# TAMPA BAY PIPELINE CO. — Notice of Amendment

- **operation:** document
- **citation:** CPF 220086001M
- **title:** TAMPA BAY PIPELINE CO. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2008-03-14
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.401(d)(1)(iv), 195.402(a), 195.402(c)(11), 195.402(c)(13), 195.402(c)(14), 195.402(c)(3), 195.402(d)(5), 195.440(b), 195.442(c)(6).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220086001m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220086001m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220086001m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220086001M
**body:**

Notice of Amendment involving TAMPA BAY PIPELINE CO.. PHMSA's enforcement data identifies the cited regulations as 195.401(d)(1)(iv),  195.402(a),  195.402(c)(11),  195.402(c)(13),  195.402(c)(14),  195.402(c)(3),  195.402(d)(5),  195.440(b),  195.442(c)(6). The case was opened on 2008-03-14 and is reported as closed as of 2009-04-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220086001M_notice of amendment_03142008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220086001M/220086001M_notice%20of%20amendment_03142008.pdf

220086001m_notice of amendment_03142008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220086001M/220086001m_notice%20of%20amendment_03142008_text.pdf

220086001M_Operator Response_03262008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220086001M/220086001M_Operator%20Response_03262008.pdf

220086001m_notice of amendment_03142008_text.pdf

o a
III& Dep
- ofrran
.
'I I II $ip ti
AItml
I
ET
I Marcit IT4
I
1i
t
Robert ILI
% — President
v f P. '8
, ', S
galnpa Pipp
. Boxi-
. V
r
DearlMr.
IBetweeq V
Safety.
emeqgenct
On the basg
TBPL's p
233 Peachtree Street Sle. 600
Allah/a, GA 3'5303
dais Saftaty
~ rtr NQI
e
I
I I
L - RE-'PUW. ilKCR
—
al
T ~—
I
, +1 1
J'l i ~
orporation
I
— CIF 2-2008-6001M
d August 2, 200%, aslttltg eiifipttlape an dous Materials
on(PHMSA)ipursfi hapter f'49 United States Code inspected
ehrae Company (TBPLI~uresi for& esktions, tnaintestance and
pampa, Florida.
I
pe inspection, PHI5ISA' 4ntiiftgt~ppsennt jrtadeaTrtatbiSs found within
r procedures, as, desc eIow-:
oceduratunaqp erla0i~on
' tIanance;and emergencies.
. EaChrttipqrraitp l pltirietan OW fOr each. pipegae SyStem a
f written proced h ~oF al opesIJaatonJsattlaFsnaintenancei
stand handling let egilittbn rgencies. . . .
~pipeline rap s.
prt'I operaltor may us
'ng pipeline ifacih '
pe&r v oil'fittingl for, repldcement in
sttitiisi i nletNIand constpugteLas retliuired by
least.
4I
I
I
I
I
III g 5
I n ll
I
'



I,
~
~
,
requi
s
I
5. 226 Welding: A
Each NIIc Ibuan
). Antarc bairn. mrs 'b
'
inil'ing, iHise g
ss'than the mini
ecgication to wih 't
'rsding, a cINsst
veIL
Aground imayi noti
IIIBL . ~
Irediby letiely rpmovin~tfte Inotch by
slbttt r Iiqqemaeningllqallsthickness to
ssi ill ttse toleti~ the
pepsi ma tured. If a notch ig not repairable
e pimp~ 'ng the entiae noitch must be
lded toity& lori fititing thatris' being welded.
welding repair proce
9~26(ia),
%. ZI26(b), and
. 26(c).
otlad c burns, as requised of:
I
, I
. 230 Welds: R~b
ketch weld thatltssI
ired. Excpptifor we
ilay vessel, ai will
erceint of the wel
I)Ikach weld that
etsil and the scgnllsaL
ifich-wouM adversely
segmenti qLf the weliil
dcclltabjliity.
Repair of- a era~ g.
cordance uiith iwin'
nrter $195. 214. Rgijai
ehanical proipertksi
Ijiginat weld are metiu
mo l fects.
bl tilll95. 2@hmstst be removted or
n an offsh pipeline iheinig instaililed from a
Hbemoved 'f iti Isas-a cqack-tbtte is more than 8
I
dbpusQa
' defect aemovedtdovcn to sound
pairijd ibeipreheatediif conditions exist
ii fieiqu f She weld repair. After repair,
as llep us&be inisipectqd to ensure its
Ilgegetu~reviously r~ired area must be
ld IIep &ce(tiple
s tihat. haveibeen qualified
Isres I
thethe minimum
ied'fo t idled. pr
ocediureJIsed to make the
e i th~
hvseld IItepair.
eldirrg repairiprocqilur 9'~230(a) + EL
3. 230(b), apd
I5 230(c), i
nc+ald!5@kthcirepair or rerII9i~al qf defects, as
$95. 266 Constgud8o s.
, qomplete reeQd&hat the fo l '
g must be maltitained by the
ator involved for Ie l' Ihre1lityi:
bp totni numih@L mtIez. nondestructively
estd, includi~ ejp he diippositioni df each rejected
eld.
I
I
'
~ elding repair illroecd not re
riecords of the total number of girth
e. nurnberinra oa
its tlic nuiqbe~jected and the
ogofieach rejcctedg 'in Ir the life of egbhlpipeline facility.
S
4



%3ili0 iloeoordkCI
'fA recond musjbe a
nhe recordio'f iihe
sted is in use.
) ihe record nctl4Jinetl
he pressure recon
'. (BI)i The name, o he
.
lhngljhe test, a h
. . 8l)&n ~lanai ignI
ilunes, that alspcgrJon
each r~te'st'r~uircdIby this subpart,
t us etijiiyed asilong as it e'f'gcility
Irgp~i5$-this sectioti must include:
sl
or, the esofMe person Ire~onsible for
t~ ok an~ usediI ifi an0I;
a
ressuiia rgiinuities, lindlfigilng. test
4e i corsliingich arts. i -. . .
I'
I
cssure testing proce
ecord of the latest te
0iiled of $195. 310(a).
test record m'ust include
. Silt0(ib)(1).
est record must-indi'u
d of $195. 310(b)(i3). '
e. test record must igloo)li
din i test failures that
liN(b)(8-).
I
not re fhe following.
t bcseta s long as thelfaciility tested is in use,
I
gessure ~rdhng, chart~, asiro~red of
Came of tlLedtiicompany used, it any as
. 1 i~nfl aniy prepare Bincontinuities,
ith risssdke recording charts as reqrdred of
J
rocedurali manuali~ erIt'sona infitance, andi emeirlgencies.
I
'ntenance arnfinotf nations. W nuaLreqpired by paragraph (a)
ion mststiylu~glltl84 fosit I4svsng toiprovide safety during
e anbaormal oge s:
ieaating, maintain% pep
' ' ipipeline systIIm4n accordance
''
wli Ifrf the reqnintemeiftsi stslip stuart H oig thisipart.
~
iN$404 Miqps an@lb
— I I . Qb) Bach operator Jhligmaintaihi tileas~yisaiisidaify operating
/ hcqilds thaitwndicatit-
(e) Any emengenp o mall ijI ntto which tfrelpraeedures
Icr $195. 402 app[yi.
I
k. Ti
opera
r
fh
abnormall'operation~ dyes areT
records ifidicating ce nermdl
d include, as a lic ili95i4
'iptended valve c - ntende
slsonses, etc.
ccifiy& to whercrir howi daily
'ilwrart to be documented. Such
tmot ilimiitiedl to) i coinrniinication
dowries Iilreratiahinifigsyfety device,
V
I
I
$95. 406 Maximum-o~nlgipriess re
)IExcept for surg~erlessu estd i
bsaitiions, no oqp@o pertallle
yof the follovtlipgi
ailiations lfiro 1
elISIIep I'-e Ixat exceeds
I
~ V ~ I



e iqtcmal designj e of jtjh
' etermined in accordance with
I06. $M4weve, t ejigjj s Ibggnp, conjverted under
5. 5, if onejorj flthe4 nJfpgmula @'95. 106) are
uujknown, one obfjtj oIP '
g[qrCNur ~ 6e used as dusjig pressure:
)IEightypeucentojfsLth s$pres~u tTgatjproduce~eldundersection
&of appendix NlRI 1. 8, I ~ by the ajIjprjopriate factors in
~ 95. 106(a) and (e); jol
ijl fjthe pipe is 12i'/d i' mi) jojrj les utjsjide diamoterland is not tested
;yield under. thisjlja Ojp. 3ll9 kjHa) gage.
/ The design presjsjujrjeto other co onent ofjthje pijpeljine.
jj0) jit'. ightjy percent of tjhe t &ssureJf any partgufjthe IPijpeijine which has
ressujfe testejkujk parXE his part.
htjy percent o tes uvre or-o$ tge jpljjototyjpe test
gjcjssure for asty. inj
' ' sj)ie onent whklh ia excepted from
sting under ji195. I15.
Jpj)jf'or pipelinesjun+r 5-. 302 njd (jb)(2)(1)j tlat have not been
ressure testedj under su ofj t t, 80 petloent jttfj the jtest pressure
J I~hest opetjajtinlprjes o-uj ' pipeline was subjected for 4 or
ore continuousj ht}. n be d jjjjjatedjby jtjecording charts or
gs made at the jttmejt~&er. opecNI0ns were conductedk
~B. ptjocedures do not cgjfj methodgpgr zgqujircd of ji195. 406(a) for
detaining pipeline Maximum sting Pressjlj.
9&422 Pipehne rqpa
. I. j(jb) No ojperato~ selhng pigje~vfNvje; orj fjjftinggor rjhylacement in
epairing pip'ehne 0IIII' ess jgy+jgpjedjasgd constructed as
etIuired by this jpart.
I
-I
.
C. procedures do notaddr ~csprcfigczeqnirements of ji195. 422(b). Section
4. 1 . rations & jjhdlhintenan cedure l conveys ".
. . repair parts and
ma Ijjhe properly dcsijgn ~etc " There is no reference to the
a li b design and construcfi jsartjsJof 95Pubparts C and D,
res ly). AlthoughTBPLp esad omejsectionsunderthescsubparts
such eljjjing, procedurcslgba njjinim eferencc Part 195 Subparts C and D.
I Hj
95. 434 Signs.
I
. I
ach operator must+
signs
janjjping station an
)an
fjthe operator an
Ito thejpujblic around each
'a~csign must contain the name
ingbdingjarea~de) wjhere the
rator can'be rje
procedures do notiequ
tg t hkjptS d d hp p ttt
f38 'Smokin
operatojgjjb ij
a and each bre u
of a'flammabjle ha
els.
molljijn
[openjtljsmejsj45 each pump station
jet 4 is 'a poss/b15tyjof the leakage
'I QugscLgce ofi aimable vapors.



procedures do «sot a«jl )bitii«ht king~d open flames at Hartford
-pi at«t«iran (includes one(ca«) ei and+ ' soap/, and at It, iklia Booster
Statio 'ncludcs a propane tank).
I
i
'
~ 95. 561 When must IEinsniect ipipei
«used for extennal corrosion
I ntrol? I
'
'Yiou must inspect. allie mal pime coating riequired byrt!195. 557 just
'or to lowering th$pip tio the ~submesigipgithe pipe.
) You mu«it repaigPa ting dam ' iscoveredi I i
F. t t tp «itpd t ttrttnth ttti t f«t95. 56t.
I $6BiWhichpipelines ve cat boteotion?
ch buried or subrgya tpeline ithajV!I«constr«tctedi relocatcid«replaced,
'
erwise changedia er a
g atethuV195. 40k!ic)imiustihave
dic protection. l«he i piro c must ibe in uperati!on not later
year after the-p~eli nstr~t . eloc«ttiedrreilVaccdl or otherwise
i)cd, as applicable;
Gi'fBPL cathodic protectiorPproe progction to be in operation. noti es do ljatiadl!riess the requirement for cathodic
yctpthe( the pipeline is constructed,
relPltll, rpplaced, or other~wise-c ed.
«I3 What must I«do '
oem~ al corrositon-control?
rotecredpipelines. g'y doithe. fffll itng to detetrmine whether
~ c o«itc protection-reqiuire is sub ampilfes with Vill96i571:
)identify not mioae a ursine' od«cyrotectionPs installed, the
c' stances in which -' ervki! s or comparal4eiitechi«Sology is
— p ca%le and necessa!«!y t Lsilish jectives of Itt«ragraph 10. 1. 1. 3 of
Standard Ilip 016Ili ga or ted e«len«ie, see $1'05!3).
-lII! T «corrosion controlgoceescudo f«e) i Q, the circumstances and timeframe
r
' $195. 573(a)(2).
~ f 1 . 73 What must I ~t nitop4:)«iter aoarasion contriol?
/f) Recrifiers and ptI«ces. V ustiieleataically check for proper
rifmance each de«j' First c niati the frequency stated in the
dfcolumn.
~ I



I
~
ddl(
I
J. Iii
teak
co
ac Ip
theta
reqbi
or pr
r
L
ec I
I, Revelrlse
J switch
' Diode
iilnterferen
WIIISS
wo VII+
sitruct I
t
corrosion control motto
ferenced in $195. 5I7 .
lwith intervals-nomic
-IJ
tloceduresev not require electrical checks of the
ushijgdP arpleastwix times eacQcalqrtdar
t/gmo
3 What mNst I I@i
) Corrective, aetio
sion control as iue
irked
vles-a pipeline in. n
correct the defioieng
I
cate c rosion coniI)l)l?
st-correct idenl0ifredhdefrciency in
1~95. 40 . However, if theldeficiency
ngIl ipnnigrmttm lmderg195. 452, you
quit eP 95:4I52(lh).
~ L
s401 Gelneral requsre
IWViltenever tm ltd ria
tithe safe operaaion
able time. Howegpr,
mediate hazaad tPe
ted part of the sy]Pm gn
ddd hh t dtd d ty
~e syi yitlsbylhcoorect it. within a
'
audition of suctvtai nature fnal Iit presents
'
ri Ilirop the'operator mayI dot opertlite the
tti has co ithe ulnsnfe condition. ]
dl
operation and mamten
rdccd notI require correctiye actions ro be
requiredi of $195. ~I(e/
ect Ice al pntified defiiciencies in corrosion
rocedures do not ~v ac
tions t taken, ,
and when to take such
o correct extemali
cov bitried ape or onipime exposed to
s here that 1) could a
ffect t e operatfonhofljts pipeline system
a reasonable time ~c
r, 2) ents ai immediate hazard to persons
y-
. 55fi What rniust il do
eneral corrosion. fitly
inhig wall ithickat@iik
cap
pil)e[ so
thanatha
e of the pipeline
prep
,
the pipe if you-
duce the maximtutu ingipress
tpe neededllloc. gA' else
ipe?
ly otlrrotlledl that tihe
1 ed forl tlieirqaxjmium opeaating
iipe. . I Hoover, yttlla need not
xgcommonsurate-wrthi the strength
-actuss~lminlin 11 thickness; . I.
I I
I
~ I
s4, L
~



I I
I
I
LJ
I
I
I
I
Ia~ ~,
I
— I;i '
air the pipe by a at relish gine~g teats andi analyses
an pernsauen)l)'It df thm, pilte. l
iized corrosion pit u4 e't ' tkhhJoCalllilzegdoorosion
g+ a degtsee th II ght re ogpuu~eplace or repair the
unless you redut ~er ' plressur~ommensurate with
h Itgth of thei)ipe tivoli
'n ~fl. tihickness in the pits.
I
I
Ku 's operation and ngnten ro o It indude-c'ocrrective actions for
~i/ Itt(o be generally cirro ouzo localized corrosiagTpitting as
descri i' t'l 195. 585.
/
. g7 What lnethod~ le toi inttsthelstrength of corroded.
thtf195. 585, youlina e r tr AggK B31tG, ~Manual for
ning the Rorw
' ggth )ed39pegIqes, " arlfhe procedure
ppd by AGA/Bia odifi rion4or Kvhluat'ing the
ing sAengthlo o
' thy' ~I6 disk), tto determine
neth-of cored pi d. one's mahning wallttkackatess. These
edptges apply to cunsod ionls th otpgenett'uttreheipipe wall,
qaao the limi~ionigse thetres tt~rocedurit:s.
I
L.
im
'Islibperation and ma% e roce o use to determine t)e str of co pipe.
I
'o not desctiilte o~rreference any
11
du
f
e
h ocedural manque
intenance and nornt
eotiouimiustt iin
alnteuanhe aud n
Minimizingithe I'
Iidentified under~
r4he presence trf fl
I
rations- enaltcC, andi &mergencies.
ti nstal rtatuiredb~aragraph
s eifoilfovttiIsg to ipqovide safety
peatttiqttg
acc/tigrs tghiAinsttlf vlttpors4rrareas near
(c)( 'sisectiItn wlNre tile potential
md '
ases. '.
tfIBQL's pr s do not provide fo
~era at tl and Lithia Boo ter
~swah rttlpane tanks' s
lsreas requ i ediate emerge e
iItgithe Iihoo~f accidental ignition of
tations. Q . putuptstations ltaive
ntljttte PLls procedures' as located in
se. I
4. $1I9si
Procedural manuali
eugttc@ and ensergencies.
I
. . lc
gf hl
I
. . I
theQ
J
intenaqy andm
'opaftusti inpu
h and normal
r4othcaliliy revie~tt
tiveness of' the proqedjy
egtlZy action e
tions.
ual ~iujtteqttbg paragraph (a)
gtro pltptttiIre snfety during
Ibid
used)in n
desi
oghiratab-personnel to determine
I
operation and maintenance and
uhid.
~ p



I' I
II
a
I
I
I I
I
II I I
p Iil
I I
I
I
I
' I-
I
TBPL's pr
reviewed t
document
for iperfo g
inspection
facilitiies
mainten e
R
I
I
are not clear as to dihow sv one byioperator personnel is to be
I
ne the e8ectiveness erhlirgsi ereP~sulillstolgtheireview(s) are
cedures (see below))on cy that oral Manager wiill be responsible
s task. "Reviewing. one" conclude, but is not limited to,
iiftties to assurednspeclli cords ace)irately reflect the condiition of the
ation of personnel (inolin ogttraet personnel) iper forming itIppration and
I
etc.
,
m4
TIBPIA) lk,
The genttrial'
determine
activities
ochre ManualiSecti
nbger will be responsib
ectiveness oJithe prHIIO
'ng corrective actifiw
5. giJI
i Procedural iman
. . . a(i
of thi
mai
fno
wih
br Iti
ntenance and no
etiiionimust ineltudelp
e andsrorSIS@liogeIrp
king aidequat[ pic
hazardsof, unsafle. acc
eded ati the exdau
apparatlis and, . sLa
TiBPL's pr
trelichos to'
esi do not address Eel
blipersonnel, as req re
6
glL. d I aj I ~
I
bnormal operation. Z
mp lude proceduresi fori
l&' yrbeen exceeded:
(1l) qyding itn, invessigati
eration of any saifety
I
BBPL'segno al operation processes
irpyjestigate, l rrect the cause oQ
haze beepPx ded.
M
7. 81I9$s Procedural ma
"I l
'btnormal ope+io
hule procedullesi fog
been exceeded:
riodically Ii eviewini
essi oft they ponce
gactiop whet e ll'
'
I~eui
evi ewingI tPe work done by ll'BPL personnel to
seddniner%bliolterations and maintenance
e, define found.
emergencies.
erations, ailgtepance, andi
erirtt'ons. l requiifetliby paragraph (a)
s4br& il lxtngrtolpqy ide isafety during
s:
~iniex'c ted~trehchies to protect personStel
ation~so i otetlr gas, and mIligtiing available
qncy event, inc)uiding a
'
h liness e.
I
)ili95. 40I2
ethent t4 it e — adeqLrate precautions m excavated
insstuance, and emergencies.
grating
nail rhq 'd by pauagllaphi(tiili of this section
I
Wl viiide safety iwhen operating design
/@IV c Si
t. e;
inclttde~ reytiirexgents toi respond to,
of h reh~evibe when operating design limits
tion
i enance, and iemqrigencies.
tauh ~tri qdlbyiLlaralma a~i(a) of this section
gs)~midgei SsItiety ltIhep ipperating design
dim
. . . (5
peldiesponse riato~ersonngi to determine the
lltpg I~qperatipn and. taking
&fo
I



1 s
,
T iBPL's ab
it
rb:viesv per
' P ~&Reyiewiqj
revieuvinp
jfjBIIL Og
As aequi re
effective
L , rv procedurgq s
P k g. IIII9 4
. jat
Fl i i
i i i, lIgg
J j
dlt
.
~
i TBPL's ~4
11ocqrnmendat
I I i Materials.
f
Operatio
program)
baseline mes
~ j Spjipelinej),
media fblltvh
Polk Cdudti
1162 retj
section
i P jjother th
. i
indicating
living, wor i
11/29/0$
I 9 tj~g. -
b
('
i i
i
a
(iii
Tl
i
TBILL's d
i Manual) d
. damagetl
'al
operation procedures i
i
esponses. to abtsorm
esPonse of oPeratjjjrhP
el responses to actual
t cotjlvgy quency the General Manager is to
~r r~ tare dacuatented.
e 'eohltl e, ibut is no+eceyarily limited to,
ul'ated a noHttkl operating condttions.
eedujie Manual Se%o
jtjte 49 CFR Part 195. 4
~normal operatgt
/te revised and ortp
Rh iewi
@5j durds wi c review to deternjf'ne the
rformed. After. tire review, the
the ap priate magttgemfntjpersonnel.
jilujblic awareness. g i
yerator'~ogf ollowj K e~nltfjjrograjm
ations of kPI%P I as~sss t unique'atjtrW+ejsj and
' ties of the opqra4or e agj Ilties.
bli~ education pry' otrf'ol~ gernnr isla)ogsarrjj
~f API RP 1162 Appe, section WTf Targeted Distribution. of Print
i
i
i
r~ i
P44 /lib SS bl4. 7bl P bl Qb, 'iTBPL
e Targetedidistrirk' printi ittls ptethbijdj is to be used to delivea
s to the Affected Pub ' ndizid' jtl'ngg, worlding, or congregating near
cpjency of two (2) e e 0 ogramj requiresjtjhe use of local news
tion of individuals il' working arI the pipeline iil Hiiililsborough and
owever, this requiremjsn smojt jf)1 j
the guidance Qovidetl in API RP
e Targeted dtjffribvtio ~t m5tifr etlsod. AP~1162 Appendix D,
rjgeted Distrdbuti~f aferia e ot conv~atty delivery method
'
gs or hand-outs. -N ejljtatio awa provided during the inspection
PL has mailed orpr4b dho~ the baseline raessagq to individuals
or congregating near n . Thb%Qetive-date of the TBPL program is
i
i
rqijjamage jpqeviention i aIn.
Jdamagetgja9tieqgpn p gq Igy~ag+a~ Iia) ofjthis section
inimtIIn:
divide as follows fear
' ' nsoti ' sJshttt an opttnajjor has reason to
ld be damageti~b~ ' nia
cation snust bedPon '
'
neCsarvjitdjjsjjjingj antij abater the
. I i
towerifytthe initle
e
e; 4~
case of blastiing, 'o Ige leakage siarveIfs.
prevention progrljm (S '
fiji, Oporationq j&IMaintenanaetProcedure
tjreqjsire. itrspectio
e thlat rptiejgltas reajtong believe could be
vation activities jtts gas arfbtertIhe ac~ps, as follows.
i I
II



I ~
A . s do not ad~in ctlon trf p' i sIthat TBPL has reason to believe
M
cou mage dky. '6xcavhltio es u(h re is observed ertidence that an
ex rihas excavated acr8 line vtIIIth TBPL&s knowledge, and the
pipe could be damaged. (Il li9, (6)(i)l) I
. duties do not addressLth~trerhenti+195. 442(c)(6)(ii).
Res onsk:tk Notice
Thb Not& r 'ded pursuant to%91 Ili60108(a)-and 49 C. F. R. Il 190. 237. Enclosed
as part Notice is a docurknt n Respo Optitjps for Pipeliite Operators in
Compliance feedings. Please refer 's doc and' note the response options. Be
advised tli aU material yon submit in to forcement action isisubject to being
made publi itailable. If ypu beliey y porlto f yorker responsive material qualifies
for confi kment under 5 H. S. (b), iso 'thee'coilillp1ete original doctntLent
you must Ie a second copy of I
cugpnt wi Pe portions you believe qualify for
confidenti atment redacted an9anr a%inmf-w youibelieve the redacted information
qualifies %Ãaeliidantial treatment unde S. C. 5I5 ) tif you do not respond within 30
'
I
days of rec 1 this Notice, this colts
a waTIver kur'right to contesti the allegations in
thisi Not authorizes the Associ ministrato or Piypline Safety to find facts as
'
allegetIIin thi gice without further no ouIan
ue a Final Order.
I
If, after op ity for a hearing, 'yo ans b rdc~s are found inadequate as alleged in
this Notice, riiay be ordered tki artie plans gr~ce~es to correct the inadequacies
i(49 C. F. R. . 237). If you are hot c ting ithisP8tieb we propose that you submit your
amended sto my offic 'thi ys ofr~ofithis Notice. This period maybe
extended b y request for gooier ways nce4h~tya eeguacies idhntifted herein have been
addresse atnended procedures, tHLsufkrcemerP%tIion will be closed.
I
In corresglt) Ilice concerning this rnatte~ase re4lr+~CQF 2-200$660lM and, for each
document g s~t, please provig qt ggp
electronic~ruat whenevertlsossible.
sincerely -'. ( ~
I
I
Moliam ib
I
I
Acting Dir them Region
I
J Pipeline an dous Materials S
tratig
I
E I opt' f $ f ~rreklIE r Et' hach E
hr
- **truncated:** false
- **body characters:** 20157