{"operation":"document","citation":"CPF 220091002H","title":"FLORIDA GAS TRANSMISSION CO — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2009-05-07","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-220091002h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-220091002h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-220091002h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/220091002H","body":"Corrective Action Order involving FLORIDA GAS TRANSMISSION CO. The dataset does not identify a cited regulation for this case. The case was opened on 2009-05-07 and is reported as closed as of 2012-09-10. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n220091002H_CAO_05072009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220091002H/220091002H_CAO_05072009.pdf\n\n220091002H_CAO_05072009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220091002H/220091002H_CAO_05072009_text.pdf\n\n220091002H_closure letter_09102012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220091002H/220091002H_closure%20letter_09102012.pdf\n\n220091002H_closure Letter_09102012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220091002H/220091002H_closure%20Letter_09102012_text.pdf\n\n220091002H_closure Letter_09102012_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nSeptember 10, 2012\nMr. Eric Amundsen\nVP Technical Services\nPanhandle Energy\n5051 Westheimer Road\nHouston, Texas 77056\nCPF 2-2009-1002H\nDear Mr. Amundsen:\nOn August 30, 2012, you wrote to the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) Southern Region, Office of Pipeline Safety requesting closure of\nthe Corrective Action Order (CAO) (CPF No. 2-2009-1002H) that PHMSA issued on\nMay 7, 2009, in response to the May 4, 2009, incident on the Florida Gas Transmission (FGT)\n100 Line in Martin County, Florida. The CAO specifically addressed FGT’s 18-inch pipeline\nsegment that extends approximately 56.8 miles from Ft. Pierce (Station 20) to Cutler, Florida.\nThis letter is to inform you that the Southern Region has reviewed all the actions taken by\nFGT with respect to the CAO and we find that FGT has complied with the terms of the CAO.\nNo further actions are necessary with regards to the CAO. This case is now closed.\nAccordingly, all pressure restrictions established by the CAO are withdrawn. FGT can return\nthis pipeline segment to its maximum allowable operating pressure (MAOP).\nPlease be advised that this letter refers only to the CAO (CPF 2-2009-1002H) and not to any\nother PHMSA pending cases. Also be advised that nothing herein states or implies that the\nabove described pipeline segment meet the requirements of the federal pipeline safety\nregulations. The pipeline system remains subject to inspection by PHMSA.\nSincerely,\nWayne T. Lemoi\nDirector, Office of Pipeline Safety\nPHMSA Southern Region","truncated":false,"body_characters":2480}