22, and in referral to the Attorney
General for imposition of civil judicial penalties or other appropriate relief in United States
District Court pursuant to 49 U.S.C. 60120.
Theodore L. Wilke
Acting Associate Administrator
for Pipeline Safety
Date Issued
- **truncated:** false
- **body characters:** 16404